Advanced Algorithms for the Reclaimer Scheduling Problem with Sequence-Dependent Setup Times and Availability Constraints

被引:0
|
作者
Benbrik, Oualid [1 ]
Benmansour, Rachid [1 ,2 ]
Elidrissi, Abdelhak [3 ]
Sifaleras, Angelo [4 ]
机构
[1] SI2M Lab INSEA, Rabat, Morocco
[2] Polytech Univ Hauts De France UVHC, INSA Hauts De France, LAMIH CNRS UMR 8201, Campus Mt Houy, F-59313 Valenciennes 9, France
[3] Int Univ Rabat, Rabat Business Sch, Parc Technopolis, Rabat, Morocco
[4] Univ Macedonia, Sch Informat Sci, Dept Appl Informat, 156 Egnatias Str, Thessaloniki 54636, Greece
来源
METAHEURISTICS, MIC 2024, PT I | 2024年 / 14753卷
关键词
Reclaimer Scheduling; Bulk Ports; Sequence-Dependent Setup Times; Availability Constraints; Machine Eligibility Restrictions; Variable Neighborhood Search; Heuristic;
D O I
10.1007/978-3-031-62912-9_28
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Scheduling of reclaimers activities in dry bulk terminals significantly impact terminal throughput, a crucial performance indicator for such facilities. This study addresses the Reclaimer Scheduling Problem (RSP) while considering periodic preventive maintenance activities for reclaimers. These machines are integral for reclaiming dry bulk materials stored in stockyards, facilitating their loading onto vessels via shiploaders. The primary aim of the objective function entails the minimization of the overall completion time, commonly referred to as the makespan. Since this problem is NP-hard, we propose a novel greedy constructive heuristic. The solutions obtained from this heuristic serve as the starting point for an efficient General Variable Neighborhood Search (GVNS) algorithm to handle medium-scale instances resembling real stockyard configurations. Computational experiments are conducted by comparing the proposed methods across various problem instances. The results demonstrate that the developed GVNS, coupled with the constructive heuristic for initial solution finding, efficiently improves scheduling efficacy. Thus, it emerges as a new state-of-the-art algorithm for this problem.
引用
收藏
页码:291 / 308
页数:18
相关论文
共 50 条
  • [11] Single machine scheduling with sequence-dependent setup times and delayed precedence constraints
    Yiyo Kuo
    Sheng-I Chen
    Yen-Hung Yeh
    Operational Research, 2020, 20 : 927 - 942
  • [12] Exact and heuristic algorithms for order acceptance and scheduling with sequence-dependent setup times
    Silva, Yuri Laio T. V.
    Subramanian, Anand
    Pessoa, Artur Alves
    COMPUTERS & OPERATIONS RESEARCH, 2018, 90 : 142 - 160
  • [13] New benchmark algorithms for No-wait Flowshop Group Scheduling Problem with Sequence-Dependent Setup Times
    Cheng, Chen-Yang
    Pourhejazy, Pourya
    Ying, Kuo-Ching
    Liao, Yi-Hsiu
    APPLIED SOFT COMPUTING, 2021, 111
  • [14] Fast and efficient algorithms to handle the dynamism in a single machine scheduling problem with sequence-dependent setup times
    Angel-Bello, Francisco
    Vallikavungal, Jobish
    Alvarez, Ada
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 152
  • [15] ROLLING HORIZON ALGORITHMS FOR A SINGLE-MACHINE DYNAMIC SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP TIMES
    OVACIK, IM
    UZSOY, R
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (06) : 1243 - 1263
  • [16] Metaheuristic solutions to the "Job shop scheduling problem with sequence-dependent setup times"
    Gonzalez, Miguel A.
    AI COMMUNICATIONS, 2013, 26 (04) : 419 - 421
  • [17] Heuristics for the Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup times
    Yong, Liao
    Zhantao, Li
    Xiang, Li
    Chenfeng, Peng
    Mathematical Problems in Engineering, 2022, 2022
  • [18] Heuristics for the Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup times
    Yong, Liao
    Zhantao, Li
    Xiang, Li
    Chenfeng, Peng
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [19] Customer order scheduling problem to minimize makespan with sequence-dependent setup times
    Prata, Bruno de Athayde
    Rodrigues, Carlos Diego
    Framinan, Jose Manuel
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 151
  • [20] Two approaches to handle the dynamism in a scheduling problem with sequence-dependent setup times
    Angel-Bello, Francisco
    Vallikavungal, Jobish
    Alvarez, Ada
    EXPERT SYSTEMS WITH APPLICATIONS, 2021, 167