Exact Mixed-Integer Programming Approach for Chance-Constrained Multi-Area Reserve Sizing

被引:5
作者
Cho, Jehum [1 ]
Papavasiliou, Anthony [2 ]
机构
[1] Catholic Univ Louvain, Ctr Operat Res & Econometr, B-1348 Louvain La Neuve, Belgium
[2] Natl Tech Univ Athens, Dept Elect & Comp Engn, Zografos 15780, Greece
基金
欧洲研究理事会;
关键词
Chance constraints; mixed-integer programming; multi-area reserve sizing; probabilistic constraints; ENERGY;
D O I
10.1109/TPWRS.2023.3279692
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
An exact algorithm is developed for the chance-constrained multi-area reserve sizing problem in the presence of transmission network constraints. The problem can be cast as a two-stage stochastic mixed integer linear program using sample approximation. Due to the complicated structure of the problem, existing methods attempt to find a feasible solution based on heuristics. Existing mixed-integer algorithms that can be applied directly to a two-stage stochastic program can only address small-scale problems that are not practical. We have found a minimal description of the projection of our problem onto the space of the first-stage variables. This enables us to directly apply more general Integer Programming techniques for mixing sets, that arise in chance-constrained problems. Combining the advantages of the minimal projection and the strengthening reformulation from IP techniques, our method can tackle real-world problems. We specifically consider a case study of the 10-zone Nordic network with 100,000 scenarios where the optimal solution can be found in approximately 5 minutes.
引用
收藏
页码:3310 / 3323
页数:14
相关论文
共 34 条
[1]   On the mixing set with a knapsack constraint [J].
Abdi, Ahmad ;
Fukasawa, Ricardo .
MATHEMATICAL PROGRAMMING, 2016, 157 (01) :191-217
[2]  
[Anonymous], 2020, ACER, Commission Regulation (EU) 2017/2195
[3]  
[Anonymous], 2022, Energinet, Commission Regulation (EU) 2017/1485
[4]  
[Anonymous], 2017, Commission Regulation (EU) 2017/2195
[5]  
Atamtürk A, 2000, MATH PROGRAM, V89, P35, DOI 10.1007/s101070000154
[6]   Partitioning procedures for solving mixed-variables programming problems [J].
Benders, J. F. .
COMPUTATIONAL MANAGEMENT SCIENCE, 2005, 2 (01) :3-19
[7]  
Boe J., 2017, M.S. the-sis
[8]   Incorporating Post Zonal Reserve Deployment Transmission Constraints Into Energy and Ancillary Service Co-Optimization [J].
Chen, Yonghong ;
Gribik, Paul ;
Gardner, Joe .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2014, 29 (02) :537-549
[9]  
Cho J., 2022, UCLouvain CORE discussion paper
[10]   Sizing and allocation of frequency restoration reserves for LFC Block cooperation [J].
de Haan, J. E. S. ;
Gibescu, M. ;
Klaar, D. A. M. ;
Kling, W. L. .
ELECTRIC POWER SYSTEMS RESEARCH, 2015, 128 :60-65