Supply chain integrated resource-constrained multi-project scheduling problem

被引:2
|
作者
Asadujjaman, Md. [1 ]
Rahman, Humyun Fuad [2 ]
Chakrabortty, Ripon K. [3 ]
Ryan, Michael J. [4 ]
机构
[1] Rajshahi Univ Engn & Technol, Dept Ind & Prod Engn, Rajshahi, Bangladesh
[2] Newcastle Univ, Business Sch, 5 Barrack Rd, Newcastle Upon Tyne NE1 4SE, England
[3] Univ New South Wales, Sch Syst & Comp, Canberra, Australia
[4] Capabil Associates, Canberra, Australia
关键词
Supply chain management; Project scheduling; Multi-project; Meta-heuristic approach; Surrogation-based genetic algorithm; MATERIAL ORDERING PROBLEM; IMMUNE GENETIC ALGORITHM; WILCOXON TEST; OPTIMIZATION; PERFORMANCE; SELECTION; RULES;
D O I
10.1016/j.cie.2024.110380
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Over the last few decades, supply chain integrated project scheduling problems have received greater attention to ensure profitability in organizations. Supply chain integrated project scheduling incorporates ordering project materials, conducting procurement from the suppliers, supplying materials to the warehouse, and executing project activities that create value in the integrated system. This paper presents a mathematical model and solution methods for a supply chain integrated resource constrained multi-project scheduling problem (SCIRCMPSP) with discounted cash flows. The mathematical model for the proposed SCIRCMPSP considers decisions regarding materials ordering (MO), supplier selection (SS), procurement, inventory, sharing of global resources among the projects, and completion of project activities within the deadline. A mixed integer programming (MIP) model is proposed for this SCIRCMPSP that aims to maximize the project's net present value (NPV). Five different meta-heuristic approaches are proposed to solve the model: immune algorithm (IA), genetic algorithm (GA), IA with forward-backward improvement (FBI) (IAFBI), GA with FBI (GAFBI), and surrogation-based GA (SGA). The performance of the meta-heuristics was tested on 72 self- generated small-to-large SCIRCMPSP instances ranging from 2 to 20 projects in a multi-project set, each with 30 to 120 activities. The experimental results demonstrate that the proposed SGA is significantly (p < 0.05) . 05 ) better than other algorithms in generating quality solutions. The effectiveness of the proposed SGA is further validated by solving classical multi-project benchmark instances. The results show that the proposed SGA is effective not only in solving SCIRCMPSPs but also in solving multi-project scheduling benchmark instances.
引用
收藏
页数:25
相关论文
共 50 条
  • [1] Resource-constrained multi-project scheduling problem: A survey
    Gomez Sanchez, Mariam
    Lalla-Ruiz, Eduardo
    Gil, Alejandro Fernandez
    Castro, Carlos
    Voss, Stefan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 309 (03) : 958 - 976
  • [2] The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem
    Wauters, Tony
    Kinable, Joris
    Smet, Pieter
    Vancroonenburg, Wim
    Vanden Berghe, Greet
    Verstichel, Jannes
    JOURNAL OF SCHEDULING, 2016, 19 (03) : 271 - 283
  • [3] Solving the resource-constrained multi-project scheduling problem with an improved critical chain method
    Tian, Min
    Liu, Ren Jing
    Zhang, Guang Jun
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2020, 71 (08) : 1243 - 1258
  • [4] A genetic algorithm with resource buffers for the resource-constrained multi-project scheduling problem
    Bredael, Dries
    Vanhoucke, Mario
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 315 (02) : 19 - 34
  • [5] Resource-Constrained Multi-Project Reactive Scheduling Problem With New Project Arrival
    Peng, Wuliang
    Yu, Dongmin
    Lin, Jiali
    IEEE ACCESS, 2023, 11 : 64370 - 64382
  • [6] Optimizing for a Resource-constrained Multi-project Scheduling Problem with Planned Resource Unavailability
    Tian, Jinwen
    Dong, Xingye
    Han, Sheng
    PROCEEDINGS OF THE 2018 3RD INTERNATIONAL CONFERENCE ON MODELLING, SIMULATION AND APPLIED MATHEMATICS (MSAM 2018), 2018, 160 : 243 - 248
  • [7] A particle swarm optimization for resource-constrained multi-project scheduling problem
    Deng Linyi
    Lin Yan
    CIS: 2007 INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND SECURITY, PROCEEDINGS, 2007, : 1010 - 1014
  • [8] EXPERIMENTAL IMPLEMENTATION OF A RESOURCE-CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEM SOLVER
    Mihaly, Krisztian
    Forrai, Monika Kulcsarne
    Kulcsar, Gyula
    HUNGARIAN JOURNAL OF INDUSTRY AND CHEMISTRY, 2021, 49 (02): : 53 - 58
  • [9] A survey in the resource-constrained project and multi-project scheduling problems
    Ben Issa, Samer
    Tu, Yiliu
    JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (02) : 117 - 138
  • [10] Optimization of Resource-Constrained Multi-Project Scheduling Problem based on the genetic algorithm
    Shu, Xin
    Su, Qiang
    Wang, Qian
    Wang, Qiugen
    2018 15TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT (ICSSSM), 2018,