Optimization of short-term hydropower scheduling with dynamic reservoir capacity based on improved genetic algorithm and parallel computing

被引:10
|
作者
Zhang, Rongqi [1 ]
Zhang, Shanghong [1 ]
Wen, Xiaoxiong [1 ]
Yue, Ziqi [1 ]
Zhou, Yang [1 ]
机构
[1] North China Elect Power Univ, Sch Water Resources & Hydropower Engn, Beijing, Peoples R China
基金
中国国家自然科学基金;
关键词
Reservoir Optimization Scheduling; Three Gorges Reservoir; Genetic Algorithm; Parallel Computing; OpenMP; 3; GORGES;
D O I
10.1016/j.jhydrol.2024.131238
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The optimal scheduling of hydropower plants is important for the efficient operation and management of hydropower energy systems. In the short-term optimization scheduling of river-type reservoirs, the dynamic reservoir capacity is a key factor. Currently, the short-term power generation scheduling model considering dynamic reservoir capacity was solved by the enumeration method, providing a more accurate simulation of the water flow process compared to the model considering static reservoir capacity. However, the solving process had the disadvantage of a large computational burden and excessive time consumption, which restricted application in the actual scheduling of reservoirs. Therefore, to solve the time-consuming problem of repeated calculation of hydrodynamics model in optimization scheduling, an improved genetic algorithm including adaptive and elitist-selection strategies combined with the parallel computing technique was proposed. The optimal scheduling plan generated by this model were compared with the optimization results of the enumeration method and the genetic algorithm scheduling model. The results showed that the optimal power generation selected by the three models were extremely similar and the optimization model could find the optimal value for the scheduling period. In terms of computing speed, the improved genetic algorithm parallel technique took approximately 0.8 h, around 246 times faster than the enumeration method and 20 times faster than the model without using parallel computing. It demonstrates that the present algorithm is practically usable, significantly enhancing the optimization efficiency of scheduling solutions. Furthermore, it satisfies the engineering application efficiency requirements and can provide technical support for the subsequent power generation scheduling of the Three Gorges Reservoir.
引用
收藏
页数:10
相关论文
共 50 条
  • [1] Refined Scheduling Based on Dynamic Capacity Model for Short-term Hydropower Generation
    Zhang, Rongqi
    Zhang, Shanghong
    Wen, Xiaoxiong
    Jing, Zhu
    WATER RESOURCES MANAGEMENT, 2023, 37 (01) : 21 - 35
  • [2] Refined Scheduling Based on Dynamic Capacity Model for Short-term Hydropower Generation
    Rongqi Zhang
    Shanghong Zhang
    Xiaoxiong Wen
    Zhu Jing
    Water Resources Management, 2023, 37 : 21 - 35
  • [3] GENETIC ALGORITHM BASED SHORT-TERM SCHEDULING OF REACTIVE POWER CONTROLLERS
    Shaheen, Husam
    Ma, Jia
    Cheng, Shijie
    ISTANBUL UNIVERSITY-JOURNAL OF ELECTRICAL AND ELECTRONICS ENGINEERING, 2005, 5 (02): : 1419 - +
  • [4] Parallel Multi-Objective Genetic Algorithm for Short-Term Economic Environmental Hydrothermal Scheduling
    Feng, Zhong-Kai
    Niu, Wen-Jing
    Zhou, Jian-Zhong
    Cheng, Chun-Tian
    Qin, Hui
    Jiang, Zhi-Qiang
    ENERGIES, 2017, 10 (02):
  • [5] A genetic algorithm solution to the optimal short-term hydrothermal scheduling
    Kumar, V. Senthil
    Mohan, M. R.
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2011, 33 (04) : 827 - 835
  • [6] Multi-objective optimized scheduling model for hydropower reservoir based on improved particle swarm optimization algorithm
    Fang, Ruiming
    Popole, Zouthi
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2020, 27 (12) : 12842 - 12850
  • [7] Cloud Computing Task Scheduling Algorithm Based On Improved Genetic Algorithm
    Fang Yiqiu
    Xiao Xia
    Ge Junwei
    PROCEEDINGS OF 2019 IEEE 3RD INFORMATION TECHNOLOGY, NETWORKING, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (ITNEC 2019), 2019, : 852 - 856
  • [8] A grasshopper optimization algorithm for optimal short-term hydrothermal scheduling
    Zeng, Xie
    Hammid, Ali Thaeer
    Kumar, Nallapaneni Manoj
    Subramaniam, Umashankar
    Almakhles, Dhafer J.
    ENERGY REPORTS, 2021, 7 : 314 - 323
  • [9] Short-Term Traffic Prediction Based on Genetic Algorithm Improved Neural Network
    Qian, Yong-sheng
    Zeng, Jun-wei
    Zhang, Shan-fu
    Xu, De-jie
    Wei, Xu-ting
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2020, 27 (04): : 1270 - 1276
  • [10] Reactive Power Optimization of Hydropower Station Based on Improved Genetic Algorithm
    Tian, Wei
    Wang, Jinchan
    Ye, Yucheng
    Chen, Wei
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 2214 - +