Supply chain integrated resource-constrained multi-project scheduling problem

被引:2
作者
Asadujjaman, Md. [1 ]
Rahman, Humyun Fuad [2 ]
Chakrabortty, Ripon K. [3 ]
Ryan, Michael J. [4 ]
机构
[1] Rajshahi Univ Engn & Technol, Dept Ind & Prod Engn, Rajshahi, Bangladesh
[2] Newcastle Univ, Business Sch, 5 Barrack Rd, Newcastle Upon Tyne NE1 4SE, England
[3] Univ New South Wales, Sch Syst & Comp, Canberra, Australia
[4] Capabil Associates, Canberra, Australia
关键词
Supply chain management; Project scheduling; Multi-project; Meta-heuristic approach; Surrogation-based genetic algorithm; MATERIAL ORDERING PROBLEM; IMMUNE GENETIC ALGORITHM; WILCOXON TEST; OPTIMIZATION; PERFORMANCE; SELECTION; RULES;
D O I
10.1016/j.cie.2024.110380
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Over the last few decades, supply chain integrated project scheduling problems have received greater attention to ensure profitability in organizations. Supply chain integrated project scheduling incorporates ordering project materials, conducting procurement from the suppliers, supplying materials to the warehouse, and executing project activities that create value in the integrated system. This paper presents a mathematical model and solution methods for a supply chain integrated resource constrained multi-project scheduling problem (SCIRCMPSP) with discounted cash flows. The mathematical model for the proposed SCIRCMPSP considers decisions regarding materials ordering (MO), supplier selection (SS), procurement, inventory, sharing of global resources among the projects, and completion of project activities within the deadline. A mixed integer programming (MIP) model is proposed for this SCIRCMPSP that aims to maximize the project's net present value (NPV). Five different meta-heuristic approaches are proposed to solve the model: immune algorithm (IA), genetic algorithm (GA), IA with forward-backward improvement (FBI) (IAFBI), GA with FBI (GAFBI), and surrogation-based GA (SGA). The performance of the meta-heuristics was tested on 72 self- generated small-to-large SCIRCMPSP instances ranging from 2 to 20 projects in a multi-project set, each with 30 to 120 activities. The experimental results demonstrate that the proposed SGA is significantly (p < 0.05) . 05 ) better than other algorithms in generating quality solutions. The effectiveness of the proposed SGA is further validated by solving classical multi-project benchmark instances. The results show that the proposed SGA is effective not only in solving SCIRCMPSPs but also in solving multi-project scheduling benchmark instances.
引用
收藏
页数:25
相关论文
共 50 条
  • [31] Memetic algorithm for the resource-constrained project scheduling problem
    Chen, Di
    Liu, Shixin
    Qin, Shujin
    2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 4991 - 4996
  • [32] Resource-Constrained Project Scheduling Problem with Modified PSO
    Zhang, Kai
    Jiang, Jing
    Zhao, Guo-rong
    ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION, VOL 6: MODELLING & SIMULATION INDUSTRIAL ENGINEERING & MANAGEMENT, 2010, : 308 - 311
  • [33] A hybrid metaheuristic for the resource-constrained project scheduling problem
    Tseng, Lin-Yu
    Chen, Shih-Chieh
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (02) : 707 - 721
  • [34] On the summary measures for the resource-constrained project scheduling problem
    Van Eynde, Rob
    Vanhoucke, Mario
    Coelho, Jose
    ANNALS OF OPERATIONS RESEARCH, 2024, 337 (02) : 593 - 625
  • [35] The proactive and reactive resource-constrained project scheduling problem
    Davari, Morteza
    Demeulemeester, Erik
    JOURNAL OF SCHEDULING, 2019, 22 (02) : 211 - 237
  • [36] The preemptive stochastic resource-constrained project scheduling problem
    Creemers, Stefan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 277 (01) : 238 - 247
  • [37] Model Research of Multi-Objective and Resource-Constrained Project Scheduling Problem
    Zhou, Rong
    Ye, Chun-ming
    Ma, Hui-min
    19TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT: MANAGEMENT SYSTEM INNOVATION, 2013, : 991 - 1001
  • [38] A NOVEL VIBRATION DAMPING OPTIMIZATION ALGORITHM FOR RESOURCE CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEM
    Mehdizadeh, Esmaeil
    Akbari, Hamidreza
    ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, 2017, 51 (02) : 291 - 309
  • [39] Multi-mode resource-constrained project scheduling problem with activities overlapping
    Chu Z.
    Xu Z.
    Yu J.
    Xu, Zhe (xuzhebuaa@163.com), 1600, CIMS (23): : 557 - 566
  • [40] Resource Constrained Multi-project Scheduling: Application in Software Company
    Kurt, Pelin Akyil
    Kececi, Baris
    ADVANCES IN MANUFACTURING, PRODUCTION MANAGEMENT AND PROCESS CONTROL, 2019, 793 : 549 - 557