Study on the Two-Step Construction Method of Super Large Cross-Section Tunnels Crossing Karst Cave Areas

被引:0
|
作者
Wan, Fei [1 ]
Liu, Gang [1 ]
Tang, Yifeng [2 ]
Zhang, Nian [3 ]
Xu, Dongliang [3 ]
Yan, Xuehui [3 ]
Li, Shuai [3 ]
机构
[1] Res Inst Highway Minist Transport, Beijing 100088, Peoples R China
[2] Rioh Traff Safety Co Ltd, Beijing 100088, Peoples R China
[3] Taiyuan Univ Technol, Coll Civil Engn, Taiyuan 030024, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2024年 / 14卷 / 11期
关键词
tunnel engineering; two-step method; numerical calculation; super large cross-section; karst cave area; weakly broken surrounding rock;
D O I
10.3390/app14114500
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
To explore the solution of the two-step method applied in the rapid construction of super large cross-section tunnels passing through IV-and V-grade surrounding rock sections in karst cave areas, based on an engineering example of the Lianhuashan Tunnel, we use the numerical calculation method to analyze the stability of surrounding rock and the design parameters of the control measures for super large cross-section tunnels during the construction of the step method. The calculated results show that the working face of IV-grade surrounding rock can be stabilized by an advanced small pipe, and the stability of the supporting structure should be controlled mainly by IV-grade surrounding rock. In order to control the stability of the tunnel face, it is necessary to use an advanced large pipe shed in the surrounding V-grade rock. The reinforcement range of the advanced large pipe shed is 120 degrees and the length is 20 m. This is the most economical design parameter of the advanced large pipe shed, ensuring the deformation control effect. For control of the stability of the supporting structure, under the condition that the working space is suitable for large machinery, the settlement of the arch of the supporting structure can be obviously reduced by shortening the step cycle footage and reducing the step length, and the peripheral convergence of the supporting structure can be obviously reduced by reducing the step height. After comprehensive analysis and considering the development of karst caves, the advanced support measures, design parameters, bench excavation design parameters, initial support measures, karst cave treatment measures, and bench construction process of IV- and V-grade surrounding rock is determined. The application verification shows that the research results have a good control effect on the stability of the surrounding rock and cave and are suitable for large-scale mechanical operations, which can significantly improve the excavation speed of the super large cross-section tunnel passing through the IV- and V-grade surrounding rock sections in the karst cave area.
引用
收藏
页数:18
相关论文
共 50 条
  • [21] The Construction and Application of a Deep Learning-Based Primary Support Deformation Prediction Model for Large Cross-Section Tunnels
    Zhang, Junling
    Mei, Min
    Wang, Jun
    Shang, Guangpeng
    Hu, Xuefeng
    Yan, Jing
    Fang, Qian
    Plebankiewicz, Edyta
    APPLIED SCIENCES-BASEL, 2024, 14 (02):
  • [22] Study on the Effect of Large Cross-Section Quasi-Rectangular Pipe Jacking near Side Crossing Viaduct Piles in Soft Soil Areas
    Yan, Yichen
    Zhang, Mengxi
    Cao, Mengjia
    APPLIED SCIENCES-BASEL, 2023, 13 (17):
  • [23] Research on the Stability of Shallow-Buried Large Cross-Section Tunnel by Construction Method Conversion
    Zhang, Zhiyong
    Zhao, Chenyang
    Peng, Long
    Zhang, Xiaohui
    Lei, Mingfeng
    FRONTIERS IN EARTH SCIENCE, 2022, 10
  • [24] Application study of the Calculation Method for Loads of Multi-arch and Extra Large Cross Section Tunnels in Double-side Drifts Construction Method
    Xu, Chongbang
    Zhao, Xu
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 1488 - 1491
  • [25] Research on construction behaviors of support system in four-lane ultra large-span tunnel with super-large cross-section
    Zhou, Dingheng
    Cao, Liqiao
    Ma, Yongfeng
    Fang, Shitao
    Wang, Kun
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2010, 29 (01): : 140 - 148
  • [26] Performance of large cross-section tunnel constructed in loose ground by optimal multi-step excavation method
    Li, Songtao
    Tan, Zhongsheng
    Wu, Jinke
    Du, Wentao
    ARABIAN JOURNAL OF GEOSCIENCES, 2020, 13 (18)
  • [27] Study on construction mechanic characteristics and construction optimization of super-large cross-section tunnel portal under shallow buried depth and asymmetrical loading: A case study in Southwest China
    Chen, Hao
    Zheng, Haozan
    Liu, Bolong
    Huang, Man
    Liu, Jiawei
    PLOS ONE, 2025, 20 (01):
  • [28] Performance of large cross-section tunnel constructed in loose ground by optimal multi-step excavation method
    Songtao Li
    Zhongsheng Tan
    Jinke Wu
    Wentao Du
    Arabian Journal of Geosciences, 2020, 13
  • [29] Study on Construction Mechanical Effect and Optimization of Large-Span Variable Cross-Section of Railway Tunnel
    Song, Sensen
    Li, Shuguang
    Liang, Yanling
    Huo, Runke
    Song, Zhanping
    Miao, Zizhen
    Song, Ziyi
    BUILDINGS, 2023, 13 (11)
  • [30] The Study on a New Loads Calculation Method of Multi-arch and Extra Large Cross Section Tunnels
    Xu, Chongbang
    Xia, Caichu
    Wang, Hualao
    ADVANCES IN STRUCTURAL ENGINEERING, PTS 1-3, 2011, 94-96 : 1159 - +