Investment Strategy and Benefit Analysis of Power and Heat Hybrid Energy Storage in Industrial Parks Based on Energy Performance Contracting

被引:0
|
作者
Xiao, Feng [1 ]
Wang, Yali [2 ]
机构
[1] Hunan Prov Architectural Design Inst, Changsha 410011, Peoples R China
[2] Changsha Univ Sci & Technol, Sch Econ & Management, Changsha 410076, Peoples R China
关键词
energy performance contracting; energy service company; energy-saving renovation; energy storage investment; power and heat hybrid energy storage; EPC;
D O I
10.3390/pr12050946
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
To solve the problems of a single mode of energy supply and high energy cost in the park, the investment strategy of power and heat hybrid energy storage in the park based on contract energy management is proposed. Firstly, the concept of energy performance contracting (EPC) and the advantages and disadvantages of its main modes are analyzed, and the basic scheme of EPC for parks is proposed combined with the actual demand. Furthermore, the multiple energy storage model for power and heat storage in parks is established, which includes lithium batteries and heat storage tanks. Based on this, minimizing the annual operation cost of parks is taken as the optimization goal, and the capacity optimization model for power and heat storage is constructed, which considers the investment costs, operation and maintenance costs, purchased energy costs, peak-shaving subsidy, and environmental subsidy. Finally, an industrial park is selected as an example of EPC to verify the effectiveness of our proposed investment strategy. The results show that compared with the situation before the energy-saving renovation, the park can save 35.14 ten thousand CNY in annual cost expenses. When the unit power price of the lithium battery exceeds 3900 CNY/kW, the unit capacity price exceeds 5460 CNY/kWh, the unit power price of the heat storage tank (HST) exceeds 6000 CNY/kW, and the unit capacity price exceeds 1000 CNY/kWh, the configuration of the lithium battery and HST in the park is no longer the optimal choice to perform the energy-saving renovation.
引用
收藏
页数:19
相关论文
共 4 条
  • [1] AHP-based risk analysis of energy performance contracting projects in Russia
    Garbuzova-Schlifter, Maria
    Madlener, Reinhard
    ENERGY POLICY, 2016, 97 : 559 - 581
  • [2] Game-theory-based analysis of Energy Performance Contracting for building retrofits
    Liu Huimin
    Zhang Xinyue
    Hu Mengyue
    JOURNAL OF CLEANER PRODUCTION, 2019, 231 : 1089 - 1099
  • [3] Establishing financial trading market system of Energy Performance Contracting in China based on investment and financing platform
    Han, Min
    Lv, Fang
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 2429 - +
  • [4] Energy performance contracting, risk factors, and policy implications: Identification and analysis of risks based on the best-worst network method
    Wang, Zhenfeng
    Xu, Guangyin
    Lin, Ruojue
    Wang, Heng
    Ren, Jingzheng
    ENERGY, 2019, 170 : 1 - 13