Selection and Layout Optimization of Double Tower Cranes

被引:3
作者
Fu, Yan [1 ]
Bu, Jiarui [1 ]
Lin, Jingjun [2 ]
Liu, Jun [3 ]
Zhang, Chunli [4 ]
机构
[1] Chongqing Univ, Sch Management Sci & Real Estate, Chongqing 400045, Peoples R China
[2] CCCC Urban Investment Holding Co Ltd, Guangzhou 510000, Peoples R China
[3] China Construct Second Engn Bur Ltd, Beijing, Peoples R China
[4] Chongqing Jianzhu Coll, Chongqing 400072, Peoples R China
关键词
tower crane; selection; layout; positioning optimization; value engineering; LOCATION; ALGORITHM; MODEL;
D O I
10.3390/buildings14061705
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
As the scale of construction expanded and the number of prefabricated buildings increased, a single tower crane could no longer meet the construction requirements, necessitating the simultaneous operation of more tower cranes to improve construction efficiency. To optimize the efficiency and cost of lifting prefabricated concrete components and address the selection and layout optimization of dual tower cranes, this paper proposed a double tower crane selection and positioning optimization model that integrated feasible layout area solving and optimization based on different objectives. By analyzing the mathematical relationship between the layout positions of the tower cranes and the positions of the prefabricated component storage yard and installation sites, a mathematical model for the feasible layout area of double tower cranes was established and solved using a genetic algorithm. On this basis, optimization models were established with the objectives of minimizing cost, achieving the shortest total lifting time, and achieving the maximum value coefficient, and they were solved using a genetic algorithm. The model was verified and analyzed through a case study. The research results indicated that the double tower crane selection scheme could achieve more than twice the lifting efficiency of the same model single tower crane. When the total lifting time was similar, choosing based on the principles of value engineering could yield the optimal solution with lower costs. These research findings provided a reference for the selection of tower crane schemes and the cost reduction and efficiency improvement of on-site prefabricated concrete component lifting construction.
引用
收藏
页数:28
相关论文
共 30 条
[1]   Decision support system for tower crane location and material supply point in construction sites using an integer linear programming model [J].
Amiri, Roya ;
Sardroud, Javad Majrouhi ;
Kermani, Vahid Momenaei .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (04) :1444-1462
[2]   Covering polygons with discs: The problem of crane selection and location on construction sites [J].
Briskorn, Dirk ;
Dienstknecht, Michael .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2020, 97
[3]   Mixed-integer programming models for tower crane selection and positioning with respect to mutual interference [J].
Briskorn, Dirk ;
Dienstknecht, Michael .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 273 (01) :160-174
[4]   A MODEL FOR DETERMINING OPTIMUM CRANE POSITION [J].
CHOI, CW ;
HARRIS, FC .
PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1991, 90 :627-634
[5]   Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations [J].
Dasovic, Borna ;
Galic, Mario ;
Klansek, Uros .
BUILDINGS, 2019, 9 (01)
[6]   A branch and bound approach for the tower crane selection and positioning problem with respect to mutual interference [J].
Dienstknecht, Michael .
4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2023, 21 (01) :105-123
[7]   New advancements, challenges and opportunities of multi-storey modular buildings - A state-of-the-art review [J].
Ferdous, Wahid ;
Bai, Yu ;
Tuan Duc Ngo ;
Manalo, Allan ;
Mendis, Priyan .
ENGINEERING STRUCTURES, 2019, 183 :883-893
[8]   Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming [J].
Huang, C. ;
Wong, C. K. ;
Tam, C. M. .
AUTOMATION IN CONSTRUCTION, 2011, 20 (05) :571-580
[9]   Discretized Cell Modeling for Optimal Layout of Multiple Tower Cranes [J].
Huang, Chun ;
Wang, Zi Kang ;
Li, Bei ;
Wang, Cong ;
Xu, Li Shan ;
Jiang, Kai ;
Liu, Meng ;
Guo, Cai Xia ;
Zhao, Xue Feng ;
Yang, He .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (08)
[10]   Optimization of crane setup location and servicing schedule for urgent material requests with non-homogeneous and non-fixed material supply [J].
Huang, Chun ;
Wong, C. K. .
AUTOMATION IN CONSTRUCTION, 2018, 89 :183-198