共 48 条
[1]
Delay and Cost Overrun in Infrastructure Projects in Jordan
[J].
7TH INTERNATIONAL CONFERENCE ON ENGINEERING, PROJECT, AND PRODUCTION MANAGEMENT,
2017, 182
:18-24
[3]
Anbari F.T., 2003, PROJ MANAG J, V34, P12, DOI [DOI 10.1177/875697280303400403, 10.1177/875697280303400403]
[4]
Arafa M., 2011, Journal of Artificial Intelligence, V4, P63, DOI [DOI 10.3923/JAI.2011.63.75, 10.3923/jai.2011.63.75]
[8]
Improving the Results of the Earned Value Management Technique Using Artificial Neural Networks in Construction Projects
[J].
SYMMETRY-BASEL,
2020, 12 (10)
:1-17