Development of a Mathematical Model of Operation Reliability of Mine Hoisting Plants

被引:11
作者
Shishkin, Pavel V. [1 ]
Malozyomov, Boris V. [2 ]
Martyushev, Nikita V. [3 ]
Sorokova, Svetlana N. [4 ]
Efremenkov, Egor A. [4 ]
Valuev, Denis V. [5 ]
Qi, Mengxu [3 ]
机构
[1] Empress Catherine II St Petersburg Min Univ, Dept Transport Technol Proc & Machines, St Petersburg 199106, Russia
[2] Novosibirsk State Tech Univ, Dept Electrotech Complexes, Novosibirsk 630073, Russia
[3] Tomsk Polytech Univ, Dept Adv Technol, Tomsk 634050, Russia
[4] Tomsk Polytech Univ, Dept Mech Engn, Tomsk 634050, Russia
[5] Tomsk Polytech Univ, Yurga Technol Inst Branch, Yurga 652055, Russia
关键词
mathematical modelling; forecasting; technical reliability; verifiability; mining equipment; operating efficiency; FAULT-TREE ANALYSIS; MAINTENANCE; SYSTEM; EQUIPMENT; FAILURE;
D O I
10.3390/math12121843
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
The work analyzes the performance assurance of mine hoisting machines, including the problem of the quality of performance of the functions. The quality of functioning allows evaluation of a set of properties of the process of lifting loads, designed to meet the given requirements in accordance with the purpose and evaluated performance indicators. In this case, the quality of the function depends not only on the elements that worked properly or failed during system functioning but also on the moments involving certain changes in the states of the system. The considered system of power supply of mine hoisting installations is rather complex with respect to reliability. The proposed approach allows this rather complex system to lead in terms of the form of a serial connection of elements, allowing for determining the influence of the functioning of its subsystems and electrical equipment on the technological process of cargo lifting in a coal mine. The presented mathematical concept of increasing the reliability and failure-free operation of mine hoisting plants with the help of the developed mathematical model of the mine hoisting plant allowed studying the reliability indicators of the hoisting plant operation and reserving the equipment most effectively to increase reliability. The determination of coupling coefficients in this study made it possible to analyze the impact of the reliability of electrical equipment and power supply systems on the operation of technological machines to improve the reliability of mining equipment and the efficiency of technical systems of mining equipment.
引用
收藏
页数:24
相关论文
共 73 条
[61]  
Roy SK, 2001, T I MIN METALL A, V110, pA163
[62]  
Samanta B, 2002, T I MIN METALL A, V111, pA129
[63]   Reliability centered maintenance of cone crusher: a case study [J].
Sinha, R. S. ;
Mukhopadhyay, A. K. .
INTERNATIONAL JOURNAL OF SYSTEM ASSURANCE ENGINEERING AND MANAGEMENT, 2015, 6 (01) :32-35
[64]  
Skamyin A.N., 2023, P 2023 5 INT YOUTH C, DOI [10.1109/REEPE57272.2023.10086795, DOI 10.1109/REEPE57272.2023.10086795]
[65]   MINE POWER-SYSTEM RELIABILITY [J].
STANEK, EK ;
VENKATA, SS .
IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 1988, 24 (05) :827-838
[66]  
Taher M., 2016, J. Undergr. Resour, P37
[67]  
Troy D., The Importance of Efficient Mining Equipment
[68]  
Tuncay D., 2017, Bilimsel Madencilik Derg, V56, P55, DOI [10.30797/madencilik.388169, DOI 10.30797/MADENCILIK.388169]
[69]   Modeling and Improving the Efficiency of Crushing Equipment [J].
Vasilyeva, Natalia ;
Golyshevskaia, Uliana ;
Sniatkova, Aleksandra .
SYMMETRY-BASEL, 2023, 15 (07)
[70]   Reliability analysis and life cycle cost optimization: a case study from Indian industry [J].
Waghmode, Laxman Yadu ;
Patil, Rajkumar Bhimgonda .
INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2016, 33 (03) :414-429