A Constraint Programming Approach for Discrete Time-Cost Tradeoff Problems in a Time-Constrained Activity Network

被引:1
作者
Liu, Yang [1 ]
Liu, Dawei [1 ]
Rong, Yanzhao [2 ]
Song, Penghui [2 ]
Zou, Xin [3 ]
机构
[1] State Grid East Inner Mongolia Elect Power Supply, Hohhot 010010, Peoples R China
[2] China Railway Construct Engn Grp, Beijing 100160, Peoples R China
[3] North China Elect Power Univ, Sch Econ & Management, Baoding 071003, Peoples R China
基金
中国国家自然科学基金;
关键词
time-cost tradeoffs; time-window; time-schedule; time-switch; constraint programming; CRITICAL PATH; OPTIMIZATION MODEL; GENETIC ALGORITHM; OFF PROBLEM; CONSTRUCTION; RISK;
D O I
10.3390/buildings14072073
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The discrete time-cost tradeoff problem (DTCTP) is a well-researched topic in the field of operations research. The majority of existing DTCTP models are based on traditional activity networks, which permit the execution of an activity as soon as all its predecessors have been completed. This assumption is reasonable, but it is important to note that there are always exceptions. The main work of this study was threefold. Firstly, we expanded the analysis of the DTCTP to encompass time-constrained activity networks (DTCTPTC), which encompassed three different types of time constraints. The first constraint was the time-window constraint, which limited the time interval during which an activity could be executed. The second constraint was the time-schedule constraint, which specified the times at which an activity could begin execution. The third constraint was the time-switch constraint, which required project activities to start at specific times and remain inactive during designated time periods. Secondly, a constraint programming (CP) model was developed for the purpose of solving the DTCTPTC. The model employed interval variables to define the activity and its potential time constraints, while CP expressions were utilized to ensure the feasibility of the solution. The objective was to identify the optimal execution mode for each activity, the optimal start times for time-scheduled activities, and the optimal work/rest patterns for time-switch activities, with the aim of minimizing the total cost of the project. Finally, the efficacy of the proposed CP model was validated through two case studies based on two illustrative projects of varying sizes. The outcomes were then compared against existing algorithms. The results demonstrated that time constraints were important factors affecting schedule optimization, and the proposed CP model had the ability to solve large-scale DTCTPTC.
引用
收藏
页数:20
相关论文
共 50 条
  • [41] Pareto Front Particle Swarm Optimizer for Discrete Time-Cost Trade-Off Problem
    Aminbakhsh, Saman
    Sonmez, Rifat
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2017, 31 (01)
  • [42] A mixed (continuous plus discrete) time-cost trade-off model considering four different relationships with lag time
    Son, Jaeho
    Hong, TaeHoon
    Lee, Sangyoub
    KSCE JOURNAL OF CIVIL ENGINEERING, 2013, 17 (02) : 281 - 291
  • [43] Novel Hybrid Method in Time-Cost Trade-Off for Resource-Constrained Construction Projects
    Albayrak, Gulcag
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2020, 44 (04) : 1295 - 1307
  • [44] Modeling Time-Cost Trade-off Problem with Fuzzy Activity Duration Times
    Ma, Weimin
    Ke, Hua
    FOURTH INTERNATIONAL CONFERENCE ON COOPERATION AND PROMOTION OF INFORMATION RESOURCES IN SCIENCE AND TECHNOLOGY (COINFO 2009), 2009, : 344 - 347
  • [45] A comparative study of modeling and solution approaches for the multi-mode resource-constrained discrete time-cost trade-off problem: Case study of an ERP implementation project
    Cakir, Gizem
    Subulan, Kemal
    Yildiz, Seyda Topaloglu
    Hamzadayi, Alper
    Asilkefeli, Ceren
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 169
  • [46] Parallel Machine Scheduling Problem with Time Windows: A Constraint Programming and tabu search hybrid approach
    He, RJ
    PROCEEDINGS OF 2005 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-9, 2005, : 2939 - 2944
  • [47] The container premarshalling problem under limited crane time: A constraint programming approach
    Jimenez-Piqueras, Celia
    Parreno-Torres, Consuelo
    Alvarez-Valdes, Ramon
    Ruiz, Ruben
    COMPUTERS & OPERATIONS RESEARCH, 2024, 166
  • [48] Time-cost optimization model proposal for construction projects with genetic algorithm and fuzzy logic approach
    Yildirim, Hatice Acar
    Akcay, Cemil
    REVISTA DE LA CONSTRUCCION, 2019, 18 (03): : 554 - 567
  • [49] Time-cost-security tradeoff optimization in project logistics based on decision network planning
    Tong Shi-qi
    Wang Nuo
    Xie Chun-xiao
    Luan Hang
    PROCEEDINGS OF THE 14TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A AND B: BUILDING CORE COMPETENCIES THROUGH IE&EM, 2007, : 206 - 210
  • [50] Productivity-Based Automated Itinerarey Anime: A Simulation based on the Approach of Time-Cost Analysis Compensation
    Gelisen, Gokhan
    Griffis, F. H.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (04)