Modeling Hole Edge and Burr Formation During Drilling Using LS-DYNA

被引:0
|
作者
Sikulskyi, Valeriy [1 ]
Maiorova, Kateryna [1 ]
Garin, Vadim [1 ]
Myntiuk, Vitalii [1 ]
Sikulskyi, Stanislav [2 ]
机构
[1] Natl Aerosp Univ KhAI, Chkalova St 17, Kharkiv, Ukraine
[2] Corning Inc, 184 Sci Ctr Dr, Painted Post, NY USA
关键词
Drilling modeling; hole edge burrs; drill bit wear; residual strain; drilling force; LS-DYNA;
D O I
10.1007/978-3-031-61415-6_11
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Drilling is one of the most utilized technological processes in machining and manufacturing. Due to its scale, optimizing drilling parameters for increased productivity and quality has an overwhelming impact on manufacturing labor intensity and final product cost and performance. The quality of hole edges and its roughness, including the presence of burrs, are important parameters determining the part quality and might require post-processing for high-performance applications. Thus, optimizing the drilling process for forming holes with minimum roughness and burrs is a critical task and requires a comprehensive understanding of the process. This work investigated the major drilling parameters for hole forming with drill bits of various degrees of wear. Numerical modeling, particularly explicit finite element approach, was validated with the experiment and exploited due to the limitations of experimental tools to observe a full spectrum of internal material behavior during the dynamic process. The results have shown that hole edge burrs and drilling force progressively increased with the larger drill bit wear, while residual strains mostly varied their concentrations and affected larger material volume around the holes.
引用
收藏
页码:123 / 136
页数:14
相关论文
共 50 条
  • [21] FSI simulation of hydrodynamic ram event using LS-Dyna software
    Mansoori, Hassan
    Zarei, Hamidreza
    THIN-WALLED STRUCTURES, 2019, 134 : 310 - 318
  • [22] Optimization of millisecond parameters for hole by hole initiation in fan-shape deep holes based on LS-DYNA
    Deng, Hongwei
    Yang, Yiquan
    Gao, Feng
    Zhou, Keping
    Zhang, Jian
    Zhendong yu Chongji/Journal of Vibration and Shock, 2017, 36 (11): : 140 - 146
  • [23] Burr formation in short hole drilling by ultrasonic assistance
    Heisel, Uwe
    Stehle, Thomas
    Schaal, Michael
    Eisseler, Rocco
    PRODUCTION ENGINEERING-RESEARCH AND DEVELOPMENT, 2014, 8 (1-2): : 1 - 6
  • [24] Improving the Prediction of the Bainite and Ferrite Phase Transformation During Hot Stamping Simulations Using LS-DYNA
    George, Ryan
    Bardelcik, Alexander
    Worswick, Michael
    HOT SHEET METAL FORMING OF HIGH-PERFORMANCE STEEL CHS2 (4TH INTERNATIONAL CONFERENCE), 2013, (04): : 67 - 74
  • [25] MODELING OF PRESTRESSED BOLT CONNECTION IN LS-DYNA CRASH TEST ANALYSIS OF ROAD INFRACTRUCTURE
    Stopel, M.
    Cichanski, A.
    Skibicki, D.
    ENGINEERING MECHANICS 2017, 2017, : 922 - 925
  • [26] Finite element simulation of delamination growth in composite materials using LS-DYNA
    Elmarakbi, A. M.
    Hu, N.
    Fukunaga, H.
    COMPOSITES SCIENCE AND TECHNOLOGY, 2009, 69 (14) : 2383 - 2391
  • [27] Influence of parameter setting on the simulation result of underwater explosion using LS-DYNA
    Ding Ning
    Wang Tao
    Yu Wenli
    Wang Yuling
    THEORY AND PRACTICE OF ENERGETIC MATERIALS, VOL VII, 2007, : 761 - 764
  • [28] Performance limit analysis for common roadside and median barriers using LS-DYNA
    Ferdous, M. R.
    Abu-Odeh, Akram
    Bligh, Roger P.
    Jones, Harry L.
    Sheikh, Nauman M.
    INTERNATIONAL JOURNAL OF CRASHWORTHINESS, 2011, 16 (06) : 691 - 706
  • [29] Using LS-DYNA simulation to solve a design problem: bullnose guardrail example
    Reid, John D.
    Bielenberg, Bob W.
    Transportation Research Record, 1999, (1690): : 95 - 102
  • [30] The Damage Analysis of Underground Protective Works Attacked by MOP with Using LS-DYNA
    Zeng, Liang
    Wang, Wei-li
    Zhu, Jian-fang
    PROCEEDINGS OF FIRST INTERNATIONAL CONFERENCE OF MODELLING AND SIMULATION, VOL VI: MODELLING AND SIMULATION IN ARCHITECTURE, CIVIL ENGINEERING AND MATERIALS, 2008, : 157 - 162