Two parallel-machine scheduling with maximum waiting time for an emergency job

被引:0
作者
Jiang, Yiwei [1 ]
Yuan, Haodong [1 ]
Zhou, Ping [2 ]
Cheng, T. C. E. [3 ]
Ji, Min [1 ]
机构
[1] Zhejiang Gongshang Univ, Contemporary Business & Trade Res Ctr, Sch Management & E Business, Hangzhou 310018, Peoples R China
[2] Zhejiang Business Coll, Coll Humanities, Hangzhou, Peoples R China
[3] Hong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R China
基金
中国国家自然科学基金;
关键词
Parallel machines; emergency job; makespan; approximation algorithm; SINGLE-MACHINE; FLOW-SHOP; IDLE TIME; EARLINESS; TARDINESS; MINIMIZE; INSERTION; ROBUST; SUM;
D O I
10.1080/00207543.2023.2296024
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In modern manufacturing and service industries, urgent orders and service tasks are common, and the speed of handling such urgent tasks is an important indicator of production and service efficiency. In this study, we consider scheduling jobs on two parallel machines with the random arrival of an emergency job. The objective is to minimise the makespan, subject to a given maximum waiting time of the emergency job. We first show that the worst-case ratio of the existing algorithm LPTl-SPTm-l is at least 3/2 when m = 2. We then analyse some properties of the optimal schedule and derive lower bounds on the optimal makespan. Finally, we present an improved approximation algorithm with a tight worst-case ratio of 4/3. We also provide numerical results showing that our proposed algorithm outperforms algorithm LPTl-SPTm-l.
引用
收藏
页码:6016 / 6027
页数:12
相关论文
共 170 条
[1]   Verification of lean construction benefits through simulation modeling: A case study of bricklaying process [J].
Abbasian-Hosseini, S. Alireza ;
Nikakhtar, Amin ;
Ghoddousi, Parviz .
KSCE JOURNAL OF CIVIL ENGINEERING, 2014, 18 (05) :1248-1260
[2]   Modeling the metrics of lean, agile and leagile supply chain: An ANP-based approach [J].
Agarwal, Ashish ;
Shankar, Ravi ;
Tiwari, M. K. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 173 (01) :211-225
[3]   Integrating lean thinking and mathematical optimization: A case study in appointment scheduling of hematological treatments [J].
Agnetis, Alessandro ;
Bianciardi, Caterina ;
Iasparra, Nicola .
OPERATIONS RESEARCH PERSPECTIVES, 2019, 6
[4]   Enterprise modelling in support of the application of lean manufacturing in SMEs [J].
Ajaefobi, J. O. ;
Weston, R. H. .
ADVANCES IN MATERIALS AND SYSTEMS TECHNOLOGIES, 2007, 18-19 :359-+
[5]   A fuzzy interpretive structural modeling approach for evaluating the factors affecting lean implementation in Indian healthcare industry [J].
Ajmera, Puneeta ;
Jain, Vineet .
INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2019, 11 (02) :376-397
[6]  
Aldana de Vega L. A., 2011, Quality Management
[7]  
AlKaabi M, 2019, IN C IND ENG ENG MAN, P1578, DOI [10.1109/ieem44572.2019.8978929, 10.1109/IEEM44572.2019.8978929]
[8]  
Allnoch A., 1998, Industrial Management, V40, P4
[9]  
[Anonymous], 2017, MACHINE CHANGED WORL
[10]  
[Anonymous], 2020, APPL TECHNOLOGIES IC, DOI DOI 10.1007/978-3-030-42531-935