Study on deformation of tunnel pile foundation based on discrete element method and finite difference method

被引:0
|
作者
Zhao, Zhenchu [1 ]
Zhang, Yuan [2 ]
Dai, Fang [1 ]
机构
[1] Cent South Univ, Sch Civil Engn, Changsha, Peoples R China
[2] Zhongnan Engn Co Ltd, Power China, Changsha, Peoples R China
来源
PLOS ONE | 2024年 / 19卷 / 07期
基金
中国国家自然科学基金;
关键词
NUMERICAL-SIMULATION; CONSTRUCTION;
D O I
10.1371/journal.pone.0307405
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
The deformation of pile caused by tunnel excavation will weaken the bearing capacity of the foundation. In order to investigate the deformation response of pile induced by the construction of three-hole small spacing tunnel, the DEM-FDM (discrete element method and finite difference method) coupling numerical simulation method were used to simulate the deformation process of pile during tunnel excavation. This paper probed into the deformation response of pile by three factors: the length of pile, the pile-tunnel spacing, and the three-hole tunnel construction. The results showed that, as the pile-tunnel spacing decreases, the incremental horizontal displacement of the pile top became more significant when the three-hole tunnel was excavated. The excavation resulting in four zones of horizontal displacement concentration. The prominent locations were mainly concentrated on both sides of the tunnel and the ground directly above the tunnel. The research findings of this study can provide insights and references for the design and construction of shield tunneling under passing piles.
引用
收藏
页数:26
相关论文
共 50 条
  • [1] The Deformation and Failure Analysis of Rock Mass Around Tunnel by Coupling Finite Difference Method and Discrete Element Method
    Feng Huang
    Yi Wang
    Yunbo Wen
    Zhi Lin
    Hehua Zhu
    Indian Geotechnical Journal, 2019, 49 : 421 - 436
  • [2] The Deformation and Failure Analysis of Rock Mass Around Tunnel by Coupling Finite Difference Method and Discrete Element Method
    Huang, Feng
    Wang, Yi
    Wen, Yunbo
    Lin, Zhi
    Zhu, Hehua
    INDIAN GEOTECHNICAL JOURNAL, 2019, 49 (04) : 421 - 436
  • [3] Numerical method for retaining structures based on coupled finite difference method and discrete element method
    School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China
    Yantu Gongcheng Xuebao, 2009, 9 (1402-1407): : 1402 - 1407
  • [4] STUDY OF PILE DRIVING BY FINITE-ELEMENT METHOD
    MABSOUT, ME
    REESE, LC
    TASSOULAS, JL
    JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1995, 121 (07): : 535 - 543
  • [5] Discrete element method based investigation on displacement and bearing characteristics of pile foundation under seepage erosion
    Zhang Dong-mei
    Zhang Xue-liang
    Du Wei-wei
    ROCK AND SOIL MECHANICS, 2024, 45 (04) : 1181 - +
  • [6] Mechanical analysis of bridge pile foundation in high and steep slopes based on finite bar element method
    Zhao, M.-H. (mhzhaohd@21cn.com), 1600, Chang'an University (27):
  • [7] Monitoring method of equivalent horizontal displacement of foundation pit surrounding pile based on inverse finite element
    Zhang Y.
    Long S.
    Lai X.
    Kuang L.
    Su R.
    Lu S.
    Zhang L.
    Zhou J.
    Luo D.
    Liao M.
    Cehui Xuebao/Acta Geodaetica et Cartographica Sinica, 2024, 53 (01): : 126 - 136
  • [8] Finite/Explicit Finite Element - Finite Difference Coupling Method for Analysis of Soil - Foundation System
    Tang, Hui
    Li, Xiaojun
    Zhou, Guoliang
    Zhang, Chunming
    CIVIL, STRUCTURAL AND ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 838-841 : 913 - +
  • [9] Research on the Finite Element Analysis Method of the Bucket Foundation of Submerged Floating Tunnel
    Xiang, Jiajun
    Feng, Xu
    Feng, Shilun
    Mao, Jianbin
    MAINTENANCE, SAFETY, RISK, MANAGEMENT AND LIFE-CYCLE PERFORMANCE OF BRIDGES, 2018, : 859 - 864
  • [10] A two-pile foundation model in sloping ground by finite beam element method
    Peng, Wenzhe
    Zhao, Minghua
    Zhao, Heng
    Yang, Chaowei
    COMPUTERS AND GEOTECHNICS, 2020, 122