Integrating BIM and VR for Highway Construction Site Layout Planning

被引:0
作者
Xu, Sheng [1 ,2 ]
Fu, Denglin [3 ]
Xie, Yuanfang [3 ]
Hou, Lei [4 ]
Bu, Shanshan [5 ]
机构
[1] Changan Univ, Sch Econ & Management, Xian 710064, Shaanxi, Peoples R China
[2] Overseas Expertise Intro Ctr Discipline Innovat D, Xian 710064, Shaanxi, Peoples R China
[3] Changan Univ, Sch Civil Engn, Xian 710061, Shaanxi, Peoples R China
[4] RMIT, Sch Engn, Melbourne, Vic 3001, Australia
[5] Changan Univ, Sch Highways, Xian 710064, Shaanxi, Peoples R China
来源
CICTP 2020: ADVANCED TRANSPORTATION TECHNOLOGIES AND DEVELOPMENT-ENHANCING CONNECTIONS | 2020年
关键词
VIRTUAL-REALITY; OPTIMIZATION; FRAMEWORK; DESIGN;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Traditionally the layout plan of temporary facilities for road construction sites was mainly based on expert experience. However, the complicated terrain conditions made it difficult for project managers to comprehensively understand the geographical features of the site. The site layout plan often did not apply to the actual construction process, resulting in loss of time and cost. To provide an intuitive, immersive virtual environment to support experts' experience in the site layout design, this research proposed a framework of a decision-support platform that combined building information modeling (BIM) and virtual reality (VR) technology. This paper described the architecture and modules of the platform, as well as the application process, functions and implementation process. The proposed platform enables project managers to interactively place temporary facilities in the integrated model of highways and surroundings in the virtual environment; generate and compare alternative site layout schemes with automatic calculation according to preset criteria.
引用
收藏
页码:1068 / 1079
页数:12
相关论文
共 21 条
[11]   Integrated Application of BIM and GIS: An Overview [J].
Ma, Zhiliang ;
Ren, Yuan .
CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 :1072-1079
[12]   Using structure-from-motion to create glacier DEMs and orthoimagery from historical terrestrial and oblique aerial imagery [J].
Mertes, Jordan R. ;
Gulley, Jason D. ;
Benn, Douglas I. ;
Thompson, Sarah S. ;
Nicholson, Lindsey I. .
EARTH SURFACE PROCESSES AND LANDFORMS, 2017, 42 (14) :2350-2364
[13]   Signage visibility analysis and optimization system using BIM-enabled virtual reality (VR) environments [J].
Motamedi, Ali ;
Wang, Zhe ;
Yabuki, Nobuyoshi ;
Fukuda, Tomohiro ;
Michikawa, Takashi .
ADVANCED ENGINEERING INFORMATICS, 2017, 32 :248-262
[14]   A tri-objective ant colony optimization based model for planning safe construction site layout [J].
Ning, Xin ;
Qi, Jingyan ;
Wu, Chunlin ;
Wang, Wenjuan .
AUTOMATION IN CONSTRUCTION, 2018, 89 :1-12
[15]   Cost-safety trade-off in unequal-area construction site layout planning [J].
Ning, Xin ;
Lam, Ka Chi .
AUTOMATION IN CONSTRUCTION, 2013, 32 :96-103
[16]   A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template [J].
Park, Chan-Sik ;
Lee, Do-Yeop ;
Kwon, Oh-Seong ;
Wang, Xiangyu .
AUTOMATION IN CONSTRUCTION, 2013, 33 :61-71
[17]  
[芮海田 Rui Haitian], 2012, [长安大学学报. 自然科学版, Journal of Chang'An University. Natural Science Edition], V32, P83
[18]   Optimizing the planning of construction site security for critical infrastructure projects [J].
Said, Hisham ;
El-Rayes, Khaled .
AUTOMATION IN CONSTRUCTION, 2010, 19 (02) :221-234
[19]   Reliability analysis and reliability-based design optimization of roadway horizontal curves using a first-order reliability method [J].
Shin, Jaekwan ;
Lee, Ikjin .
ENGINEERING OPTIMIZATION, 2015, 47 (05) :622-641
[20]   VR-embedded BIM immersive system for QS engineering education [J].
Wang, Chen ;
Li, Heng ;
Kho, Song Y. .
COMPUTER APPLICATIONS IN ENGINEERING EDUCATION, 2018, 26 (03) :626-641