Collaborative Scheduling for Single-Arm Cluster Tools With an Equipment Front-End Module Subject to Chamber Cleaning Requirements

被引:2
作者
Huang, Baoying [1 ,2 ]
Song, Tairan [1 ,2 ]
Wu, Naiqi [1 ,2 ]
Qiao, Yan [1 ,2 ]
机构
[1] Macau Univ Sci & Technol, Macao Inst Syst Engn, Macau, Peoples R China
[2] Macau Univ Sci & Technol, Collaborat Lab Intelligent Sci & Syst, Macau, Peoples R China
来源
IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS | 2024年 / 54卷 / 10期
关键词
Cluster tool; equipment front-end module (EFEM); scheduling; semiconductor manufacturing; RESIDENCY TIME CONSTRAINTS; WAFER TYPES; OPERATIONS; ALGORITHM;
D O I
10.1109/TSMC.2024.3409727
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In semiconductor manufacturing, cluster tools tend to integrate a vacuum module (VM), a loadlock module (LLM), and an equipment front-end module (EFEM). While scheduling techniques exist for cluster tools without EFEM, the collaboration among these modules introduces additional challenges for tools with EFEM. In such tools, LLM acting as a shared module plays a crucial role in operating a cluster tool. Moreover, modern fabs have adopted the practice of chamber cleaning after processing each wafer to eliminate chemical residue that may remain within chambers. This article addresses a cyclic scheduling problem of a single-arm cluster tool with EFEM, while considering chamber cleaning requirements. We propose a conflict-free loadlock (LL) state transformation sequence of One-in and One-out LLs to describe the transformations resulted from LL operations. We then present cooperative strategies for robots to access LLM during the state transformation. Based on these strategies, we derive closed-form algorithms to find feasible and optimal schedules in terms of tool cycle time, allowing for an analysis of the best-performing strategy combinations. The effectiveness of the proposed algorithm is illustrated by experimental results.
引用
收藏
页码:5912 / 5924
页数:13
相关论文
共 43 条
[21]   Closing-Down Optimization for Single-Arm Cluster Tools Subject to Wafer Residency Time Constraints [J].
Qiao, Yan ;
Zhou, Mengchu ;
Wu, Naiqi ;
Li, Zhiwu ;
Zhu, Qinghua .
IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2021, 51 (11) :6792-6807
[22]   Scheduling of Time-Constrained Single-Arm Cluster Tools with Two-Space Process Modules in Semiconductor Manufacturing [J].
Zou, ChengYu ;
Wang, GengHong ;
Gu, Lei ;
Li, Jie ;
Wu, NaiQi ;
Qiao, Yan .
IEEE ROBOTICS AND AUTOMATION LETTERS, 2024, 9 (07) :6352-6359
[23]   A Cyclic Scheduling Approach to Single-Arm Cluster Tools With Multiple Wafer Types and Residency Time Constraints [J].
Wang, Jipeng ;
Pan, Chunrong ;
Hu, Hesuan ;
Li, Liang ;
Zhou, Yuan .
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2019, 16 (03) :1373-1386
[24]   Petri net-based scheduling of time constrained single-arm cluster tools with wafer revisiting [J].
Liu, ZiCheng ;
Wu, NaiQi ;
Yang, FaJun .
ADVANCES IN MECHANICAL ENGINEERING, 2016, 8 (05) :1-13
[25]   Scheduling and Control of Startup Process for Single-Arm Cluster Tools With Residency Time Constraints [J].
Qiao, Yan ;
Zhou, MengChu ;
Wu, Naiqi ;
Zhu, QingHua .
IEEE TRANSACTIONS ON CONTROL SYSTEMS TECHNOLOGY, 2017, 25 (04) :1243-1256
[26]   Scheduling method for single-arm cluster tools of wafer fabrications with residency and continuous reentrancy [J].
Zhou, Binghai ;
Wang, Zhu ;
Chen, Jia .
Journal of Southeast University (English Edition), 2013, 29 (02) :187-193
[27]   Scheduling of Single-arm Cluster Tools with Multi-Type Wafers and Shared PMs [J].
Wang, Jipeng ;
Pan, Chunrong ;
Hu, Hesuan ;
Zhou, Yuan .
2017 13TH IEEE CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2017, :1046-1051
[28]   Scheduling of time-constrained single-arm cluster tools with purge operations in wafer fabrications [J].
Yuan, Fenglian ;
Zhao, Qingling ;
Huang, Bo ;
Pan, Chunrong .
JOURNAL OF SYSTEMS ARCHITECTURE, 2023, 134
[29]   Efficient scheduling approaches to time-constrained single-armed cluster tools with condition-based chamber cleaning operations [J].
Li, Chao ;
Yang, Fajun ;
Zhen, Lu .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2022, 60 (11) :3555-3568
[30]   How to Respond to Process Module Failure in Residency Time-Constrained Single-Arm Cluster Tools [J].
Qiao, Yan ;
Wu, Naiqi ;
Pan, ChunRong ;
Zhou, MengChu .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2014, 27 (04) :462-474