Risk management in Egyptian construction: Comparative analysis of general and banking sectors using advanced quantitative methods

被引:0
作者
Abdelhafiez, Ehab A. [1 ]
Awade, Fatma Abady [1 ]
机构
[1] Cairo Univ, Fac Engn, Mech Design & Prod Dept, Cairo, Egypt
关键词
Risk management; Risk in Construction Projects; Banking Construction Projects; Construction Projects in Egypt; Design Structure Matrix (DSM); TOPSIS; DECISION-MAKING; FUZZY; PROJECTS; DELAY; PERFORMANCE;
D O I
10.5267/j.jpm.2024.7.002
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
To effectively manage the challenges associated with meeting schedules, costs, and quality requirements in construction projects, it is crucial to address potential risk factors. Despite extensive research on risk management in construction, a significant gap persists concerning the uniformity of risk factors and their effects across various construction project types, geographical locations, and cultural contexts. This research presents a structured three-step approach to risk management, covering risk identification, analysis, and response. The methodology is applied to both the General Construction (GC) and Banking Construction (BC) sectors in Egypt, involving industry professionals through surveys. Quantitative analysis using the Relative Importance Index (RII) and Fuzzy-set theory gauges the influence of each risk factor, while Spearman Ranked Correlation tests differentiate risk profiles between sectors. A comparative analysis highlights Egypt-specific risk factors versus regional or global factors. Key risk factors with high centrality scores are identified, and optimal risk reduction strategies are selected using the Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS). The study reveals significant sector-specific risk differences and highlights the need for tailored risk management strategies. Key contributions include identifying vital risk factors, comparing them globally and regionally, and proposing effective mitigation strategies to enhance project timelines, costs, and quality. (c) 2024 Growing Science Ltd. All rights reserved.
引用
收藏
页码:471 / 484
页数:14
相关论文
共 43 条
[21]   Current research trends and application areas of fuzzy and hybrid methods to the risk assessment of construction projects [J].
Islam, Muhammad Saiful ;
Nepal, Madhav Prasad ;
Skitmore, Martin ;
Attarzadeh, Meghdad .
ADVANCED ENGINEERING INFORMATICS, 2017, 33 :112-131
[22]  
Jomaah I. M., 2014, J INT ACAD RES MULTI, P393
[23]  
Kartam N.A., 2001, INT J OFPROJECT MANA, V19, P325, DOI [10.1016/S0263-7863(00)00014-4, DOI 10.1016/S0263-7863(00)00014-4]
[24]   Deterministic and Probabilistic Risk Management Approaches in Construction Projects: A Systematic Literature Review and Comparative Analysis [J].
Khodabakhshian, Ania ;
Puolitaival, Taija ;
Kestle, Linda .
BUILDINGS, 2023, 13 (05)
[25]  
Knuth D. E., 2009, TUTORIAL QUICK START
[26]   Delays and cost increases in the construction of private residential projects in Kuwait [J].
Koushki, P. A. ;
Al-Rashid, K. ;
Kartam, N. .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (03) :285-294
[27]   Using fuzzy multiple criteria decision making approach to enhance risk assessment for metropolitan construction projects [J].
Kuo, Yao-Chen ;
Lu, Shih-Tong .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (04) :602-614
[28]   Delay and Cost Overruns in Vietnam Large Construction Projects: A Comparison with Other Selected Countries [J].
Le-Hoai, Long ;
Lee, Young Dai ;
Lee, Jun Yong .
KSCE JOURNAL OF CIVIL ENGINEERING, 2008, 12 (06) :367-377
[29]  
Lo T. Y., 2006, J CONSTR ENG M ASCE, DOI [10.1061/ASCE0733-93642006132:6636, DOI 10.1061/ASCE0733-93642006132:6636]
[30]   Fishbone diagram and risk matrix analysis method and its application in safety assessment of natural gas spherical tank [J].
Luo, Tongyuan ;
Wu, Chao ;
Duan, Lixiang .
JOURNAL OF CLEANER PRODUCTION, 2018, 174 :296-304