Analysis on dynamic characteristics of dam material and seismic response of embankment dam in Longyang Reservoir

被引:0
|
作者
Guo, Peng-fei [1 ]
Hou, Tian-shun [1 ]
Wang, Ya-chuan [1 ]
机构
[1] Northwest A&F Univ, Coll Water Resources & Architectural Engn, Xianyang, Peoples R China
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
Embankment dam; Dynamic response analysis; Seismic permanent deformation; Finite element method; EXPANSIVE SOIL; CFR DAM; 3D; DEFORMATION; PERFORMANCE; BEHAVIOR; EARTHQUAKE;
D O I
10.1108/EC-03-2024-0222
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
PurposeThe geological conditions of Longyang Reservoir are complex and it is located in strong earthquake area. In order to determine its seismic characteristics, the seismic response and residual deformation of embankment dam should be studied to provide calculation basis for dam design and construction.Design/methodology/approachBased on the geological survey data of Longyang Reservoir, the dam filling materials are tested by dynamic deformation tests, and the equivalent linear constitutive model parameters of the filling materials are obtained. Based on Duncan-Chang E-B model, the stress state of embankment dam in Longyang Reservoir before earthquake is calculated, and the dynamic response and earthquake residual deformation of embankment dam in Longyang Reservoir under earthquake condition are calculated by using equivalent linear model and Shen Zhu-jiang's residual deformation model.FindingsThe results show that with the increase of dynamic shear strain, the dynamic shear modulus decreases and the damping ratio increases. The scatter plot between dynamic shear modulus and dynamic shear strain, and the scatter plot between damping ratio and dynamic shear strain under different confining pressures show strips. The calculation results shows that the acceleration of embankment dam in Longyang Reservoir increases with the increase of dam height, and the acceleration distribution has obvious amplification effect. Combined with the maximum dynamic shear strain during the earthquake and the state before the earthquake, the maximum vertical residual deformation of embankment dam in Longyang Reservoir is 2.98 cm which occurs at the top of the dam, calculated by the Shen Zhu-jiang's residual deformation model.Originality/value Finite element calculation model parameters of embankment dam are obtained by dynamic triaxial tests. Seismic dynamic responses and residual deformation of embankment dam are analyzed. With the increase of dam height, the acceleration distribution shows an obvious amplification effect. The vertical displacement of embankment dam is larger along the dam axis and decreases in the upstream and downstream direction. The maximum horizontal displacement of embankment dam occurs in the middle of upstream and downstream dam slopes.HighlightsFinite element calculation model parameters of embankment dam are obtained by dynamic triaxial tests.Seismic dynamic responses and residual deformation of embankment dam are analyzed.With the increase of dam height, the acceleration distribution shows an obvious amplification effect.The vertical displacement of embankment dam is larger along the dam axis and decreases in the upstream and downstream direction.The maximum horizontal displacement of embankment dam occurs in the middle of upstream and downstream dam slopes.
引用
收藏
页码:2102 / 2117
页数:16
相关论文
共 50 条
  • [21] Parametric Analysis of an Embankment Dam's Stability
    Bhutto, Amjad Hussain
    Zardari, Shahnawaz
    Bhurgri, Ghulam Shabir
    Zardari, Muhammad Auchar
    Bhanbhro, Riaz
    Babar, Muhammad Munir
    Memon, Bashir Ahmed
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2019, 9 (06) : 5016 - 5020
  • [22] Construction of high embankment dam material flow equilibrium system
    Zhang, Yan
    Xia, Guo-Ping
    EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (05) : 9175 - 9191
  • [23] Dynamic characteristics of tailings dam with geotextile tubes under seismic load
    Li, Qiaoyan
    Ma, Guowei
    Li, Ping
    Su, Zhandong
    REVIEWS ON ADVANCED MATERIALS SCIENCE, 2021, 60 (01) : 599 - 614
  • [24] Seismic input method for a gravity dam-reservoir water-foundation system considering the compressibility of water
    Wang, Fei
    Tan, Yuxian
    Song, Zhiqiang
    Liu, Yunhe
    Li, Chuang
    Hu, Ankui
    SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2025, 192
  • [25] Study on Filling Material Strength and Dam Failure Characteristics of Loess Dam
    Chen, Nengyuan
    Li, Qiang
    Wei, Wei
    Zhao, Danni
    Wu, Xiong
    Xu, Jiangbo
    Nan, Yalin
    Niu, Ligang
    APPLIED SCIENCES-BASEL, 2023, 13 (15):
  • [26] Review on Dynamic Behaviour of Earth Dam and Embankment During an Earthquake
    Behrouz Gordan
    Mohammad Asif Raja
    Danial Jahed Armaghani
    Azlan Adnan
    Geotechnical and Geological Engineering, 2022, 40 : 3 - 33
  • [27] Review on Dynamic Behaviour of Earth Dam and Embankment During an Earthquake
    Gordan, Behrouz
    Raja, Mohammad Asif
    Armaghani, Danial Jahed
    Adnan, Azlan
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2022, 40 (01) : 3 - 33
  • [28] Analysis of complex networks associated to seismic clusters near the Itoiz reservoir dam
    Jimenez, A.
    Tiampo, K. F.
    Posadas, A. M.
    Luzon, F.
    Donner, R.
    EUROPEAN PHYSICAL JOURNAL-SPECIAL TOPICS, 2009, 174 : 181 - 195
  • [29] Dynamic response characteristics of a tailing dam determined by shaking-table tests
    Jin, Jiaxu
    Ding, Qianshen
    Cui, Hongzhi
    Zhang, Pingyi
    Xiao, Xiaochun
    Lv, Xiangfeng
    ARABIAN JOURNAL OF GEOSCIENCES, 2020, 13 (18)
  • [30] Dynamic analysis of dam–reservoir-foundation interaction in time domain
    S. Küçükarslan
    Computational Mechanics, 2004, 33 : 274 - 281