Facing barriers to unlock large-scale agile benefits: exploring the mediating role of organizational readiness

被引:0
作者
Santos, Paula de Oliveira [1 ]
Alves, Josivan Leite [1 ]
de Carvalho, Marly Monteiro [1 ]
机构
[1] Univ Sao Paulo, Prod Engn Dept, Escola Politecn, Sao Paulo, Brazil
关键词
Agile project management; Agile at scale; Large-scale agile; Scaled agile; Survey-based research; Partial least square structural equation modelling; SOFTWARE-DEVELOPMENT; SUCCESS FACTORS; MANAGEMENT; CHALLENGES; PROJECTS; FRAMEWORK; SERVICE; SCRUM; POWER; WORK;
D O I
10.1108/IJMPB-02-2024-0044
中图分类号
F [经济];
学科分类号
02 ;
摘要
PurposeThis aims to explore the relationship between the agile methods barriers in large-scale contexts and the benefits for business, team and product and process, exploring the organizational readiness (OR) mediating role.Design/methodology/approachWe propose a theoretical model through survey-based research, applying partial least square structural equation modelling.FindingsWe confirmed that OR mediating effect on the relationship between agile methods barriers and team benefits. We operationalized OR in a broader context that embeds the strategic alignment of large-scale agile implementation, considering variables such as organizational structure and culture.Research limitations/implicationsThe data are cross-sectional rather than longitudinal, which limits temporal interpretations of the associations between agile methods and organizational issues.Practical implicationsThe findings offer a way forward for organizations already using or planning to implement agile management to understand the pathway towards achieving the expected benefits. Our study also unveils the importance of looking at OR when implementing such a complex change in management from traditional to large-scale contexts.Originality/valueOur results show the significant and positive influence of agile method on all three benefit variables (team, business, product and processes). Furthermore, we identified the significant and positive mediating role of OR on the relationship between agile method and team benefits.
引用
收藏
页码:26 / 52
页数:27
相关论文
共 93 条
[1]   De-motivators for the adoption of agile methodologies for large-scale software development teams: An SLR from management perspective [J].
Abrar, Muhammad Faisal ;
Sohail, M. ;
Ali, Sikandar ;
Majeed, Muhammad Faran ;
Shah, Ibrar Ali ;
Rashid, Nasir ;
Ullah, Naimat .
JOURNAL OF SOFTWARE-EVOLUTION AND PROCESS, 2020, 32 (12)
[2]   Implementing Agility in Large Software Development Projects [J].
Abu Lebdeh, Lina ;
Qasim, Amer ;
Kharbat, Faten .
TEM JOURNAL-TECHNOLOGY EDUCATION MANAGEMENT INFORMATICS, 2020, 9 (03) :1285-1294
[3]  
Alqudah M., 2016, International Journal on Advanced Science, Engineering and Information Technology, V6, P828, DOI DOI 10.18517/IJASEIT.6.6.1374
[4]   Quality requirements challenges in the context of large-scale distributed agile: An empirical study [J].
Alsaqaf, Wasim ;
Daneva, Maya ;
Wieringa, Roel .
INFORMATION AND SOFTWARE TECHNOLOGY, 2019, 110 :39-55
[5]   Bridging Knowledge Management and Capabilities in Innovative Projects: An Integrative Framework [J].
Alves, Josivan Leite ;
de Carvalho, Marly Monteiro .
PROJECT MANAGEMENT JOURNAL, 2023,
[6]   THE MODERATOR MEDIATOR VARIABLE DISTINCTION IN SOCIAL PSYCHOLOGICAL-RESEARCH - CONCEPTUAL, STRATEGIC, AND STATISTICAL CONSIDERATIONS [J].
BARON, RM ;
KENNY, DA .
JOURNAL OF PERSONALITY AND SOCIAL PSYCHOLOGY, 1986, 51 (06) :1173-1182
[7]   Advancing family business research through modeling nonlinear relationships: Comparing PLS-SEM and multiple regression [J].
Basco, Rodrigo ;
Hair, Joseph F., Jr. ;
Ringle, Christian M. ;
Sarstedt, Marko .
JOURNAL OF FAMILY BUSINESS STRATEGY, 2022, 13 (03)
[8]   Agile on a Large Scale [J].
Bass J.M. .
ITNOW, 2019, 61 (01) :56-57
[9]  
Batra D, 2010, COMMUN ASSOC INF SYS, V27, P379
[10]   The utility of rapid application development in large-scale, complex projects [J].
Berger, Hilary ;
Beynon-Davies, Paul .
INFORMATION SYSTEMS JOURNAL, 2009, 19 (06) :549-570