A line balancing problem with parallel workers and cycle time minimization

被引:0
|
作者
Melega, Gislaine Mara [1 ,2 ]
Belgarch, Sanae [1 ]
Jans, Raf [1 ]
Paquette, Julie [1 ]
机构
[1] HEC Montreal, Dept Logist & Operat Management, 3000 Chem Cote St Catherine, Montreal, PQ H3T 2A7, Canada
[2] CIRRELT, 3000 Chem Cote St Catherine, Montreal, PQ H3T 2A7, Canada
关键词
Line balancing; parallel stations; general and serial task structure; network flow formulation; third party logistics provider; MODEL ASSEMBLY LINES; ALGORITHM; MULTIPLE; ASSIGNMENT; DESIGN; OPTIMIZATION; WORKSTATIONS; BRANCH;
D O I
10.1080/03155986.2024.2393039
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
We study the problem of balancing assembly lines with parallel workers, motivated by features observed at a third-party logistics provider. The assembly line differs from the two known types of line balancing problems in the literature since it determines simultaneously the line cycle time and the number of workers per station. Furthermore, each station can be occupied by more than one worker and a restriction on the minimum number of stations is imposed. This new type of line balancing problem minimizes the line cycle time, where two types of decisions must be made: how to group the tasks into stations and how many workers to assign to each station. We adapt mathematical models based on assembly line balancing problems with parallel stations. Furthermore, we propose a new model based on network flow formulations for the special case of lines with a serial task structure, frequently observed at the company. We perform an extensive computational study with realistic instances in order to compare the speed of solving different formulations, which is important as such a problem is at the operational level. We also provide a sensitivity analysis of key parameters aiming to better understand the trade-offs and provide meaningful managerial insights.
引用
收藏
页数:31
相关论文
共 50 条
  • [31] Alternative subgraphs assembly line balancing problem with resource selection and parallel stations
    Leiber, Daria
    Vuong, Anh-Tu
    Reinhart, Gunther
    ENGINEERING OPTIMIZATION, 2022, 54 (11) : 1903 - 1918
  • [32] Optimization of parallel disassembly line balancing problem with different operators between workstations
    Zhang Z.-Q.
    Xu P.-Y.
    Jiang J.
    Zhang Y.
    Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2021, 55 (10): : 1795 - 1805and1814
  • [33] Multiple-colony ant algorithm for parallel assembly line balancing problem
    Ozbakir, Lale
    Baykasoglu, Adil
    Gorkemli, Beyza
    Gorkemli, Latife
    APPLIED SOFT COMPUTING, 2011, 11 (03) : 3186 - 3198
  • [34] Alternative subgraphs assembly line balancing problem with resource selection and parallel stations
    Leiber, Daria
    Vuong, Anh-Tu
    Reinhart, Gunther
    Engineering Optimization, 2022, 54 (11): : 1903 - 1918
  • [35] Minimization of Bottleneck and Workstations for Assembly Line Balancing Problem in Power Transformer Manufacturing Using Heuristics
    Abu Bakar, Nurhanani
    Ramli, Mohammad Fadzli
    Zakaria, Mohd Zakimi
    Sin, Tan Chan
    Masran, Hafiz
    2018 IEEE 5TH INTERNATIONAL CONFERENCE ON SMART INSTRUMENTATION, MEASUREMENT AND APPLICATION (ICSIMA), 2018,
  • [36] AN ALGORITHM FOR THE LINE BALANCING PROBLEM
    GUTJAHR, AL
    NEMHAUSER, GL
    MANAGEMENT SCIENCE, 1964, 11 (02) : 308 - 315
  • [37] Balancing parallel assembly lines with disabled workers
    Araujo, Felipe F. B.
    Costa, Alysson M.
    Miralles, Cristobal
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2015, 9 (03) : 344 - 365
  • [38] Balancing just-in-time production units:: The N U-line balancing problem
    Sparling, D
    INFOR, 1998, 36 (04) : 215 - 237
  • [39] Risk-averse assembly line worker assignment and balancing problem with limited temporary workers and moving workers
    Liu, Ming
    Liu, Zhongzheng
    Chu, Feng
    Liu, Rongfan
    Zheng, Feifeng
    Chu, Chengbin
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2022, 60 (23) : 7074 - 7092
  • [40] MINIMIZATION OF PRODUCTION LINE WORK CYCLE
    BABUSHKIN, AI
    BASHTA, AL
    BELOV, IS
    DUSHIN, BI
    AUTOMATION AND REMOTE CONTROL, 1975, 36 (06) : 1024 - 1030