DETERMINATION OF THE DURATION OF INSTALLATION USING A DIGITAL MODEL OF THE TECHNOLOGICAL CYCLE OF A TOWER CRANE

被引:0
作者
Kabanov, V. N. [1 ]
机构
[1] Moscow State Univ Civil Engn, Natl Res Univ, Dept Technol & Org Construct Prod, Moscow, Russia
来源
RUSSIAN JOURNAL OF BUILDING CONSTRUCTION AND ARCHITECTURE | 2024年 / 03期
关键词
installation of building structures; tower crane; technological cycle; duration; working organizational and technological documentation;
D O I
10.36622/2542-0526.2024.63.3.005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Satement of the problem. The initial information for the development of working organizational and technological documentation is the quantitative values established by the project (for example, the duration and load capacity of a tower crane). Recommendations on the choice of the leading machine of the technological process of installation of precast concrete structures (adj. B STO NOSTROY 2.7.211-2016) do not provide for an assessment of the change in the duration of the technological cycle depending on the height of the installation horizon. Such an omission inevitably leads to an increase in the duration of construction and installation work. In this paper, it is assumed that the construction of a digital model of the technological cycle of a tower crane for the installation of each reinforced concrete structure will provide a higher reliability of calculating the duration of work, and with the help of such a model, it is possible to determine the requirements for the lifting/lowering speed of a tower crane. Results. The requirements for the initial data that are necessary to build a digital model of the technological cycle of a tower crane during the installation of precast concrete are formed. An analytical dependence and its graphical interpretation are obtained to determine the duration of the technological cycle depending on the height of the installation horizon. The comparison of the duration value set by the calendar schedule and obtained as a result of summing the durations of each technological cycle of the tower crane is carried out. Conclusions. In the recommendations for choosing a tower crane for the installation of reinforced concrete structures, it is necessary to add characteristics that describe the high-speed mode of movement of the building structure. The influence of the speed modes of the tower crane on the duration set by the project should be assessed using a digital moth of the technological cycle of the tower crane. The assessment of compliance with the speed modes of the tower crane should be carried out based on a comparison of the estimated duration of the work set by the project and the sum of the durations of each technological cycle of the tower crane obtained as a result of the use of a digital model.
引用
收藏
页码:55 / 64
页数:10
相关论文
共 21 条
[1]   Integrating 3D visualization and simulation for tower crane operations on construction sites [J].
Al-Hussein, Mohamed ;
Niaz, Muhammad Athar ;
Yu, Haitao ;
Kim, Hyoungkwan .
AUTOMATION IN CONSTRUCTION, 2006, 15 (05) :554-562
[2]   Decision support system for tower crane location and material supply point in construction sites using an integer linear programming model [J].
Amiri, Roya ;
Sardroud, Javad Majrouhi ;
Kermani, Vahid Momenaei .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (04) :1444-1462
[3]  
Arefev E. M., 2020, Progressivnye tekhnologii i sistemy mashinostroeniya, P3
[4]   Reinforcement learning-based simulation and automation for tower crane 3D lift planning [J].
Cho, SungHwan ;
Han, SangUk .
AUTOMATION IN CONSTRUCTION, 2022, 144
[5]   Identifying tower crane activities with data: the case of the concrete pouring [J].
Danel, Thomas ;
Lafhaj, Zoubeir ;
Puppala, Anand ;
BuHamdan, Samer ;
Lienard, Sophie ;
Richard, Philippe .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (02) :939-956
[6]   Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations [J].
Dasovic, Borna ;
Galic, Mario ;
Klansek, Uros .
BUILDINGS, 2019, 9 (01)
[7]  
Fakhratov M. A., 2020, Perspektivy nauki, P62
[8]  
Golovchenko I. V., 2021, Stroitel'stvo i tekhnogennaya bezopasnost', P59
[9]   Vision-Based Productivity Monitoring of Tower Crane Operations during Curtain Wall Installation Using a Database-Free Approach [J].
Jeong, Insoo ;
Hwang, Jeongbin ;
Kim, Junghoon ;
Chi, Seokho ;
Hwang, Bon-Gang ;
Kim, Jinwoo .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2023, 37 (04)
[10]  
Lapidus A. A., 2019, Stroitel'noe proizvodstvo, P56, DOI [10.54950/265853402019156, DOI 10.54950/265853402019156]