Tabu search based on novel neighborhood structures for solving job shop scheduling problem integrating finite transportation resources

被引:16
作者
Yao, Youjie [1 ]
Gui, Lin [1 ]
Li, Xinyu [1 ]
Gao, Liang [1 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Mech Sci & Engn, State Key Lab Intelligent Mfg Equipment & Technol, Wuhan 430074, Peoples R China
关键词
Integrated scheduling; Neighborhood structure; Job shop scheduling problem ([!text type='JS']JS[!/text]P); Transportation resource; Tabu search; SHIFTING BOTTLENECK; GENETIC ALGORITHM; LOCAL SEARCH; MACHINES;
D O I
10.1016/j.rcim.2024.102782
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
As advancements in transportation equipment intelligence continue, the job shop scheduling problem integrating finite transportation resources (JSPIFTR) has attracted considerable attention. Within the domain of shop scheduling, the neighborhood structure serves as a cornerstone for enabling intelligent optimization algorithms to effectively navigate and discover optimal solutions. However, current algorithms for JSPIFTR rely on generalized neighborhood structures, which incorporate operators like insertion and swap. While these structures are tailored to the encoding vectors, their utilization often leads to suboptimal optimization efficacy. To address this limitation, this paper introduces novel neighborhood structures specifically designed to the distinctive properties of JSPIFTR. These innovative structures leverage the intrinsic structural information in integrated scheduling, thereby enhancing the optimization effectiveness of the algorithm. Firstly, two theorems are presented to demonstrate the feasibility of the neighborhood solution. Secondly, different neighborhood structures for critical transportation and processing tasks are subsequently designed based on the analysis of the problem properties and constraints. Thirdly, an efficient fast evaluation method is developed to expediently calculate the objective value of the neighborhood solution. Finally, the novel neighborhood structures are combined with the tabu search (TS_NNS) and compared with other state-of-the-art methods on EX and NEX benchmarks. The comparative results demonstrate the remarkable performance of the neighborhood structure, with the TS_NNS enhancing the best solutions across 23 instances.
引用
收藏
页数:15
相关论文
共 48 条
[1]  
Abdelmaguid TF, 2004, INT J PROD RES, V42, P267, DOI [10.1080/0020754032000123579, 10.1080/0020754031000123579]
[2]   Bi-local search based variable neighborhood search for job-shop scheduling problem with transport constraints [J].
Abderrahim, Moussa ;
Bekrar, Abdelghani ;
Trentesaux, Damien ;
Aissani, Nassima ;
Bouamrane, Karim .
OPTIMIZATION LETTERS, 2022, 16 (01) :255-280
[3]   Scheduling of machines and automated guided vehicles in FMS using differential evolution [J].
Babu, A. Gnanavel ;
Jerald, J. ;
Haq, A. Noorul ;
Luxmi, V. Muthu ;
Vigneswaralu, T. P. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (16) :4683-4699
[4]   Guided local search with shifting bottleneck for job shop scheduling [J].
Balas, E ;
Vazacopoulos, A .
MANAGEMENT SCIENCE, 1998, 44 (02) :262-275
[5]   A coloured Petri net-based hybrid heuristic search approach to simultaneous scheduling of machines and automated guided vehicles [J].
Baruwa, Olatunde T. ;
Piera, Miquel A. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (16) :4773-4792
[6]   An integrated control strategy for simultaneous robot assignment, tool change and preventive maintenance scheduling using Heterogeneous Graph Neural Network [J].
Bhatta, Kshitij ;
Chang, Qing .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2023, 84
[7]   A time window approach to simultaneous scheduling of machines and material handling system in an FMS [J].
Bilge, U ;
Ulusoy, G .
OPERATIONS RESEARCH, 1995, 43 (06) :1058-1070
[8]  
Dell'Amico M., 1993, Annals of Operations Research, V41, P231, DOI 10.1007/BF02023076
[9]   A simple metaheuristic approach to the simultaneous scheduling of machines and automated guided vehicles [J].
Deroussi, L. ;
Gourgand, M. ;
Tchernev, N. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (08) :2143-2164
[10]   Integrated production and material handling scheduling using mathematical programming and constraint programming [J].
El Khayat, Ghada ;
Langevin, Andre ;
Riopel, Diane .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (03) :1818-1832