Game analysis on PPP model operation of abandoned mines ecological restoration under the innovation of central government's reward and punishment system in China

被引:2
作者
Feng, Dongmei [1 ]
Wang, Liang [1 ]
Duan, Xiumei [2 ,3 ]
机构
[1] Liaoning Tech Univ, Sch Business Adm, Huludao, Peoples R China
[2] Yingkou Inst Technol, Coll Chem & Environm Engn, Yingkou, Peoples R China
[3] YingKou Inst Technol, Ctr Instrument Anal, Yingkou, Peoples R China
关键词
EVOLUTIONARY GAME;
D O I
10.1371/journal.pone.0304368
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
There is a huge funding gap in the abandoned mines ecological restoration in China. It is of great research value to explore how PPP model can better introduce social capital into the low-profit ecological restoration of abandoned mines. Based on the innovation perspective of the central government's reward and punishment system, this paper constructs an evolutionary game model of "local government-social capital", analyzes the interaction and behavior mechanism of core stakeholders in the operation process of abandoned mines ecological restoration PPP mode, and discusses the influence of evolutionary equilibrium strategy and parameters change on evolutionary strategy under different scenarios by Matlab simulation. The research shows that the abandoned mines ecological restoration needs the support of the central government. When the local government lightly punishes the low-quality service of social capital, the central government needs to pay higher costs to promote all parties to actively participate in the operation and supervision of the PPP project. The revenue and cost of government supervision, the operating subsidy for social capital and the cost saved by social capital in providing bad service are the key factors affecting the evolution of the game between government and social capital. Punishment can effectively spur social capital to keep the contract and operate in the project, but the punishment effect will be ineffective without government supervision. Finally, some suggestions are put forward, such as establishing a long-term supervision mechanism and a reasonable income mechanism for PPP projects, increasing penalties for violations, attracting third parties to reduce supervision costs and strengthening communication between the two parties, so as to make the project take into account the economic performance of social capital and the social welfare of government departments, and achieve dual Pareto improvement.
引用
收藏
页数:21
相关论文
共 37 条
[1]  
Arndt R.H., 1998, Journal of Project Finance, V4, P11, DOI DOI 10.3905/JSF.4.3.24
[2]  
[程帆 Cheng Fan], 2022, [运筹与管理, Operations Research and Management Science], V31, P227
[3]   Reassessing risk in developing country infrastructure [J].
Doh, JP ;
Ramamurti, R .
LONG RANGE PLANNING, 2003, 36 (04) :337-353
[4]   Optimizing the formulation of coal gangue planting substrate using wastes: The sustainability of coal mine ecological restoration [J].
Du, Tao ;
Wang, Dongmei ;
Bai, Yujie ;
Zhang, Zezhou .
ECOLOGICAL ENGINEERING, 2020, 143
[5]   EVOLUTIONARY GAMES IN ECONOMICS [J].
FRIEDMAN, D .
ECONOMETRICA, 1991, 59 (03) :637-666
[6]  
Grimsey D., 2002, International Journal of Project Management, V20, P107, DOI DOI 10.1016/S0263-7863(00)00040-5
[7]  
Hu Li., 2011, J IND ENG ENG MANAGE, V25, P149, DOI DOI 10.3969/J.ISSN.1004-6062.2011.02.022.18
[8]  
Hu ZhenQi Hu ZhenQi, 2012, Journal of Resources and Ecology, V3, P289, DOI 10.5814/j.issn.1674-764x.2012.04.001
[9]  
Jiang C, 2016, Journal of Beijing Jiaotong University (Social Sciences Edition), V15, P50
[10]   Fractional-order evolutionary game of green and low-carbon innovation in manufacturing enterprises [J].
Jiang, Nan ;
Feng, Yuqiang ;
Wang, Xianjia .
ALEXANDRIA ENGINEERING JOURNAL, 2022, 61 (12) :12673-12687