Modeling Renewable Warranties and Post-Warranty Replacements for Self-Announcing Failure Products Subject to Mission Cycles

被引:3
作者
Shang, Lijun [1 ]
Chen, Jianhui [2 ]
Liu, Baoliang [3 ]
Lin, Cong [4 ]
Yang, Li [5 ]
机构
[1] Foshan Univ, Sch Qual Management & Standardizat, Foshan 528225, Peoples R China
[2] China North Standardizat Ctr, Beijing 100089, Peoples R China
[3] Shanxi Datong Univ, Coll Math & Stat, Datong 037054, Peoples R China
[4] AVIC China Areo Polytechnol Estab, Beijing 100028, Peoples R China
[5] Beihang Univ, Sch Reliabil & Syst Engn, Beijing 100191, Peoples R China
来源
SYMMETRY-BASEL | 2024年 / 16卷 / 05期
基金
中国国家自然科学基金;
关键词
failure number; mission cycles; post-warranty replacement; renewable free-repair-replacement warranty; AVAILABILITY ANALYSIS; SYSTEMS SUBJECT; MAINTENANCE; POLICY; COST; DESIGN; SOLD;
D O I
10.3390/sym16050603
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
The number of failures serves as a critical indicator that dynamically impacts the reliability of self-announcing failure products, making it highly practical to incorporate the failure count into reliability management throughout the entire product life cycle. This paper investigates comprehensive methodologies for effectively managing the reliability of self-announcing failure products throughout both the warranty and post-warranty stages, taking into account factors such as the failure count, mission cycles, and limited time duration. Three renewable warranty strategies are introduced alongside proposed models for post-warranty replacements. By analyzing variables like the failure number, mission cycles, and time constraints, these proposed warranties provide practical frameworks for efficient reliability management during the warranty stage. Additionally, the introduced warranties utilize cost and time metrics to extract valuable insights that inform decision making and enable effective reliability management during the warranty stage. Moreover, this study establishes cost and time metrics for key post-warranty replacements, facilitating the development of individual cost rates and model applications in other post-warranty scenarios. Analyses of the renewable free-repair-replacement warranties demonstrate that establishing an appropriate number of failures as the replacement threshold can effectively reduce warranty-servicing costs and extend the coverage duration.
引用
收藏
页数:28
相关论文
共 47 条
[1]   Optimal production run length and warranty period for an imperfect production system under selling price dependent on warranty period [J].
Chen, Cheng-Kang ;
Lo, Chih-Chung ;
Weng, Tzu-Chun .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 259 (02) :401-412
[2]   Condition-based opportunistic maintenance policies with two-phase inspections for continuous-state systems [J].
Chen, Yuan ;
Qiu, Qingan ;
Zhao, Xian .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2022, 228
[3]   Bayesian estimation of Weibull mixture in heavily censored data setting [J].
Ducros, Florence ;
Pamphile, Patrick .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2018, 180 :453-462
[4]   A study of process monitoring based on inverse Gaussian distribution [J].
Guo, Baocai ;
Wang, Bing Xing ;
Xie, Min .
COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 76 :49-59
[5]   Cost analysis for multi-component system with failure interaction under renewing free-replacement warranty [J].
Liu, Bin ;
Wu, Jun ;
Xie, Min .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 243 (03) :874-882
[6]   Generalized non-renewing replacement warranty policy and an age-based post-warranty maintenance strategy [J].
Liu, Peng ;
Wang, Guanjun .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 311 (02) :567-580
[7]   Optimal replacement strategies for warranty products with multiple failure modes after warranty expiry [J].
Liu, Peng ;
Wang, Guanjun ;
Su, Peng .
COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 153
[8]   Data-driven dynamic adaptive replacement policy for units subject to heterogeneous degradation [J].
Lu, Biao ;
Chen, Zhen ;
Zhao, Xufeng .
COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 171
[9]   Remaining lifetime of degrading systems continuously monitored by degrading sensors [J].
Mukhopadhyay, Koushiki ;
Liu, Bin ;
Bedford, Tim ;
Finkelstein, Maxim .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2023, 231
[10]   Optimization of periodic preventive maintenance policy following the expiration of two-dimensional warranty [J].
Park, Minjae ;
Jung, Ki Mun ;
Park, Dong Ho .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2018, 170 :1-9