Research on Multi-Objective Flexible Job Shop Scheduling Problem with Setup and Handling Based on an Improved Shuffled Frog Leaping Algorithm

被引:0
|
作者
Kong, Jili [1 ]
Yang, Yi [1 ]
机构
[1] Beijing Univ Posts & Telecommun, Sch Modern Post, Sch Automat, Beijing 100876, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2024年 / 14卷 / 10期
关键词
flexible job shop scheduling; multi-equipment work center; machine setup and job handling; multi-objective optimization; improved shuffled frog leaping algorithm; OPTIMIZATION; SEARCH;
D O I
10.3390/app14104029
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
Flexible job shop scheduling problem (FJSP), widely prevalent in many intelligent manufacturing industries, is one of the most classic problems of production scheduling and combinatorial optimization. In actual manufacturing enterprises, the setup of machines and the handling of jobs have an important impact on the scheduling plan. Furthermore, there is a trend for a cluster of machines with similar functionalities to form a work center. Considering the above constraints, a new order-driven multi-equipment work center FJSP model with setup and handling including multiple objectives encompassing the minimization of the makespan, the number of machine shutdowns, and the number of handling batches is established. An improved shuffled frog leading algorithm is designed to solve it through the optimization of the initial solution population, the improvement of evolutionary operations, and the incorporation of Pareto sorting. The algorithm also combines the speed calculation method in the gravity search algorithm to enhance the stability of the solution search. Some standard FJSP data benchmarks have been selected to evaluate the effectiveness of the algorithm, and the experimental results confirm the satisfactory performance of the proposed algorithm. Finally, a problem example is designed to demonstrate the algorithm's capability to generate an excellent scheduling plan.
引用
收藏
页数:27
相关论文
共 50 条
  • [41] An improved artificial bee colony algorithm for solving multi-objective low-carbon flexible job shop scheduling problem
    Li, Yibing
    Huang, Weixing
    Wu, Rui
    Guo, Kai
    APPLIED SOFT COMPUTING, 2020, 95
  • [42] An algorithm based on discrete shuffled frog leaping for No-idle permutation flow shop scheduling problem
    Wang, Ya-Min
    Ji, Jun-Zhong
    Pan, Quan-Ke
    Beijing Gongye Daxue Xuebao / Journal of Beijing University of Technology, 2010, 36 (01): : 124 - 130
  • [43] Multi-objective flexible job shop scheduling of batch production
    School of Mechatronic Engineering, Jinling Institute of Technology, Nanjing 210001, China
    不详
    Jixie Gongcheng Xuebao/Chinese Journal of Mechanical Engineering, 2007, 43 (08): : 148 - 154
  • [44] Multi-objective flexible job shop scheduling problem using variable neighborhood evolutionary algorithm
    Wang, Chun
    Ji, Zhicheng
    Wang, Yan
    MODERN PHYSICS LETTERS B, 2017, 31 (19-21):
  • [45] Multi-objective flexible job shop scheduling based on feature information optimization algorithm
    Guo, Zeyin
    Wei, Lixin
    Zhang, Jinlu
    Hu, Ziyu
    Sun, Hao
    Li, Xin
    COMPUTERS & OPERATIONS RESEARCH, 2025, 179
  • [46] A Multi-objective Memetic Algorithm for the Job-Shop Scheduling Problem
    Frutos, Mariano
    Tohme, Fernando
    OPERATIONAL RESEARCH, 2013, 13 (02) : 233 - 250
  • [47] A Multi-objective Memetic Algorithm for the Job-Shop Scheduling Problem
    Mariano Frutos
    Fernando Tohmé
    Operational Research, 2013, 13 : 233 - 250
  • [48] A multi-objective genetic algorithm based on immune and entropy principle for flexible job-shop scheduling problem
    Xiaojuan Wang
    Liang Gao
    Chaoyong Zhang
    Xinyu Shao
    The International Journal of Advanced Manufacturing Technology, 2010, 51 : 757 - 767
  • [49] Multi-objective flexible job shop scheduling using hybrid differential evolution algorithm
    Balaraju, G.
    Venkatesh, Sriram
    Reddy, B. Siva Prasad
    International Journal of Internet Manufacturing and Services, 2014, 3 (03) : 226 - 243
  • [50] A multi-objective genetic algorithm based on immune and entropy principle for flexible job-shop scheduling problem
    Wang, Xiaojuan
    Gao, Liang
    Zhang, Chaoyong
    Shao, Xinyu
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 51 (5-8) : 757 - 767