The Characteristics of ARMA (ARIMA) Model and Some Key Points to Be Noted in Application: A Case Study of Changtan Reservoir, Zhejiang Province, China

被引:0
作者
Liu, Zhuang [1 ]
Cui, Yibin [1 ]
Ding, Chengcheng [1 ]
Gan, Yonghai [1 ]
Luo, Jun [1 ]
Luo, Xiao [1 ]
Wang, Yongguo [2 ]
机构
[1] Nanjing Inst Environm Sci, Minist Ecol & Environm Peoples Republ China, Nanjing 210042, Peoples R China
[2] Taizhou Ecol Environm Bur, Huangyan Branch, Taizhou 318020, Peoples R China
基金
中国国家自然科学基金;
关键词
water quality prediction; environmental sustainability; time series; goodness of fit; prediction error; TREND ANALYSIS; WATER-QUALITY; PM2.5; TIME;
D O I
10.3390/su16187955
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Accurate water quality prediction is the basis for good water environment management and sustainable use of water resources. As an important time series forecasting model, the Autoregressive Moving Average Model (ARMA) plays a crucial role in environmental management and sustainability research. This study addresses the factors that affect the ARMA model's forecast accuracy and goodness of fit. The research results show that the sample size used for model parameters estimation is the main influencing factor for the goodness of fit of an ARMA model, and the prediction time is the main factor affecting the prediction error of the model. Constructing a stable and reliable ARMA model requires a certain number of samples for the estimation of model parameters. However, using an excessive number of samples will not further improve the ARMA model's goodness of fit but rather increase the workload and difficulty of data collection. The ARMA model is not suitable for long-term forecasting because the prediction error of ARMA models increases with the increase of prediction time, and when the prediction time exceeds a certain limit, the fitted values of an ARMA model will almost no longer change with the time, which means the model has lost its significance of prediction. For time series with periodic components, introducing periodic adjustment factors into the ARMA model can reduce the prediction error. These findings enable environmental managers and researchers to apply the ARMA model more rationally, hence developing more precise pollution control and sustainable development plans.
引用
收藏
页数:18
相关论文
共 49 条
  • [1] Water security and watershed management assessed through the modelling of hydrology and ecological integrity: A study in the Galicia-Costa (NW Spain)
    Acuna-Alonso, Carolina
    Pinheiro Fernandes, Antonio Carlos
    Alvarez, Xana
    Valero, Enrique
    Leal Pacheco, Fernando Antonio
    Pinto Varandas, Simone Da Graca
    Salgado Terencio, Daniela Patricia
    Sanches Fernandes, Luis Filipe
    [J]. SCIENCE OF THE TOTAL ENVIRONMENT, 2021, 759
  • [2] Forecasting of particulate matter with a hybrid ARIMA model based on wavelet transformation and seasonal adjustment
    Aladag, Erdinc
    [J]. URBAN CLIMATE, 2021, 39
  • [3] Extended linear and non-linear auto-regressive models for forecasting the urban water consumption of a fast-growing city in an arid region
    Banihabib, Mohammad Ebrahim
    Mousavi-Mirkalaei, Pezhman
    [J]. SUSTAINABLE CITIES AND SOCIETY, 2019, 48
  • [4] Relationship of meteorological factors and human brucellosis in Hebei province, China
    Cao, Long-ting
    Liu, Hong-hui
    Li, Juan
    Yin, Xiao-dong
    Duan, Yu
    Wang, Jing
    [J]. SCIENCE OF THE TOTAL ENVIRONMENT, 2020, 703 (703)
  • [5] Hybrid algorithm for short-term forecasting of PM2.5 in China
    Cheng, Yong
    Zhang, Hong
    Liu, Zhenhai
    Chen, Longfei
    Wang, Ping
    [J]. ATMOSPHERIC ENVIRONMENT, 2019, 200 : 264 - 279
  • [6] Cipra Tomas., 2020, Time series in economics and finance, DOI DOI 10.1007/978-3-030-46347-2
  • [7] Toward urban sustainability and clean potable water: Prediction of water quality via arti fi cial neural networks
    Dawood, Thikra
    Elwakil, Emad
    Novoa, Hector Mayol
    Garate Delgado, Jose Fernando
    [J]. JOURNAL OF CLEANER PRODUCTION, 2021, 291
  • [8] Empowering Sustainability: A Consumer-Centric Analysis Based on Advanced Electricity Consumption Predictions
    Durmus Senyapar, Hafize Nurgul
    Aksoz, Ahmet
    [J]. SUSTAINABILITY, 2024, 16 (07)
  • [9] Trend analysis and ARIMA modelling of recent groundwater levels in the White Volta River basin of Ghana
    Gibrilla A.
    Anornu G.
    Adomako D.
    [J]. Groundwater for Sustainable Development, 2018, 6 : 150 - 163
  • [10] Gupta Neetu, 2024, Procedia Computer Science, V235, P3191, DOI 10.1016/j.procs.2024.04.302