共 21 条
[11]
An integrated multi-product, multi-buyer supply chain under penalty, green, and quality control polices and a vendor managed inventory with consignment stock agreement: The outer approximation with equality relaxation and augmented penalty algorithm
[J].
APPLIED MATHEMATICAL MODELLING,
2019, 69
:223-254
[14]
LINDO Systems Inc, 2021, INVENTORY PRODUCTION
[15]
Lu Y., 2007, DONGNAN DAXUE XUEBAO, V37, P426
[19]
Seifbarghy Mehdi, 2016, Journal of Industrial Engineering International, V12, P29, DOI [10.1007/s40092-015-0126-6, 10.1007/s40092-015-0126-6]