Research on Multi-Objective Flexible Job Shop Scheduling Problem with Setup and Handling Based on an Improved Shuffled Frog Leaping Algorithm

被引:0
|
作者
Kong, Jili [1 ]
Yang, Yi [1 ]
机构
[1] Beijing Univ Posts & Telecommun, Sch Modern Post, Sch Automat, Beijing 100876, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2024年 / 14卷 / 10期
关键词
flexible job shop scheduling; multi-equipment work center; machine setup and job handling; multi-objective optimization; improved shuffled frog leaping algorithm; OPTIMIZATION; SEARCH;
D O I
10.3390/app14104029
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
Flexible job shop scheduling problem (FJSP), widely prevalent in many intelligent manufacturing industries, is one of the most classic problems of production scheduling and combinatorial optimization. In actual manufacturing enterprises, the setup of machines and the handling of jobs have an important impact on the scheduling plan. Furthermore, there is a trend for a cluster of machines with similar functionalities to form a work center. Considering the above constraints, a new order-driven multi-equipment work center FJSP model with setup and handling including multiple objectives encompassing the minimization of the makespan, the number of machine shutdowns, and the number of handling batches is established. An improved shuffled frog leading algorithm is designed to solve it through the optimization of the initial solution population, the improvement of evolutionary operations, and the incorporation of Pareto sorting. The algorithm also combines the speed calculation method in the gravity search algorithm to enhance the stability of the solution search. Some standard FJSP data benchmarks have been selected to evaluate the effectiveness of the algorithm, and the experimental results confirm the satisfactory performance of the proposed algorithm. Finally, a problem example is designed to demonstrate the algorithm's capability to generate an excellent scheduling plan.
引用
收藏
页数:27
相关论文
共 50 条
  • [21] Multi-objective flexible job shop scheduling problem with key objectives
    Guo, Chengzhi
    Li, Ming
    Lei, Deming
    2019 34RD YOUTH ACADEMIC ANNUAL CONFERENCE OF CHINESE ASSOCIATION OF AUTOMATION (YAC), 2019, : 23 - 27
  • [22] A Newton-based heuristic algorithm for multi-objective flexible job-shop scheduling problem
    Miguel A. Fernández Pérez
    Fernanda M. P. Raupp
    Journal of Intelligent Manufacturing, 2016, 27 : 409 - 416
  • [23] A cloud based improved method for multi-objective flexible job-shop scheduling problem
    Ning, Tao
    Jin, Hua
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2018, 35 (01) : 823 - 829
  • [24] A Pareto based discrete Jaya algorithm for multi-objective flexible job shop scheduling problem
    Caldeira, Rylan H.
    Gnanavelbabu, A.
    EXPERT SYSTEMS WITH APPLICATIONS, 2021, 170
  • [25] Improved NSGA2 Algorithm to Solve Multi-Objective Flexible Job Shop Scheduling Problem
    Liang, Xu
    Liu, Yifan
    Huang, Ming
    2020 IEEE 8TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND NETWORK TECHNOLOGY (ICCSNT), 2020, : 22 - 25
  • [26] Solving multi-objective fuzzy flexible job shop scheduling problem using MABC algorithm
    Zhong Yuguang
    Yang Fan
    Liu Feng
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2019, 36 (02) : 1455 - 1473
  • [27] Flow Shop Scheduling Problem with Limited Buffer Based on Hybrid Shuffled Frog Leaping Algorithm
    Liang, Xu
    Wang, Peixuan
    Huang, Ming
    PROCEEDINGS OF 2019 IEEE 7TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND NETWORK TECHNOLOGY (ICCSNT 2019), 2019, : 87 - 93
  • [28] Multi-objective Flexible Job Shop Scheduling Problem with Energy Consumption Constraint Using Imperialist Competitive Algorithm
    Guo, Chengzhi
    Lei, Deming
    INTELLIGENT COMPUTING THEORIES AND APPLICATION, PT I, 2018, 10954 : 659 - 669
  • [29] Immune Genetic Algorithm for Multi-objective Flexible Job-shop Scheduling Problem
    Ren, Huizhi
    Xu, Han
    Sun, Shenshen
    PROCEEDINGS OF THE 28TH CHINESE CONTROL AND DECISION CONFERENCE (2016 CCDC), 2016, : 2167 - 2171
  • [30] Multi-objective Flexible Job Shop Schedule Based on Improved Ant Colony Algorithm
    Li, Li
    Wang, Keqi
    ICIA: 2009 INTERNATIONAL CONFERENCE ON INFORMATION AND AUTOMATION, VOLS 1-3, 2009, : 1158 - +