Shipment lead time hedging and coordination in prefabricated construction supply chain

被引:0
|
作者
Wang, Zhenyi [1 ]
Wang, Haizi [2 ]
Zhang, Shibin [2 ]
Qiu, Shuai [3 ]
机构
[1] Northwestern Polytech Univ, Sch Management, Xian, Peoples R China
[2] Shandong Jianzhu Univ, Sch Management Engn, Jinan, Peoples R China
[3] China Construct Eighth Engn Div, Shanghai, Peoples R China
关键词
Prefabricated construction; supply chain management; shipment lead time hedging; delivery performance; supply chain coordination; SUSTAINABLE PERFORMANCE; MANAGEMENT; INVESTMENT; COSTS;
D O I
10.1051/ro/2024041
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper aims to coordinate a shipment lead time hedging (SLTH) problem between a building contractor and a logistics provider in the prefabricated construction supply chain (PCSC). In the PCSC, untimely (early or late) delivery of prefabs can lead to project time and cost overruns. To mitigate this challenge, the building contractor requires the logistics provider to reduce the shipping time variability, which is termed the SLTH strategy. While this benefits the building contractor, it also puts more investment and operational pressures on the logistics provider. To solve this conflict, we introduce a coordination mechanism which involves two terms: an SLTH level related cost term is charged by the logistics provider to the building contractor, and a constant transfer term is adopted to fairly allocate the system surplus. Three decentralized models are investigated: i.e., two Stackelberg game models with alternative decision-making sequences and an equal power model. Further comparative analysis and numerical studies reveal that our proposed coordination mechanism increases the SLTH level and ensures a win-win situation. Moreover, some interesting managerial implications are derived.
引用
收藏
页码:2143 / 2166
页数:24
相关论文
共 50 条
  • [1] Production lead-time hedging and coordination in prefabricated construction supply chain management
    Zhai, Yue
    Zhong, Ray Y.
    Li, Zhi
    Huang, George
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (14) : 3984 - 4002
  • [2] Buffer space hedging and coordination in prefabricated construction supply chain management
    Zhai, Yue
    Zhong, Ray Y.
    Huang, George Q.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2018, 200 : 192 - 206
  • [3] Multi-period hedging and coordination in a prefabricated construction supply chain
    Zhai, Yue
    Fu, Yelin
    Xu, Gangyan
    Huang, George
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (07) : 1949 - 1971
  • [4] Buffer space hedging enabled production time variation coordination in prefabricated construction
    Zhai, Yue
    Xu, Gangyan
    Huang, George Q.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 137
  • [5] BUFFERING POLICIES FOR PREFABRICATED CONSTRUCTION SUPPLY CHAIN SUBJECT TO MATERIAL LEAD TIME AND ACTIVITY DURATION UNCERTAINTIES
    Lu, Hui
    Liu, Dian
    Li, Jue
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2024, 30 (02) : 99 - 113
  • [6] Lead-time quotation and hedging coordination in make-to-order supply chain
    Zhai, Yue
    Cheng, T. C. E.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 300 (02) : 449 - 460
  • [8] Side-payment contracts for prefabricated construction supply chain coordination under just-in-time purchasing
    Zeng, Lingyuan
    Du, Qiang
    Zhou, Li
    Wang, Xiaoyan
    Zhu, Hongyu
    Bai, Libiao
    JOURNAL OF CLEANER PRODUCTION, 2022, 379
  • [9] Production lead-time hedging and order allocation in an MTO supply chain
    Zhai, Yue
    Hua, Guowei
    Cheng, Meng
    Cheng, T. C. E.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 311 (03) : 887 - 905
  • [10] Coordination of Prefabricated Construction Supply Chain under Cap-and-Trade Policy Considering Consumer Environmental Awareness
    Jiang, Wen
    Yuan, Meng
    SUSTAINABILITY, 2022, 14 (09)