共 50 条
- [1] FIELD CEMENTING PRACTICES HELP CONTROL LOST CIRCULATION AT THE GEYSERS NEW HORIZONS, 1988, 12 : 37 - 40
- [2] Lost circulation in primary well cementing 13TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, GHGT-13, 2017, 114 : 5182 - 5192
- [3] Cementing technique of lost circulation formation in eastern Sichuan Shi You Zuan Cai Gong Yi/Oil Drilling and Production Technology, 1996, 18 (01): : 47 - 50
- [4] LABORATORY AND FIELD-EVALUATION OF POLYURETHANE FOAM FOR LOST CIRCULATION CONTROL GEYSERS - THREE DECADES OF ACHIEVEMENT : A WINDOW ON THE FUTURE, 1989, 13 : 517 - 524
- [5] GAS LEAKAGE IN PRIMARY CEMENTING - FIELD-STUDY AND LABORATORY INVESTIGATION JOURNAL OF PETROLEUM TECHNOLOGY, 1976, 28 (NOV): : 1361 - 1369
- [7] Best practice in understanding and managing lost circulation challenges SPE Drilling and Completion, 2008, 23 (02): : 168 - 175
- [9] CEMENTING - BRIDGING THE GAP FROM LABORATORY RESULTS TO FIELD OPERATIONS JOURNAL OF PETROLEUM TECHNOLOGY, 1982, 34 (12): : 2843 - 2852
- [10] The Study of Drilling Technology and Field Cases for Preventing A Lost Circulation in Fractured Reservoirs ECONOMIC AND ENVIRONMENTAL GEOLOGY, 2016, 49 (01): : 63 - 75