A Constraint Programming Approach for Discrete Time-Cost Tradeoff Problems in a Time-Constrained Activity Network

被引:1
作者
Liu, Yang [1 ]
Liu, Dawei [1 ]
Rong, Yanzhao [2 ]
Song, Penghui [2 ]
Zou, Xin [3 ]
机构
[1] State Grid East Inner Mongolia Elect Power Supply, Hohhot 010010, Peoples R China
[2] China Railway Construct Engn Grp, Beijing 100160, Peoples R China
[3] North China Elect Power Univ, Sch Econ & Management, Baoding 071003, Peoples R China
基金
中国国家自然科学基金;
关键词
time-cost tradeoffs; time-window; time-schedule; time-switch; constraint programming; CRITICAL PATH; OPTIMIZATION MODEL; GENETIC ALGORITHM; OFF PROBLEM; CONSTRUCTION; RISK;
D O I
10.3390/buildings14072073
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The discrete time-cost tradeoff problem (DTCTP) is a well-researched topic in the field of operations research. The majority of existing DTCTP models are based on traditional activity networks, which permit the execution of an activity as soon as all its predecessors have been completed. This assumption is reasonable, but it is important to note that there are always exceptions. The main work of this study was threefold. Firstly, we expanded the analysis of the DTCTP to encompass time-constrained activity networks (DTCTPTC), which encompassed three different types of time constraints. The first constraint was the time-window constraint, which limited the time interval during which an activity could be executed. The second constraint was the time-schedule constraint, which specified the times at which an activity could begin execution. The third constraint was the time-switch constraint, which required project activities to start at specific times and remain inactive during designated time periods. Secondly, a constraint programming (CP) model was developed for the purpose of solving the DTCTPTC. The model employed interval variables to define the activity and its potential time constraints, while CP expressions were utilized to ensure the feasibility of the solution. The objective was to identify the optimal execution mode for each activity, the optimal start times for time-scheduled activities, and the optimal work/rest patterns for time-switch activities, with the aim of minimizing the total cost of the project. Finally, the efficacy of the proposed CP model was validated through two case studies based on two illustrative projects of varying sizes. The outcomes were then compared against existing algorithms. The results demonstrated that time constraints were important factors affecting schedule optimization, and the proposed CP model had the ability to solve large-scale DTCTPTC.
引用
收藏
页数:20
相关论文
共 50 条
  • [21] A Pareto Multi-Objective Optimization Approach for Solving Time-Cost-Quality Tradeoff Problems
    Diao, Xundi
    Li, Heng
    Zeng, Saixing
    Tam, Vivian W. Y.
    Guo, Hongling
    TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2011, 17 (01) : 22 - 41
  • [22] Optimizing of Discrete Time-Cost in Construction Projects Using New Adaptive Weight Formulations
    Togan, Vedat
    Berberoglu, Neslihan
    Dede, Tayfun
    KSCE JOURNAL OF CIVIL ENGINEERING, 2022, 26 (02) : 511 - 521
  • [23] An integer programming formulation for the project scheduling problem with irregular time-cost tradeoffs
    Szmerekovsky, Joseph G.
    Venkateshan, Prahalad
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (07) : 1402 - 1410
  • [24] Constraint Programming approach to time-window and multiresource-constrained projects portfolio prototyping
    Bach, Irena
    Bocewicz, Grzegorz
    Banaszak, Zbigniew
    NEW FRONTIERS IN APPLIED ARTIFICIAL INTELLIGENCE, 2008, 5027 : 767 - 776
  • [25] Research on the Hierarchical Discrete Time-Cost Trade-Off Problem for Program
    Chen, Liangwei
    Zhang, Jingwen
    Peng, Wuliang
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (07)
  • [26] Solving the time-discrete winter runway scheduling problem: A column generation and constraint programming approach
    Pohl, Maximilian
    Artigues, Christian
    Kolisch, Rainer
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 299 (02) : 674 - 689
  • [27] Optimizing of Discrete Time-Cost in Construction Projects Using New Adaptive Weight Formulations
    Vedat Toğan
    Neslihan Berberoğlu
    Tayfun Dede
    KSCE Journal of Civil Engineering, 2022, 26 : 511 - 521
  • [28] Modeling stochastic project time-cost trade-offs with time-dependent activity durations
    Ke, Hua
    Ma, Weimin
    Chen, Xiaowei
    APPLIED MATHEMATICS AND COMPUTATION, 2012, 218 (18) : 9462 - 9469
  • [29] Solution of discrete time-cost trade-off problem with adaptive search domain
    Bettemir, Onder Halis
    Birgonul, M. Talat
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2025, 32 (02) : 1032 - 1052
  • [30] Resource Constrained Time-cost Trade-off Problem and its Genetic Algorithm Solution
    Feng, Yixiong
    Lin, Xiaohua
    Tan, Jianrong
    APPLIED MATHEMATICS & INFORMATION SCIENCES, 2013, 7 (02): : 639 - 643