A two-stage stochastic programming approach for electric energy procurement of EV charging station integrated with BESS and PV

被引:3
|
作者
Kazemtarghi, Abed [1 ]
Mallik, Ayan [1 ]
机构
[1] Arizona State Univ, Polytech Sch, 6075 Innovat Way W, Mesa, AZ 85212 USA
关键词
Conditional value-at-risk (CVaR); Electric energy procurement; Electric vehicle charging station; Stochastic programming; SCENARIO REDUCTION; LARGE CONSUMERS; STORAGE SYSTEM;
D O I
10.1016/j.epsr.2024.110411
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Energy procurement of an electric vehicle charging station (EVCS) needs medium-term decisions, which depend on the short-term energy transactions of the EVCS in real-time market. However, the energy exchange in real-time operation is affected by uncertainties related to the pool prices, electric vehicle (EV) load demand, and photovoltaic (PV) generation level. To comprehensively include the real-time considerations in the decision framework, this paper proposes a two-stage stochastic programming approach to formulate EVCS energy procurement and optimal equipment dispatch as a single problem. The objective is to minimize the total operational cost of EVCS. First, a decision-making framework is developed that integrates EVCS energy procurement, charging pricing, and equipment dispatch in order to make energy procurement decisions based on random nature of electricity pool prices, EV loads, and PV generation in real-time operations. Next, the developed decision framework is formulated as a two-stage stochastic program with risk modeling using Conditional value-at-risk (CVaR) index. The first-stage variables include medium-term bilateral contracts and EV charging prices, while the second-stage variables encompass energy dispatch of battery energy storage systems (BESS) and energy transactions with the main grid in real-time pool. In addition, uncertainties related to electricity pool prices, EV loads, and PV generation levels are characterized by stochastic scenarios generated based on historical data. The simulation results for an EVCS equipped with DC fast chargers and integrated with BESS and PV generation demonstrate the effectiveness of the proposed approach in achieving efficient and profitable EVCS energy procurement. It is observed that expected profit for beta = 0 is $11,308 while none of the bilateral contracts are selected in this case because the pool prices are expected to be cheaper. On the other hand, expected profit for beta = 100 is $9900 where some parts of the required energy are provided by the bilateral contracts in this case to avoid the risk of fluctuations in the real-time pool prices, but at the cost of lower expected profit.
引用
收藏
页数:11
相关论文
共 50 条
  • [21] A novel approach for two-stage Stochastic linear programming with recourse
    Sohn, Lan-Sulk
    Bricker, Dennis L.
    Lai, Ming-Che
    WMSCI 2006: 10TH WORLD MULTI-CONFERENCE ON SYSTEMICS, CYBERNETICS AND INFORMATICS, VOL VI, PROCEEDINGS, 2006, : 192 - +
  • [22] A Two-Stage Stochastic Integer Programming Approach to Integrated Staffing and Scheduling with Application to Nurse Management
    Kim, Kibaek
    Mehrotra, Sanjay
    OPERATIONS RESEARCH, 2015, 63 (06) : 1431 - 1451
  • [23] Two-stage stochastic programming model to locate capacitated EV-charging stations in urban areas under demand uncertainty
    MirHassani, S. A.
    Khaleghi, A.
    Hooshmand, F.
    EURO JOURNAL ON TRANSPORTATION AND LOGISTICS, 2020, 9 (04)
  • [24] Energy optimization dispatch based on two-stage and multi-objective comparative analysis for PV and BESS integrated fast charging stations with V2G
    Zhan, Shuhe
    Zhou, Yun
    Feng, Donghan
    Wang, Haojing
    Fang, Chen
    IET RENEWABLE POWER GENERATION, 2024, 18 : 4426 - 4438
  • [25] Optimized Operational Cost Reduction for an EV Charging Station Integrated With Battery Energy Storage and PV Generation
    Yan, Qin
    Zhang, Bei
    Kezunovic, Mladen
    IEEE TRANSACTIONS ON SMART GRID, 2019, 10 (02) : 2096 - 2106
  • [26] Stochastic Optimization Strategy for Daily Operation of Electric Bus Charging Station With PV and Energy Storage
    Li R.
    Hu Z.
    Dianwang Jishu/Power System Technology, 2017, 41 (12): : 3772 - 3779
  • [27] Two-stage stochastic energy procurement model for a large consumer in hydrothermal systems
    Barrionuevo Silva, Rodolfo Rodrigues
    Pio Martins, Andre Christovao
    Soler, Edilaine Martins
    Baptista, Edmea Cassia
    Balbo, Antonio Roberto
    Nepomuceno, Leonardo
    ENERGY ECONOMICS, 2022, 107
  • [28] Aggregator pricing methodology based on two-stage charging station allocation for electric vehicles
    Lin H.
    Zhou Y.
    Li Y.
    Zheng H.
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2023, 51 (21): : 44 - 56
  • [29] Efficient ANFIS-Driven Power Extraction and Control Strategies for PV-BESS Integrated Electric Vehicle Charging Station
    Barker, Teja
    Ghosh, Arnab
    Sain, Chiranjit
    Ahmad, Furkan
    Al-Fagih, Luluwah
    RENEWABLE ENERGY FOCUS, 2024, 48
  • [30] A novel two stage approach for electric taxis charging station site selection
    Kaya, Omer
    Alemdar, Kadir D.
    Codur, Muhammed Y.
    SUSTAINABLE CITIES AND SOCIETY, 2020, 62