Push-out performance of stud/channel steel connectors in UHPC for new precast concrete beam-slab connections

被引:0
|
作者
Zhang, Jianxin [1 ,2 ]
Zhang, Tingwei [1 ]
Yuan, Weitao [1 ]
机构
[1] Hebei Univ Technol, Sch Civil & Transportat Engn, 5340 Xiping Rd, Tianjin 300401, Peoples R China
[2] Hebei Univ Technol, Civil Engn Technol Res Ctr Hebei Prov, Tianjin, Peoples R China
基金
中国国家自然科学基金;
关键词
PC beam-Slab connection; stud connectors; channel steel connectors; shear strength; push-out test; STUD SHEAR CONNECTORS; COLUMN JOINT; BEHAVIOR; CHANNEL; DAMAGE; CAPACITY; TESTS;
D O I
10.1177/13694332241254605
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
At present, the connection between the beams and slabs adopting composite layers is cast on-site, which is laborious and time-consuming. In this study, a new type of precast concrete (PC) beam and PC slab connection, which was connected by stud/channel steel connectors, was proposed to enhance the efficiency of prefabricated construction. Push-out tests were carried out on 5 PC beam-slab specimens connected with studs and 3 PC beam-slab specimens with channel steel connectors. The test variables were the connecting methods of beam-slab, the connector reinforcement ratio and the connecting width between two slabs. The failure process, load and slip of the beam-slab connection were recorded. Then, the slip behavior, shear capacity and shear stiffness of the PC beam-slab connection were analyzed. The results showed that the new type of PC beam-slab connection proposed in this study was an effective form for transferring force between the beam and slabs. Based on the push-out test results, the shear mechanism of connectors was analyzed and the calculation formulas for shear strength of stud/channel steel connectors were put forward. The calculated values obtained from the proposed formula demonstrated a strong correlation with the test results, providing an accurate measurement of shear strength of the new type of PC beam-slab connection. This study offers a reference for realizing the fast-full assembly construction of PC frame.
引用
收藏
页码:1901 / 1921
页数:21
相关论文
共 50 条
  • [31] Study on seismic performance of precast concrete beam-column connections with UHPC shells
    Guan D.
    Tian W.
    Chen Z.
    Liu J.
    Guo Z.
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2023, 56 (01): : 49 - 56
  • [32] Push-out tests of shear connectors in U-shaped steel-concrete composite girder
    Liu, Yong
    Guo, Lanhui
    Shi, Jun
    Wang, Jingfeng
    STRUCTURES, 2021, 31 : 769 - 780
  • [33] HIGH TEMPERATURE PUSH-OUT TESTS ON DEMOUNTABLE SHEAR CONNECTORS OF STEEL-CONCRETE COMPOSITE BEAMS
    Mansilla, Roberto
    Espinós, Ana
    Payá-Faforteza, Ignacio
    Odenbreit, Christoph
    Romero, Manuel L.
    ce/papers, 2023, 6 (3-4) : 2074 - 2079
  • [34] Behavior of CFSC-Encased Shear Connectors in Steel-Concrete Joints: Push-Out Tests
    He, Shaohua
    Fang, Zhi
    Mosallam, Ayman S.
    Ouyang, Yi
    Zou, Chao
    JOURNAL OF STRUCTURAL ENGINEERING, 2020, 146 (04)
  • [35] Push-out test of the perforated corrugated plate shear connectors in steel-concrete composite structure
    School of Transportation, Southeast University, Nanjing
    Jiangsu, China
    Chang'an Daxue Xuebao, 2 (75-82):
  • [36] Performance of grouped stud connectors in precast steel-UHPC composite bridges under combined shear and tension loads
    Ding, Jingnan
    Zhu, Jinsong
    Shi, Teng
    ENGINEERING STRUCTURES, 2023, 277
  • [37] Shearing performance study for the stud connectors of steel lightweight aggregate concrete composite beam
    Liu, Dian-Zhong
    Liu, Dong-Hui
    Yu, Li
    Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2009, 41 (SUPPL. 2): : 169 - 172
  • [38] Push-out tests and a new approach for the design of secondary composite beam shear connections
    Ernst, Stefan
    Bridge, Russell Q.
    Wheeler, Andrew
    JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2009, 65 (01) : 44 - 53
  • [39] Push-out tests on demountable high-strength friction-grip bolt shear connectors in steel-precast UHPC composite beams for accelerated bridge construction
    Jiang, Haibo
    Fang, Haozhen
    Wu, Jinpeng
    Fang, Zhuangcheng
    Fang, Shu
    Chen, Gongfa
    STEEL AND COMPOSITE STRUCTURES, 2022, 45 (06): : 797 - 818
  • [40] Push-out tests on three innovative shear connectors for composite cold-formed steel concrete beams
    Bamaga, S. O.
    Tahir, M. M.
    Tan, C. S.
    Shek, P. N.
    Aghlara, R.