Power Transformer On-Load Capacity-Regulating Control and Optimization Based on Load Forecasting and Hesitant Fuzzy Control

被引:2
作者
Zou, Dexu [1 ,2 ]
Sun, Xinyu [3 ]
Quan, Hao [3 ]
Yin, Jianhua [3 ]
Peng, Qingjun [2 ]
Wang, Shan [2 ]
Dai, Weiju [2 ]
Hong, Zhihu [2 ]
机构
[1] Chongqing Univ, Sch Elect Engn, Chongqing 400044, Peoples R China
[2] China Southern Power Grid Yunnan Power Grid Co Ltd, Elect Power Res Inst, Kunming 650217, Peoples R China
[3] Nanjing Univ Sci & Technol, Sch Automat, Nanjing 210094, Peoples R China
来源
SYMMETRY-BASEL | 2024年 / 16卷 / 06期
关键词
on-load capacity-regulating transformer; power system symmetry; fuzzy control; load forecasting; CNN-LSTM;
D O I
10.3390/sym16060679
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
The operational stability of a power transformer exerts an extremely important impact on the power symmetry, balance, and security of power systems. When the grid load fluctuates greatly, if the load factor of the transformer cannot be maintained within a reasonable range, it leads to increased instability in grid operation. Adjusting the transformer capacity based on load changes is of great significance. The existing control methods for on-load capacity-regulating (OLCR) transformers have low timeliness, and the daily switching frequency of the capacity-regulating switch is not controlled. To ensure the safe and stable operation of transformers, this paper proposes a control method for OLCR transformers based on load prediction and fuzzy control. Firstly, the operating principle of OLCR transformers is analyzed, and a multi-strategy enhanced dung beetle optimizer (MSDBO) combined with a CNN-LSTM model is proposed for load forecasting. On this basis, the daily switching frequency of the capacity-regulating transformer is introduced, and hesitant fuzzy control is used to select the optimal capacity-regulating strategy relying on three factors: loss, economy, and switching frequency. Finally, simulation models are constructed using the MATLAB/SIMULINK platform and simulation analysis is conducted to verify the effectiveness and superiority of the proposed control method. For the three scenarios in this paper, the method reduces daily power loss by 28.5% to 56.3% and daily operating costs by 25.4% to 50.8%. The method used in this paper can sacrifice 3.5% to 9.2% of the loss reduction capability in exchange for reducing the number of switch operations by 28.6% to 57.1%, significantly extending the lifespan of the switches and thereby increasing the operational lifespan of the transformer.
引用
收藏
页数:25
相关论文
共 21 条
[1]   基于CEEMDAN-SG-BiLSTM的变压器油中溶解气体体积分数预测 [J].
陈铁 ;
陈一夫 ;
李咸善 ;
陈卫东 ;
冷昊伟 ;
陈忠 .
高压电器, 2023, 59 (12) :168-175
[2]  
Fan Wenbo, 2011, Automation of Electric Power Systems, V35, P98
[3]  
Han S., 2013, Transformer, V50, P1
[4]  
Huo J., 2018, Transformer, V55, P38
[5]  
Meng Zhen Meng Zhen, 2013, Transactions of the Chinese Society of Agricultural Engineering, V29, P158
[6]  
Shi M., 2022, Guangdong Electric Power, V35, P110
[7]  
Wang J., 2009, Transformer, V46, P19
[8]  
Wang Jin-li, 2009, High Voltage Apparatus, V45, P32
[9]  
Wang JL, 2014, CHIN INT CONF ELECTR
[10]  
Wang Q., 2019, Transformer, V56, P23