LOCOMOTIVE CRASH ENERGY MANAGEMENT TRAIN-TO-TRAIN IMPACT TEST RESULTS

被引:0
|
作者
Llana, Patricia [1 ]
Jacobsen, Karina [1 ]
Stringfellow, Richard [2 ]
机构
[1] Volpe Natl Transportat Syst Ctr, US Dept Transportat, Cambridge, MA 02142 USA
[2] CAMX Power LLC, Lexington, MA 02421 USA
来源
PROCEEDINGS OF 2024 JOINT RAIL CONFERENCE, JRC | 2024年
关键词
D O I
暂无
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
Research to develop new technologies for increasing the safety of passengers and crew in rail equipment is being directed by the Federal Railroad Administration's (FRA's) Office of Research, Data, and Innovation (RD&I). Two crash energy management (CEM) components that can be integrated into the end structure of a locomotive have been developed: a push-back coupler (PBC) and a deformable anti-climber (DAC). These components are designed to work in unison to inhibit override in the event of a collision. The results of vehicle-to-vehicle override, where the strong underframe of one vehicle, typically a locomotive, impacts the weaker superstructure of another vehicle, can be devastating and compromise the occupied space. These CEM components are specifically designed to mitigate the effects of a collision and to prevent override of one of the lead vehicles onto the other. They are designed to improve the crashworthiness of equipped locomotives in a wide range of potential collisions, including collisions with conventional locomotives, conventional cab cars, and freight equipment. In prior research, designs for the two CEM components for retrofit onto the forward end of a locomotive, a DAC and a PBC, were developed, fabricated, and tested. The tests were successful in demonstrating the effectiveness of the two CEM components. In a follow-on program, the two CEM components were integrated into the end structure of a conventional locomotive to demonstrate, through a series of full-scale vehicle collision tests, that these components work together to mitigate the effects of a collision and prevent override. This arrangement of tests allows for evaluation of the CEM-equipped locomotive performance, as well as comparison of measured with simulated locomotive performance in coupling, vehicle-to-vehicle, and train-to-train tests. In the first series of tests, both conventional and CEM coupling tests were conducted. The conventional coupling tests were conducted to establish the speed at which coupling does not cause damage to either of the colliding vehicles. The CEM coupling tests evaluated the performance of the PBC at collision speeds ranging from 2 mph to 9 mph. This test series allowed a performance comparison of a conventional locomotive with a CEM-equipped locomotive during coupling, as well as confirmation that the PBC triggers at a speed well above typical coupling speeds and at the designed force level. The second series of tests comprised two vehicle-to-vehicle collision tests. In Vehicle-to-Vehicle Test #1 (V2VT1), a CEM locomotive impacted a standing conventional locomotive. In Vehicle-to-Vehicle Test #2 (V2VT2), a CEM locomotive impacted a standing consist led by an M1 cab car with trailing freight cars. The vehicle-to-vehicle tests were successful in demonstrating the effectiveness of the components of the CEM system working together as an integrated system to absorb impact energy and to prevent override in two different vehicle-to-vehicle collision scenarios. The computer simulations predicted the behavior of the equipment in both collision scenarios with high fidelity. This paper describes the results of the final test in the test program, the Train-to-Train Test (T2TT). In this test, a CEM locomotive-led consist impacted a standing conventional locomotive-led consist. The primary objective of the test was to demonstrate the effectiveness of the CEM system in a consist, including managing load path, and inhibiting override and lateral buckling. Preparation for this test involved extensive computer simulations, repair of the CEM systems used in previous impact tests, and coordination of numerous research engineers, instrumentation engineers, and test engineers. The target impact speed was 21 mph. The actual speed of the test was 24.3 mph. The CEM system worked exactly as designed, successfully absorbing energy, keeping the vehicles in-line and the impact ends engaged, with no derailment and no signs of override. All test objectives were met, and test results compared favorably with pre-test analysis predictions as well as with post-test analyses run at the actual test speed. Equipment damage is described, and test results are provided and evaluated.
引用
收藏
页数:11
相关论文
共 50 条
  • [21] An analysis of the required energy consumption to tow a classical passenger train with an electric locomotive
    Arsene, S.
    Popa, G.
    INNOVATIVE MANUFACTURING ENGINEERING AND ENERGY (IMANEE 2019) - 50 YEARS OF HIGHER TECHNICAL EDUCATION AT THE UNIVERSITY OF PITESTI, 2019, 564
  • [22] The High Speed Train Crash in Wenzhou: Is It a Failure of Governmental Emergency Management?
    Tong Xing
    Zhang Hai-bo
    PROCEEDINGS OF 2012 INTERNATIONAL CONFERENCE ON PUBLIC ADMINISTRATION (8TH), VOL III, 2012, : 887 - 891
  • [23] The mechanics of train advancement, development and new test results
    Nordmann, H
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1933, 77 : 481 - 483
  • [24] The Impact of Information Technology on the Management of Train Traffic
    Popa, A. M.
    NEW APPROACHES IN SOCIAL AND HUMANISTIC SCIENCES, 2016, : 429 - 432
  • [25] An Optimal Energy Management Strategy for a Hybrid Train
    Chang, Rui
    Liu, Yang
    Cao, Yufeng
    Liu, Jianqiang
    PROCEEDINGS OF THE 10TH HYDROGEN TECHNOLOGY CONVENTION, VOL 1, WHTC 2023, 2024, 393 : 475 - 484
  • [26] Impact test of a crash-energy management passenger rail car
    Jacobsen, K
    Tyrell, D
    Perlman, B
    PROCEEDINGS OF THE 2004 ASME/IEEE JOINT RAIL CONFERENCE, 2004, : 19 - 26
  • [27] Vehicle test for verifying energy-saving train control based on automatic train operation system
    Watanabe S.
    Sato Y.
    Koseki T.
    Mizuma T.
    Tanaka R.
    Miyaji Y.
    Isobe E.
    IEEJ Transactions on Industry Applications, 2017, 137 (12) : 924 - 933
  • [28] On the adequacy of scope test results: Comments on Desvousges, Mathews, and Train
    Chapman, David J.
    Bishop, Richard C.
    Hanemann, W. Michael
    Kanninen, Barbara J.
    Krosnick, Jon A.
    Morey, Edward R.
    Tourangeau, Roger
    ECOLOGICAL ECONOMICS, 2016, 130 : 356 - 360
  • [29] The impact of wind on energy-efficient train control
    Trivella, Alessio
    Wang, Pengling
    Corman, Francesco
    EURO JOURNAL ON TRANSPORTATION AND LOGISTICS, 2021, 10
  • [30] Coordinated train control and energy management control strategies
    Gordon, SP
    Lehrer, DG
    PROCEEDINGS OF THE 1998 ASME/IEEE JOINT RAILROAD CONFERENCE, 1998, : 165 - 176