A Constraint Programming Approach for Discrete Time-Cost Tradeoff Problems in a Time-Constrained Activity Network

被引:1
作者
Liu, Yang [1 ]
Liu, Dawei [1 ]
Rong, Yanzhao [2 ]
Song, Penghui [2 ]
Zou, Xin [3 ]
机构
[1] State Grid East Inner Mongolia Elect Power Supply, Hohhot 010010, Peoples R China
[2] China Railway Construct Engn Grp, Beijing 100160, Peoples R China
[3] North China Elect Power Univ, Sch Econ & Management, Baoding 071003, Peoples R China
基金
中国国家自然科学基金;
关键词
time-cost tradeoffs; time-window; time-schedule; time-switch; constraint programming; CRITICAL PATH; OPTIMIZATION MODEL; GENETIC ALGORITHM; OFF PROBLEM; CONSTRUCTION; RISK;
D O I
10.3390/buildings14072073
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The discrete time-cost tradeoff problem (DTCTP) is a well-researched topic in the field of operations research. The majority of existing DTCTP models are based on traditional activity networks, which permit the execution of an activity as soon as all its predecessors have been completed. This assumption is reasonable, but it is important to note that there are always exceptions. The main work of this study was threefold. Firstly, we expanded the analysis of the DTCTP to encompass time-constrained activity networks (DTCTPTC), which encompassed three different types of time constraints. The first constraint was the time-window constraint, which limited the time interval during which an activity could be executed. The second constraint was the time-schedule constraint, which specified the times at which an activity could begin execution. The third constraint was the time-switch constraint, which required project activities to start at specific times and remain inactive during designated time periods. Secondly, a constraint programming (CP) model was developed for the purpose of solving the DTCTPTC. The model employed interval variables to define the activity and its potential time constraints, while CP expressions were utilized to ensure the feasibility of the solution. The objective was to identify the optimal execution mode for each activity, the optimal start times for time-scheduled activities, and the optimal work/rest patterns for time-switch activities, with the aim of minimizing the total cost of the project. Finally, the efficacy of the proposed CP model was validated through two case studies based on two illustrative projects of varying sizes. The outcomes were then compared against existing algorithms. The results demonstrated that time constraints were important factors affecting schedule optimization, and the proposed CP model had the ability to solve large-scale DTCTPTC.
引用
收藏
页数:20
相关论文
共 50 条
  • [1] Integrated time-cost tradeoff and resources leveling problems with allowed activity splitting
    Hariga, Moncer
    Shamayleh, Abdulrahim
    El-Wehedi, Fekrat
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2019, 26 (01) : 80 - 99
  • [2] Mining Time-constrained Sequential Patterns with Constraint Programming
    John O. R. Aoga
    Tias Guns
    Pierre Schaus
    Constraints, 2017, 22 : 548 - 570
  • [3] Mining Time-constrained Sequential Patterns with Constraint Programming
    Aoga, John O. R.
    Guns, Tias
    Schaus, Pierre
    CONSTRAINTS, 2017, 22 (04) : 548 - 570
  • [4] Discrete Time-Cost Tradeoff with a Novel Hybrid Meta-Heuristic
    Srivastava, Kamal
    Srivastava, Sanjay
    Pathak, Bhupendra. K.
    Deb, Kalyanmoy
    MULTIPLE CRITERIA DECISION MAKING FOR SUSTAINABLE ENERGY AND TRANSPORTATION SYSTEMS: PROCEEDINGS OF THE 19TH INTERNATIONAL CONFERENCE ON MULTIPLE CRITERIA DECISION MAKING, 2010, 634 : 177 - 188
  • [5] Preprocessing the Discrete Time-Cost Tradeoff Problem with Generalized Precedence Relations
    Wei, Hanying
    Su, Zhixiong
    Zhang, Yuan
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020
  • [6] A solution approach to find the critical path in a time-constrained activity network
    Guerriero, F.
    Talarico, L.
    COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (09) : 1557 - 1569
  • [7] A multi-mode resource-constrained discrete time-cost tradeoff problem and its genetic algorithm based solution
    Peng Wuliang
    Wang Chengen
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (06) : 600 - 609
  • [8] Time-Cost Tradeoff Analysis in Project Management: An Ant System Approach
    Mokhtari, Hadi
    Kazemzadeh, Reza Baradaran
    Salmasnia, Ali
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2011, 58 (01) : 36 - 43
  • [9] Time-cost tradeoff analysis with minimized project financing cost
    Alavipour, S. M. Reza
    Arditi, David
    AUTOMATION IN CONSTRUCTION, 2019, 98 : 110 - 121
  • [10] Integrated Fuzzy-HMH for project uncertainties in time-cost tradeoff problem
    Pathak, Bhupendra Kumar
    Srivastava, Sanjay
    APPLIED SOFT COMPUTING, 2014, 21 : 320 - 329