Multi-objective optimization for scheduling multi-load automated guided vehicles with consideration of energy consumption

被引:5
作者
Huo, Xiang [1 ,2 ]
He, Xiaozheng [3 ]
Xiong, Zhongxia [1 ,2 ]
Wu, Xinkai [1 ]
机构
[1] Beihang Univ, Sch Transportat Sci & Engn, Beijing 100191, Peoples R China
[2] Beijing Robint Technol Co Ltd, Xueyuan Rd, Beijing 100191, Peoples R China
[3] Rensselaer Polytech Inst, Dept Civil & Environm Engn, Troy, NY 12180 USA
基金
中国国家自然科学基金;
关键词
Multi-load automatic guided vehicles (m-AGVs); Multi-objective mixed integer program (MO-MIP); Scheduling; Non-dominated Sorting Genetic Algorithm; (NSGA-II); NSGA-II; ALGORITHM; MODEL;
D O I
10.1016/j.trc.2024.104548
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
The widespread implementation of modern logistics has led to the extensive use of multi-load automatic guided vehicles (m-AGVs) in automated sorting centers. This paper tackles one of the most challenging problems in this context, i.e., the scheduling of m-AGVs for express package handling. We comprehensively consider the loading and unloading delay of packages and energy consumption of m-AGVs, formulating the problem as a multi-objective mixed integer program (MO-MIP). To solve the proposed optimal scheduling problem, we apply the Non-dominated Sorting Genetic Algorithm (NSGA-II). A series of simulation experiments on three sorting centers have been further conducted to demonstrate the effectiveness and efficiency of the proposed model and solution algorithm.
引用
收藏
页数:26
相关论文
共 46 条
  • [21] Tasks assigning and sequencing of multiple AGVs based on an improved harmony search algorithm
    Li, Guomin
    Li, Xinyu
    Gao, Liang
    Zeng, Bing
    [J]. JOURNAL OF AMBIENT INTELLIGENCE AND HUMANIZED COMPUTING, 2019, 10 (11) : 4533 - 4546
  • [22] Multi-AGV Flexible Manufacturing Cell Scheduling Considering Charging
    Li, Jianxun
    Cheng, Wenjie
    Lai, Kin Keung
    Ram, Bhagwat
    [J]. MATHEMATICS, 2022, 10 (19)
  • [23] Li MP, 2017, WINT SIMUL C PROC, P3311, DOI 10.1109/WSC.2017.8248048
  • [24] MLATSO: A method for task scheduling optimization in multi-load AGVs-based systems
    Lin, Yishuai
    Xu, Yunlong
    Zhu, Jiawei
    Wang, Xuhua
    Wang, Liang
    Hu, Gang
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2023, 79
  • [25] Multi-objective AGV scheduling in an automatic sorting system of an unmanned (intelligent) warehouse by using two adaptive genetic algorithms and a multi-adaptive genetic algorithm
    Liu, Yubang
    Ji, Shouwen
    Su, Zengrong
    Guo, Dong
    [J]. PLOS ONE, 2019, 14 (12):
  • [26] Matos M.R. S., 2018, Electronic Notes in Discrete Mathematics, V69, P13, DOI [10.1016/j.endm.2018.07.003, DOI 10.1016/J.ENDM.2018.07.003]
  • [27] A Pareto-optimization approach for a fair ramp metering
    Meng, Qiang
    Khoo, Hooi Ling
    [J]. TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2010, 18 (04) : 489 - 506
  • [28] Qiu L, 2015, 2015 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND BIOMIMETICS (ROBIO), P1894, DOI 10.1109/ROBIO.2015.7419049
  • [29] Generalized techniques for solving intuitionistic fuzzy multi-objective non-linear optimization problems
    Rani, Deepika
    Ebrahimnejad, Ali
    Gupta, Gourav
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2022, 202
  • [30] Roberto D., 2018, Electronic Notes in Discrete Mathematics, V64, P65, DOI DOI 10.1016/J.ENDM.2018.01.008