CTGAN-Based Model to Mitigate Data Scarcity for Cost Estimation in Green Building Projects

被引:3
|
作者
Hong, Eunbin [1 ]
Yi, June-Seong [2 ]
Lee, Donghwan [3 ]
机构
[1] Ewha Womans Univ, Dept Architectural & Urban Engn, Seoul 03760, South Korea
[2] Ewha Womans Univ, Dept Architectural & Urban Syst Engn, Seoul 03760, South Korea
[3] Ewha Womans Univ, Dept Stat, Seoul 03760, South Korea
关键词
Cost estimation; Small data; Data augmentation; Conditional tabular generative adversarial networks (CTGANs); Green buildings; NEURAL-NETWORK;
D O I
10.1061/JMENEA.MEENG-5880
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study presents a method for estimating construction costs, even when dealing with limited and unreliable data, to enhance decision-making in the early project stages. Owners, particularly in green building projects, often face challenges due to the scarcity of usable data, making cost estimation a complex task. They struggle to differentiate between costs associated with existing buildings and green buildings. To address this issue, we introduce a novel approach that leverages conditional tabular generative adversarial networks (CTGANs) for data augmentation, overcoming the limitations of relying solely on historical data. This involves training an artificial neural network (ANN)-based model using synthetic data, effectively addressing the scarcity and imbalance present in the original small data set. Compared to models trained exclusively on the original data set, our approach yielded a remarkable reduction of approximately 66% in root-mean-square error (RMSE), while increasing the validity from 0% to 15.09%. This study not only improves construction cost estimation but also facilitates more informed decision-making for owners, even in cases with limited and unreliable data, ultimately contributing to the efficiency of the construction project planning process.
引用
收藏
页数:17
相关论文
共 50 条
  • [1] CTGAN-based oversampling and cost-sensitive deep neural network to predict smart money activity in stock market
    Pranita Baro
    Malaya Dutta Borah
    International Journal of Information Technology, 2025, 17 (3) : 1489 - 1499
  • [2] Semi-automatic and specification-compliant cost estimation for tendering of building projects based on IFC data of design model
    Ma, Zhiliang
    Wei, Zhenhua
    Zhang, Xiude
    AUTOMATION IN CONSTRUCTION, 2013, 30 : 126 - 135
  • [3] Application and prospect of machine learning techniques in cost estimation of building projects
    Wang, Rui
    Salleh, Hafez
    Lyu, Jun
    Abdul-Samad, Zulkiflee
    Radzuan, Nabilah Filzah Mohd
    Wen, Kok Ching
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024,
  • [4] BIM-based intelligent acquisition of construction information for cost estimation of building projects
    Ma, Zhiliang
    Liu, Zhe
    CREATIVE CONSTRUCTION CONFERENCE 2014, 2014, 85 : 358 - 367
  • [5] A Final Cost Estimating Model for Building Renovation Projects
    Papadimitriou, Vasso E.
    Aretoulis, Georgios N.
    BUILDINGS, 2024, 14 (04)
  • [6] Hybrid approach for cost estimation of sustainable building projects using artificial neural networks
    Al-Somaydaii, Jumaa A.
    Albadri, Aminah T.
    Al-Zwainy, Faiq M. S.
    OPEN ENGINEERING, 2024, 14 (01):
  • [7] Determination of the Data Model for Heterogeneous Data Processing Based on Cost Estimation
    Zhang, Jianping
    Li, Hui
    Zhang, Xiaoping
    Chen, Mei
    Dai, Zhenyu
    Zhu, Ming
    ARTIFICIAL INTELLIGENCE AND ALGORITHMS IN INTELLIGENT SYSTEMS, 2019, 764 : 374 - 383
  • [8] ANN-based estimation model for the preconstruction cost of pavement rehabilitation projects
    Shehab, Tariq
    Blampied, Nigel
    Nasr, Elhami
    Sindhu, Laxmi
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (08) : 894 - 901
  • [9] Preliminary Engineering Cost Estimation Model for Bridge Projects
    Hollar, Donna A.
    Rasdorf, William
    Liu, Min
    Hummer, Joseph E.
    Arocho, Ingrid
    Hsiang, Simon M.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (09) : 1259 - 1267
  • [10] Neural Network and Econometric-Based Utility Parameter Model for Cost Management of Building Projects
    Lekan, Amusan
    Olabosipo, Fagbenle
    Timothy, Mosaku
    Charles, Ayo
    Dele, Owolabi
    Ignatious, Omuh
    Patricia, Tunji-Olayeni
    Ayodeji, Ogunde
    Joy, Peter
    VISION 2020: SUSTAINABLE GROWTH, ECONOMIC DEVELOPMENT, AND GLOBAL COMPETITIVENESS, VOLS 1-5, 2014, : 3115 - 3136