共 66 条
[5]
Brandimarte P., 1993, Annals of Operations Research, V41, P157, DOI 10.1007/BF02023073
[7]
Two Stage Approach to Address the Flexible Job Shop Scheduling Problem Using an Evolutionary Algorithm Considering Random Machine Breakdowns
[J].
3RD INTERNATIONAL CONFERENCE ON FRONTIERS IN AUTOMOBILE AND MECHANICAL ENGINEERING (FAME 2020),
2020, 2311
[9]
NSGA-II applied to dynamic flexible job shop scheduling problems with machine breakdown
[J].
MODERN PHYSICS LETTERS B,
2018, 32 (34-36)