STUDY ON CONSTRUCTION MONITORING AND CONTROL OF MULTI-SPAN PRESTRESSED CONCRETE CONTINUOUS BEAM BRIDGE

被引:0
作者
Zheng, Xilong [1 ]
Guan, Di [1 ]
机构
[1] Harbin Univ, Sch Civil & Architectural Engn, 109 Zhongxing Rd, Harbin, Heilongjiang, Peoples R China
来源
CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR | 2024年 / 33卷 / 01期
关键词
Long-span bridge; Continuous beam bridge; Grey system theory; Construction control;
D O I
10.14311/CEJ.2024.01.0005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This article focuses on the construction monitoring and control of a pre-stressed concrete continuous beam bridge, consisting of 13 spans. The goal is to ensure that the bridge structure meets the design requirements throughout the entire construction process. By comparing the theoretical and measured values of the bridge's alignment and stress during the cantilever construction, closure, and completion phases, it can be observed that the deflection deformation of the bridge is generally in agreement with the theoretical calculations. After the completion of the entire bridge, the measured elevations of each section have an error range of -18mm to 20mm compared to the design elevations, which satisfies the specifications. A comparison analysis of the measured and theoretical stress values at the root and mid-span of the cantilever indicates that the stress difference at the root is within the range of -0.2MPa to 0.2MPa, and the stress differences at the mid-span after completion are 0.03MPa (upper) and 0.09MPa (lower), all of which meet the structural design and code requirements. By establishing a gray GM (1,1) model and using gray system theory, the deflection error during the construction process is predicted and controlled. The prediction accuracy of different methods is compared to determine a reasonable prediction method suitable for long-span pre-stressed continuous beam bridges, providing reference for similar engineering projects.
引用
收藏
页码:65 / 77
页数:13
相关论文
共 50 条
  • [31] Multimode Vibration Control Strategies of Long-Span Bridges Subjected to Multi-hazard: A Case Study of the Runyang Suspension Bridge
    Matin Jami
    Rajesh Rupakhety
    Bjarni Bessason
    Jonas Th. Snæbjörnsson
    [J]. Journal of Vibration Engineering & Technologies, 2024, 12 : 4867 - 4880
  • [32] Multimode Vibration Control Strategies of Long-Span Bridges Subjected to Multi-hazard: A Case Study of the Runyang Suspension Bridge
    Jami, Matin
    Rupakhety, Rajesh
    Bessason, Bjarni
    Snaebjoernsson, Jonas Th.
    [J]. JOURNAL OF VIBRATION ENGINEERING & TECHNOLOGIES, 2024, 12 (03) : 4867 - 4880
  • [33] Impact coefficient and reliability of mid-span continuous beam bridge under action of extra heavy vehicle with low speed
    Bo Liu
    You-zhi Wang
    Peng Hu
    Quan Yuan
    [J]. Journal of Central South University, 2015, 22 : 1510 - 1520
  • [34] Research on coupled vibrations between the low-to-medium speed maglev train and a long-span continuous beam bridge
    Xu, Chuyi
    Luo, Hao
    Gan, Xianbei
    Liu, Mougang
    Guo, Hui
    [J]. STRUCTURES, 2023, 56
  • [35] Impact coefficient and reliability of mid-span continuous beam bridge under action of extra heavy vehicle with low speed
    刘波
    王有志
    胡朋
    袁泉
    [J]. Journal of Central South University, 2015, 22 (04) : 1510 - 1520
  • [36] Impact coefficient and reliability of mid-span continuous beam bridge under action of extra heavy vehicle with low speed
    Liu Bo
    Wang You-zhi
    Hu Peng
    Yuan Quan
    [J]. JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2015, 22 (04) : 1510 - 1520
  • [37] Theoretical study on the seismic response of a continuous beam bridge with safe-belt devices
    Tan, Yuqing
    Fang, Rong
    Zhang, Wenxue
    Zhao, Hanqing
    Du, Xiuli
    [J]. SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2021, 151
  • [38] Numerical evaluation of multi-metric data fusion based structural health monitoring of long span bridge structures
    Soman, Rohan
    Kyriakides, Marios
    Onoufriou, Toula
    Ostachowicz, Wieslaw
    [J]. STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2018, 14 (06) : 673 - 684
  • [39] The prediction method of long-span cable-stayed bridge construction control based on BP neural network
    Li Yuansong
    Li Xinping
    Yang Aiping
    [J]. PROCEEDINGS OF THE 9TH WSEAS INTERNATIONAL CONFERENCE ON MATHEMATICAL AND COMPUTATIONAL METHODS IN SCIENCE AND ENGINEERING (MACMESE '07)/ DNCOCO '07, 2007, : 216 - 221
  • [40] Whole Process Performance Design and Construction Quality Control of Encased Concrete of the Tian'e Longtan Bridge
    Chen Z.
    Chen B.
    Wu C.-J.
    Zheng J.-L.
    Ding Q.-J.
    Luo X.-B.
    Xu W.
    Yang Y.
    Zhao G.-X.
    [J]. Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2024, 37 (04): : 201 - 211