Big Data Scheduling with Order Acceptance Consideration in Supply Chain

被引:0
作者
Wang, Lei [1 ]
Ren, Jianfeng [1 ]
机构
[1] Qufu Normal Univ, Sch Management, Rizhao, Shandong, Peoples R China
关键词
Scheduling; Big Data; Order Acceptance; Supply Chain; BATCH DELIVERY; JOBS;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The efficient job scheduling schemes can make full use of resources, and then achieve different goals, such as maximizing efficiency, minimizing cost and saving energy. In supply chain, there are a lot of members and enormous data. Therefore, a suitable scheduling scheme has become the most common and effective method to optimize the execution of big data in supply chain. A scheduling problem with production and delivery consideration, which is usually in supply chain has been considered. For the reason of highly time emergency and random coming orders in quick production and delivery system, the effective algorithms for order acceptance scheduling problem are required. This paper addressed the production and delivery problem which has one manufacturer and multiple customers. There is single machine for order production at the manufacturer. For the consideration of order acceptance or not, the manufacturer need to choose order set to be accepted for processing. The paper aims at finding a balance between orders profit, delivery cost and time-based cost to maximize the total revenue. We consider three main objective functions in scheduling theory, analyze the problem complexity. The complexity of two of the problems are weakly NP hard, and the other one is strongly NP hard. For three weakly NP hard problems, we give pseudo-polynomial time optimal algorithms.
引用
收藏
页码:1808 / 1812
页数:5
相关论文
共 15 条
[1]   An integrated production and transportation scheduling problem with order acceptance and resource allocation decisions [J].
Aminzadegan, Sajede ;
Tamannaei, Mohammad ;
Fazeli, Majid .
APPLIED SOFT COMPUTING, 2021, 112
[2]   Maximizing the profit in customer's order acceptance and scheduling problem with weighted tardiness penalty [J].
Geramipour, Somaye ;
Moslehi, Ghasem ;
Reisi-Nafchi, Mohammad .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2017, 68 (01) :89-101
[3]   The production-distribution problem with order acceptance and package delivery: models and algorithm [J].
Khalili, Majid ;
Esmailpour, M. ;
Naderi, B. .
MANUFACTURING REVIEW, 2016, 3
[4]   Green manufacturing: Order acceptance and scheduling subject to the budgets of energy consumption and machine launch [J].
Kong, Min ;
Pei, Jun ;
Liu, Xinbao ;
Lai, Pei-Chun ;
Pardalos, Panos M. .
JOURNAL OF CLEANER PRODUCTION, 2020, 248
[5]   Order acceptance and scheduling with delivery under generalized parameters [J].
Lu, Lingfa ;
Ou, Jinwen ;
Yu, Xue ;
Zhang, Liqi .
NAVAL RESEARCH LOGISTICS, 2023, 70 (08) :844-857
[6]   Exact algorithms for a generalization of the order acceptance and scheduling problem in a single-machine environment [J].
Nobibon, Fabrice Talla ;
Leus, Roel .
COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) :367-378
[7]   Evolutionary computation algorithms to coordinating order acceptance and batch delivery for an integrated supply chain scheduling [J].
Noroozi, Amir ;
Mazdeh, Mohammad Mahdavi ;
Noghondarian, Kazem ;
Rasti-Barzoki, Morteza ;
Heydari, Mehdi .
COMPUTATIONAL & APPLIED MATHEMATICS, 2018, 37 (02) :1629-1679
[8]   Coordinating order acceptance and integrated production-distribution scheduling with batch delivery considering Third Party Logistics distribution [J].
Noroozi, Amir ;
Mazdeh, Mohammad Mandavi ;
Heydari, Mehdi ;
Rasti-Barzoki, Morteza .
JOURNAL OF MANUFACTURING SYSTEMS, 2018, 46 :29-45
[9]   Bicriteria order acceptance and scheduling with consideration of fill rate [J].
Ou, Jinwen ;
Zhong, Xueling .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 262 (03) :904-907
[10]   Integrated order acceptance and supply chain scheduling problem with supplier selection and due date assignment [J].
Sarvestani, Hossein Khorrami ;
Zadeh, Alborz ;
Seyfi, Majid ;
Rasti-Barzoki, Morteza .
APPLIED SOFT COMPUTING, 2019, 75 :72-83