Determinants for megaproject knowledge innovation management: a Bayesian network analysis

被引:1
作者
Xie, Lin-lin [1 ]
Luo, Yifei [1 ]
Hou, Lei [2 ]
Yu, Jianqiang [3 ]
机构
[1] South China Univ Technol, Sch Civil Engn & Transportat, Guangzhou, Peoples R China
[2] RMIT Univ, Sch Engn, Melbourne, Australia
[3] PowerChina Huadong Engn Corp Ltd, Hangzhou, Peoples R China
基金
中国国家自然科学基金;
关键词
Megaprojects; Knowledge innovation; Factor independencies; Bayesian network; SAFETY BEHAVIOR; CONSTRUCTION; PROJECT; INTEGRATION; CREATION; SYSTEMS; COORDINATION; PERFORMANCE; STRATEGIES; FRAMEWORK;
D O I
10.1108/ECAM-03-2023-0244
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
PurposeMegaproject knowledge innovation (MKI) is perceived as a critical strategy for engineering value co-creation and industrial chain upgrading. Ascertaining the impact mechanism of MKI is a crucial initial step towards improving management practices. Within the framework of complex systems in megaprojects, factors exhibit intricate interdependencies. However, the current domain of knowledge has either overlooked or oversimplified this relationship and therefore cannot propose pragmatic and efficacious strategies for enhancing MKI. To close this gap, this study develops a Bayesian network (BN) model aiming to investigate the interdependencies among MKI-related factors and their impact on MKI.Design/methodology/approachFirst, this study implements literature review, expert interview and field investigation to identify the influencing factor nodes for the network model development. Second, a Bayesian network was constructed by integrating the expert knowledge with Dempster-Shafer theory. Next, a MKI measurement model was established using 253 training samples. Finally, the factor significance and optimal MKI improvement strategies are identified from the sensitivity analysis and probabilistic reasoning within the BNs.FindingsThe results indicate that (1) the BN model exhibits significant reliability and holds promotion and application value in formulating MKI management strategies; (2) knowledge sharing, shared vision and leadership are the key influencing factors of MKI; and (3) simultaneously improving institutional pressure, leadership and knowledge sharing is the most optimal strategy to enhance MKI.Originality/valueThis study innovatively introduced the BN method into the domain of MKI management, providing an appropriate approach for modelling complex relationships among factors and investigate nonlinear influences. The developed model raises megaproject stakeholders' awareness about factors influencing MKI and presents quantified strategies that increase the likelihood of maximising MKI levels. Its ease of generalisability positions it as a promising decision support tool, facilitating the implementation of sustainable MKI practices.
引用
收藏
页数:28
相关论文
共 120 条
  • [1] Project sustainability strategies: A systematic literature review
    Aarseth, Wenche
    Ahola, Tuomas
    Aaltonen, Kirsi
    Okland, Andreas
    Andersen, Bjorn
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (06) : 1071 - 1083
  • [2] Review:: Knowledge management and knowledge management systems:: Conceptual foundations and research issues
    Alavi, M
    Leidner, DE
    [J]. MIS QUARTERLY, 2001, 25 (01) : 107 - 136
  • [3] Knowledge Transformation in Project Networks: A Speech Act Level Cross-Boundary Analysis
    Alin, Pauli
    Taylor, John E.
    Smeds, Riitta
    [J]. PROJECT MANAGEMENT JOURNAL, 2011, 42 (04) : 58 - 75
  • [4] US construction labor productivity trends, 1970-1998
    Allmon, E
    Haas, CT
    Borcherding, JD
    Goodrum, PM
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (02): : 97 - 104
  • [5] Amidon D.M., 1993, Innovation Strategy
  • [6] Knowledge processes, knowledge-intensity and innovation: a moderated mediation analysis
    Andreeva, Tatiana
    Kianto, Aino
    [J]. JOURNAL OF KNOWLEDGE MANAGEMENT, 2011, 15 (06) : 1016 - 1034
  • [7] Baker M., 1997, J KNOWL MANAG, V1, P63, DOI DOI 10.1108/EUM0000000004581
  • [8] Behavioral determinants towards enhancing construction waste management: A Bayesian Network analysis
    Bakshan, Amal
    Srour, Issam
    Chehab, Ghassan
    El-Fadel, Mutasem
    Karaziwan, Jalal
    [J]. RESOURCES CONSERVATION AND RECYCLING, 2017, 117 : 274 - 284
  • [9] Response rate in academic studies - A comparative analysis
    Baruch, Y
    [J]. HUMAN RELATIONS, 1999, 52 (04) : 421 - 438
  • [10] Dynamics of inter-organizational knowledge creation and information technology use across object worlds: the case of an innovative construction project
    Berente, Nicholas
    Baxter, Ryan
    Lyytinen, Kalle
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2010, 28 (06) : 569 - 588