Study on the Two-Step Construction Method of Super Large Cross-Section Tunnels Crossing Karst Cave Areas

被引:0
|
作者
Wan, Fei [1 ]
Liu, Gang [1 ]
Tang, Yifeng [2 ]
Zhang, Nian [3 ]
Xu, Dongliang [3 ]
Yan, Xuehui [3 ]
Li, Shuai [3 ]
机构
[1] Res Inst Highway Minist Transport, Beijing 100088, Peoples R China
[2] Rioh Traff Safety Co Ltd, Beijing 100088, Peoples R China
[3] Taiyuan Univ Technol, Coll Civil Engn, Taiyuan 030024, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2024年 / 14卷 / 11期
关键词
tunnel engineering; two-step method; numerical calculation; super large cross-section; karst cave area; weakly broken surrounding rock;
D O I
10.3390/app14114500
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
To explore the solution of the two-step method applied in the rapid construction of super large cross-section tunnels passing through IV-and V-grade surrounding rock sections in karst cave areas, based on an engineering example of the Lianhuashan Tunnel, we use the numerical calculation method to analyze the stability of surrounding rock and the design parameters of the control measures for super large cross-section tunnels during the construction of the step method. The calculated results show that the working face of IV-grade surrounding rock can be stabilized by an advanced small pipe, and the stability of the supporting structure should be controlled mainly by IV-grade surrounding rock. In order to control the stability of the tunnel face, it is necessary to use an advanced large pipe shed in the surrounding V-grade rock. The reinforcement range of the advanced large pipe shed is 120 degrees and the length is 20 m. This is the most economical design parameter of the advanced large pipe shed, ensuring the deformation control effect. For control of the stability of the supporting structure, under the condition that the working space is suitable for large machinery, the settlement of the arch of the supporting structure can be obviously reduced by shortening the step cycle footage and reducing the step length, and the peripheral convergence of the supporting structure can be obviously reduced by reducing the step height. After comprehensive analysis and considering the development of karst caves, the advanced support measures, design parameters, bench excavation design parameters, initial support measures, karst cave treatment measures, and bench construction process of IV- and V-grade surrounding rock is determined. The application verification shows that the research results have a good control effect on the stability of the surrounding rock and cave and are suitable for large-scale mechanical operations, which can significantly improve the excavation speed of the super large cross-section tunnel passing through the IV- and V-grade surrounding rock sections in the karst cave area.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] Study on Construction Response Characteristics of Large Cross-Section Tunnel Crossing Huge Karst Cave Backfill
    Chen, Yunteng
    Cai, Yuancheng
    Zhang, Jianwei
    Li, Jie
    Huang, Xiaotong
    Lei, Hao
    Yuan, Peilong
    SHOCK AND VIBRATION, 2023, 2023
  • [2] Large rectangular cross-section tunnels by the MMST Method
    Egawa, S
    Saito, R
    Shinohara, M
    Mochiduki, O
    Masaka, T
    CHALLENGES FOR THE 21ST CENTURY, VOL. 2: COMMUNICATION TUNNELS/MISCELLANEOUS INCLUDING WATER TUNNELS/MECHANISED TUNNELLING, 1999, : 507 - 514
  • [3] Construction methods for loess tunnels with super-large cross-section based on displacement control of surrounding rock
    Cheng, X.-S. (cxs702@126.com), 1600, Chinese Society of Civil Engineering (35):
  • [4] Exploratory application of a novel centre cross diaphragm method for the construction of large cross-section tunnels in soft ground
    Zheng, Gang
    Li, Huiliang
    Zhang, Tianqi
    Sun, Jibin
    Wang, Ruikun
    Qiu, Huimin
    Diao, Yu
    CANADIAN GEOTECHNICAL JOURNAL, 2023, 60 (02) : 123 - 138
  • [5] Feasibility Study on Step Method Excavation of Tunnels with Large Cross Section and Small Interval
    Wang, Cheng
    Su, Zhongming
    2011 INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS AND NEURAL COMPUTING (FSNC 2011), VOL II, 2011, : 55 - 57
  • [6] Feasibility Study on Step Method Excavation of Tunnels with Large Cross Section and Small Interval
    Wang, Cheng
    Su, Zhongming
    2011 INTERNATIONAL CONFERENCE OF ENVIRONMENTAL SCIENCE AND ENGINEERING, VOL 12, PT A, 2012, 12 : 550 - 554
  • [7] Performance of the suspension method in large cross-section shallow-buried tunnels
    Guoqing Cai
    Xinxiang Zou
    Qiang Zhang
    Rui Yang
    Tianchi Wu
    Jiguang Li
    High-speedRailway, 2023, 1 (04) : 224 - 232
  • [8] Excavation Method Comparison and Optimization for a Super Large Cross-Section Tunnel
    Huang, Yingjing
    Fang, Tao
    Wang, Ning
    APPLIED SCIENCES-BASEL, 2024, 14 (15):
  • [9] Deep Learning for Multigroup Cross-Section Representation in Two-Step Core Calculations
    Martin, Nicolas
    Prince, Zachary
    Laboure, Vincent
    Tano-Retamales, Mauricio
    NUCLEAR SCIENCE AND ENGINEERING, 2023, 197 (07) : 1406 - 1435
  • [10] Study on Excavation Method of Tunnel with Super Cross-section and Super Large Section Area Underpass Extra-high building
    Zhang, Xuefu
    Liu, Jiaxiang
    ADVANCED BUILDING MATERIALS, PTS 1-4, 2011, 250-253 (1-4): : 2057 - +