Study on the Two-Step Construction Method of Super Large Cross-Section Tunnels Crossing Karst Cave Areas

被引:0
|
作者
Wan, Fei [1 ]
Liu, Gang [1 ]
Tang, Yifeng [2 ]
Zhang, Nian [3 ]
Xu, Dongliang [3 ]
Yan, Xuehui [3 ]
Li, Shuai [3 ]
机构
[1] Res Inst Highway Minist Transport, Beijing 100088, Peoples R China
[2] Rioh Traff Safety Co Ltd, Beijing 100088, Peoples R China
[3] Taiyuan Univ Technol, Coll Civil Engn, Taiyuan 030024, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2024年 / 14卷 / 11期
关键词
tunnel engineering; two-step method; numerical calculation; super large cross-section; karst cave area; weakly broken surrounding rock;
D O I
10.3390/app14114500
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
To explore the solution of the two-step method applied in the rapid construction of super large cross-section tunnels passing through IV-and V-grade surrounding rock sections in karst cave areas, based on an engineering example of the Lianhuashan Tunnel, we use the numerical calculation method to analyze the stability of surrounding rock and the design parameters of the control measures for super large cross-section tunnels during the construction of the step method. The calculated results show that the working face of IV-grade surrounding rock can be stabilized by an advanced small pipe, and the stability of the supporting structure should be controlled mainly by IV-grade surrounding rock. In order to control the stability of the tunnel face, it is necessary to use an advanced large pipe shed in the surrounding V-grade rock. The reinforcement range of the advanced large pipe shed is 120 degrees and the length is 20 m. This is the most economical design parameter of the advanced large pipe shed, ensuring the deformation control effect. For control of the stability of the supporting structure, under the condition that the working space is suitable for large machinery, the settlement of the arch of the supporting structure can be obviously reduced by shortening the step cycle footage and reducing the step length, and the peripheral convergence of the supporting structure can be obviously reduced by reducing the step height. After comprehensive analysis and considering the development of karst caves, the advanced support measures, design parameters, bench excavation design parameters, initial support measures, karst cave treatment measures, and bench construction process of IV- and V-grade surrounding rock is determined. The application verification shows that the research results have a good control effect on the stability of the surrounding rock and cave and are suitable for large-scale mechanical operations, which can significantly improve the excavation speed of the super large cross-section tunnel passing through the IV- and V-grade surrounding rock sections in the karst cave area.
引用
收藏
页数:18
相关论文
共 50 条
  • [11] Analysis of construction parameter optimization for new large cross-section tunnel next to existing tunnels
    Yang Yong-bo
    Liu Ming-gui
    Zhang Guo-hua
    Li Qi
    ROCK AND SOIL MECHANICS, 2010, 31 (04) : 1217 - 1226
  • [12] Construction mechanics of tunnel with super-large cross-section and its dynamic stability
    Shi, You-Zhi
    Li, Jian-Feng
    Li, Wang-Jing
    Zhou, Xian-Qi
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2015, 49 (07): : 1023 - 1029
  • [13] Investigation on the shear performance of circumferential joints of segments in super-large cross-section shield tunnels
    Guo, Wenqi
    Feng, Kun
    Zhou, Yili
    Cao, Xiangpeng
    Zhao, Lixiang
    STRUCTURAL CONCRETE, 2023, 24 (04) : 4978 - 4992
  • [14] Mechanical responses in the construction process of super-large cross-section tunnel: A case study of Gongbei tunnel
    Zhou, Zhenliang
    Zhao, Jinpeng
    Tan, Zhongsheng
    Zhou, Xianping
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 115
  • [15] Study on the Method of Construction of Large Section Tunnel Crossing the Ancient Great Wall
    Jin, Aibing
    Li, Longfu
    Deng, Fugen
    Zhang, Minzhe
    VIBRATION, STRUCTURAL ENGINEERING AND MEASUREMENT II, PTS 1-3, 2012, 226-228 : 1504 - 1508
  • [16] Investigation on internal force transmission and failure characteristics of segmental linings for super-large cross-section shield tunnels
    Mu, Haixing
    Feng, Kun
    Yang, Shaoyi
    Li, Jiaqi
    Tang, Ruoyang
    Guo, Wenqi
    Zhou, Yili
    He, Chuan
    STRUCTURES, 2025, 74
  • [17] Technologies for large cross-section subsea tunnel construction using drilling and blasting method
    Sun, Zhenyu
    Zhang, Dingli
    Fang, Qian
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 141
  • [18] ANALYSIS ON CONSTRUCTION DEFORMATION AND SUPPORTING STRUCTURE OF TWO-STEP AND THREE-SECTION EXCAVATION METHOD FOR SUPER LARGER SPAN HIGHWAY TUNNEL
    Hou, Fujin
    Luo, Yanbin
    Jiang, Qing
    Chen, Jianxun
    Li, Tao
    Dong, Fangfang
    CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2020, 29 (01): : 110 - 123
  • [19] Analysis on construction deformation and supporting structure of two-step and three-section excavation method for super larger span highway tunnel
    Hou, Fujin
    Luo, Yanbin
    Jiang, Qing
    Chen, Jianxun
    Li, Tao
    Dong, Fangfang
    Civil Engineering Journal, 2020, 29 (01): : 110 - 123
  • [20] Study on a Surrounding Rock Pressure Calculation Method for Super-Large Section Highway Tunnels
    Gao, Hongjie
    He, Ping
    Chen, Zheng
    Li, Xinyu
    SYMMETRY-BASEL, 2019, 11 (09):