共 17 条
[1]
[Anonymous], 2006, Standard IEC 60076-5
[2]
Bertagnolli G., 1996, Short-Circuit Duty of Power Transformers, P33
[3]
CIGRE WG A2.37, 2015, TB 642Transformer Reliability Survey
[4]
CIGRE WG A2.53, 2020, TB 812Advances in the Interpretation of Transformer Frequency Response Analysis (FRA)
[6]
Karsai K., 1987, LARGE POWER TRANSFOR
[7]
The impact of drying and oil impregnation conditions and of temperature cycles on the clamping force of power transformer windings
[J].
CONFERENCE RECORD OF THE 2002 IEEE INTERNATIONAL SYMPOSIUM ON ELECTRICAL INSULATION,
2002,
:350-353
[8]
Krause C., 1999, P CIGRE SC 12 TRANSF
[10]
Madshaven I, 2022, 2022 7TH INTERNATIONAL ADVANCED RESEARCH WORKSHOP ON TRANSFORMERS (ARWTR 2022), P115, DOI 10.23919/ARWtr54586.2022.9959909