Optimization of Integrated Tugboat-Berth-Quay Crane Scheduling in Container Ports Considering Uncertainty in Vessel Arrival Times and Berthing Preferences

被引:2
作者
Chu, Liangyong [1 ,2 ]
Zhang, Jiawen [1 ]
Chen, Xiuqian [1 ]
Yu, Qing [1 ]
机构
[1] Jimei Univ, Sch Nav, Xiamen 361021, Peoples R China
[2] Fujian Shipping Res Inst, Xiamen 361021, Peoples R China
关键词
waterway transportation; integrated tugboat-berth-quay crane scheduling; mixed-integer linear programming model; adaptive large neighborhood search algorithm; uncertainty in vessel arrival times; berthing preferences; ALLOCATION PROBLEM; ASSIGNMENT PROBLEM; FORMULATIONS; MODELS;
D O I
10.3390/jmse12091541
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
Influenced by the dynamics of supply and demand, the demand for maritime transport has been increasing annually, putting significant pressure on container ports. To alleviate this pressure, a new mixed-integer programming model for the integrated scheduling of tugboats, berths, and quay cranes has been established. This model considers the uncertainties in vessel arrival times, vessel berthing preferences, time-varying quay crane availability, and the constraint that quay cranes cannot cross each other. The objective is to minimize the total costs including fuel consumption during port stays, delays and waiting times for berthing and departure, berthing deviation costs, tugboat assistance costs, and quay crane handling costs. To obtain high-quality solutions, an adaptive large neighborhood search (ALNS) algorithm was employed to solve the model. The algorithm incorporated five destruction operators and five repair operators that were specifically designed to enhance the solution accuracy and efficiency for the integrated scheduling problem. Several case studies of varying scales, based on a port in China, were used to validate the effectiveness of the proposed model and algorithm. The experimental results demonstrate the model's validity and show that the ALNS algorithm designed for the integrated scheduling problem outperformed CPLEX and other algorithms in terms of the accuracy and efficiency. Finally, a sensitivity analysis of the key parameters provides recommendations for the integrated scheduling of tugboats, berths, and quay cranes, offering valuable insights for port operations.
引用
收藏
页数:27
相关论文
共 34 条
[1]   A novel robust exact decomposition algorithm for berth and quay crane allocation and scheduling problem considering uncertainty and energy efficiency [J].
Chargui, Kaoutar ;
Zouadi, Tarik ;
Sreedharan, V. Raja ;
El Fallahi, Abdellah ;
Reghioui, Mohamed .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2023, 118
[2]   Exact and heuristic methods for the integrated berth allocation and specific time-invariant quay crane assignment problems [J].
Cheimanoff, Nicolas ;
Fontane, Frederic ;
Kitri, Mohamed Nour ;
Tchernev, Nikolay .
COMPUTERS & OPERATIONS RESEARCH, 2022, 141
[3]   A reduced VNS based approach for the dynamic continuous berth allocation problem in bulk terminals with tidal constraints [J].
Cheimanoff, Nicolas ;
Fontane, Frederic ;
Kitri, Mohamed Nour ;
Tchernev, Nikolay .
EXPERT SYSTEMS WITH APPLICATIONS, 2021, 168
[4]   Mathematical models for the berth allocation problem in dry bulk terminals [J].
Ernst, Andreas T. ;
Oguz, Ceyda ;
Singh, Gaurav ;
Taherkhani, Gita .
JOURNAL OF SCHEDULING, 2017, 20 (05) :459-473
[5]   Integrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumption [J].
He, Junliang ;
Huan, Youfang ;
Yan, Wei ;
Wang, Shuaian .
EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (05) :2464-2487
[6]   The dynamic berth allocation problem for a container port [J].
Imai, A ;
Nishimura, E ;
Papadimitriou, S .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2001, 35 (04) :401-417
[7]   Recoverable robustness in weekly berth and quay crane planning [J].
Iris, Cagatay ;
Lam, Jasmine Siu Lee .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2019, 122 :365-389
[8]   Mathematical programming formulations for the strategic berth template problem [J].
Iris, Cagatay ;
Lalla-Ruiz, Eduardo ;
Lam, Jasmine Siu Lee ;
Voss, Stefan .
COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 124 :167-179
[9]   Improved formulations and an Adaptive Large Neighborhood Search heuristic for the integrated berth allocation and quay crane assignment problem [J].
Iris, Cagatay ;
Pacino, Dario ;
Ropke, Stefan .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2017, 105 :123-147
[10]   Integrated Berth Allocation and Quay Crane Assignment Problem: Set partitioning models and computational results [J].
Iris, Cagatay ;
Pacino, Dario ;
Ropke, Stefan ;
Larsen, Allan .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2015, 81 :75-97