Integrating long short-term memory for optimal control of 6-DOF welding robot arm

被引:0
|
作者
Phan, Gia-Hoang [1 ,2 ]
机构
[1] FPT Univ, Ho Chi Minh City, Vietnam
[2] FPT Univ Ho Chi Minh City, Lot E2a-7,St D1 High Tech Pk, Ho Chi Minh 700000, Vietnam
关键词
Welding robot arm; long short-term memory; artificial intelligence; six-degree-of-freedom; recurrent neural network;
D O I
10.1177/16878132241260525
中图分类号
O414.1 [热力学];
学科分类号
摘要
In the realm of mechatronics, robots stand out as emblematic manifestations of societal progress. The synergy between the evolution of robotic technologies and artificial intelligence (AI) has been pivotal in refining performance and elevating the automation capabilities of robotic arms. This study delves into the integration of the long short-term memory (LSTM) AI model in the control of the inverse dynamics of a six-degree-of-freedom welding robot arm, employing a velocity-based motion control methodology. Noteworthy for its innovative operational approach, this method is widely employed across diverse models of industrial robotic arms. The research findings underscore the superior optimization results achieved by the LSTM model during the accumulation of control signals, surpassing previous studies in the same domain. Anticipated as a catalyst for substantial improvements in the efficiency of welding robot operations, this model heralds a promising avenue for future advancements in optimization techniques.
引用
收藏
页数:15
相关论文
共 50 条
  • [1] QUANTUM LONG SHORT-TERM MEMORY
    Chen, Samuel Yen-Chi
    Yoo, Shinjae
    Fang, Yao-Lung L.
    2022 IEEE INTERNATIONAL CONFERENCE ON ACOUSTICS, SPEECH AND SIGNAL PROCESSING (ICASSP), 2022, : 8622 - 8626
  • [2] Human-robot interaction: predicting research agenda by long short-term memory
    Borregan-Alvarado, Jon
    Alvarez-Meaza, Izaskun
    Cilleruelo-Carrasco, Ernesto
    Rio-Belver, Rosa Maria
    PEERJ COMPUTER SCIENCE, 2024, 10
  • [3] A Recommender System Integrating Long Short-Term Memory and Latent Factor
    Rao Shen
    Arabian Journal for Science and Engineering, 2022, 47 : 9931 - 9941
  • [4] A Recommender System Integrating Long Short-Term Memory and Latent Factor
    Shen, Rao
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2022, 47 (08) : 9931 - 9941
  • [5] Long Short-Term Memory in Intelligent Buildings
    Serrano, Will
    2020 INTERNATIONAL CONFERENCE ON COMPUTING, ELECTRONICS & COMMUNICATIONS ENGINEERING (ICCECE, 2020, : 1 - 8
  • [6] Short-term Load Forecasting with Distributed Long Short-Term Memory
    Dong, Yi
    Chen, Yang
    Zhao, Xingyu
    Huang, Xiaowei
    2023 IEEE POWER & ENERGY SOCIETY INNOVATIVE SMART GRID TECHNOLOGIES CONFERENCE, ISGT, 2023,
  • [7] LIPREADING WITH LONG SHORT-TERM MEMORY
    Wand, Michael
    Koutnik, Jan
    Schmidhuber, Jurgen
    2016 IEEE INTERNATIONAL CONFERENCE ON ACOUSTICS, SPEECH AND SIGNAL PROCESSING PROCEEDINGS, 2016, : 6115 - 6119
  • [8] SIGN LANGUAGE RECOGNITION WITH LONG SHORT-TERM MEMORY
    Liu, Tao
    Zhou, Wengang
    Li, Hougiang
    2016 IEEE INTERNATIONAL CONFERENCE ON IMAGE PROCESSING (ICIP), 2016, : 2871 - 2875
  • [9] 6-Parametric factor model with long short-term memory
    Choi, Janghoon
    COMMUNICATIONS FOR STATISTICAL APPLICATIONS AND METHODS, 2021, 28 (05) : 521 - 536
  • [10] Short-Term Load Forecasting using A Long Short-Term Memory Network
    Liu, Chang
    Jin, Zhijian
    Gu, Jie
    Qiu, Caiming
    2017 IEEE PES INNOVATIVE SMART GRID TECHNOLOGIES CONFERENCE EUROPE (ISGT-EUROPE), 2017,