Influence of wellhead pressure and water cut in the optimization of oil production from gas lifted wells

被引:26
作者
Hari, S. [1 ,2 ]
Krishna, Shanker [1 ,2 ]
Patel, Manav [2 ]
Bhatia, Pooja [2 ]
Vij, Rakesh Kumar [1 ,2 ]
机构
[1] Pandit Deendayal Energy Univ, Drilling Cementing & Stimulat DCS Res Ctr, Gandhinagar 382426, Gujarat, India
[2] Pandit Deendayal Energy Univ, Sch Petr Technol, Gandhinagar 382426, Gujarat, India
关键词
Artificial lift; Continuous gas lift; Productivity; Water cut; Wellhead pressure; ALLOCATION; FLOW; SYSTEM; INJECTION; MODEL;
D O I
10.1016/j.ptlrs.2021.09.008
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The worldwide increase in energy demand necessitates the development and optimization of marginal oil fields for sustenance. In this regard, effective and economic production of fluids are heavily relied upon the artificial lift techniques as the reservoir's natural energy may not be able to deliver the fluids to the surface. Gas lift is a widely practised and successful method that is suitable for rejuvenating the oil production from such fields. In this study, the influence of critical parameters like water cut, wellhead pressure (WHP) and gas-lift gas injection rate on the output from a gas lifted well was analysed. A significant reduction in the oil production was observed with the increase in water cut. For a fixed gas injection rate of 1 Mmscf/day, the production decreased by 26.90% when the water cut increased from 15% to 30% and further by 50.80% when the water cut reached 45%. An increase in the gas injection rate from 1 Mmscf/day to 8 Mmscf/day resulted in an increase in the production rate by 29.21%, 40.48% and 56.56% for 15%, 30%, and 45% water cut conditions, respectively. It was observed that there is a drop in the oil rate with the increase in WHP for a constant gas injection rate. An increase in the WHP from 100 psi to 300 psi resulted in a drop in the oil production rate by 11.01%, 11.78% and 12.74% for 15%, 30% and 45% water cut conditions, respectively. The study sheds light on the significance of optimizing the critical parameters to maximize the production from a well, with severely affected productivity, using a continuous gas lift system. (c) 2021 The Authors. Publishing services provided by Elsevier B.V. on behalf of KeAi Communication Co. Ltd. This is an open access article under the CC BY license (http://creativecommons.org/licenses/by/4.0/).
引用
收藏
页码:253 / 262
页数:10
相关论文
共 62 条
[1]   Global optimization of gas allocation to a group of wells in artificial lift using nonlinear constrained programming [J].
Alarcón, GA ;
Torres, CF ;
Gómez, LE .
JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 2002, 124 (04) :262-268
[2]  
Arachman F., 2017, SPE IATMI AS PAC OIL, DOI [10.2118/186970-ms, DOI 10.2118/186970-MS]
[3]   CRITERIA FOR GAS-LIFT STABILITY [J].
ASHEIM, H .
JOURNAL OF PETROLEUM TECHNOLOGY, 1988, 40 (11) :1452-1456
[4]   Intermittent gas lift in Aghajari oil field, a mathematical study [J].
Ayatollahi, S ;
Narimani, M ;
Moshfeghian, M .
JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2004, 42 (2-4) :245-255
[5]  
Beggs H.D., 2003, PRODUCTION OPTIMIZAT, V2nd
[6]   Assessment of total oil production in gas-lift process of wells using, Box-Behnken design of experiments in comparison with traditional approach [J].
Behjoomanesh, Milad ;
Keyhani, Mohammad ;
Ganji-azad, Ehsan ;
Izadmehr, Mojtaba ;
Riahi, Siavash .
JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING, 2015, 27 :1455-1461
[7]  
BenAmara A., 2016, SPE MIDDL E ART LIFT, DOI [10.2118/184221-MS, DOI 10.2118/184221-MS]
[8]  
Betancourt S., 2002, SPE INT PETR C EXH M, DOI [10.2118/74391-MS, DOI 10.2118/74391-MS]
[9]   An automation system for gas-lifted oil wells: Model identification, control, and optimization [J].
Camponogara, Eduardo ;
Plucenio, Agustinho ;
Teixeira, Alex F. ;
Campos, Sthener R. V. .
JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2010, 70 (3-4) :157-167
[10]  
Davarpanah Afshin, 2018, Petroleum Research, V3, P239, DOI [10.1016/j.ptlrs.2018.03.005, 10.1016/j.ptlrs.2018.03.005]