Quantifying Hazard Exposure Using Real-Time Location Data of Construction Workforce and Equipment

被引:30
作者
Luo, X. [1 ]
Li, H. [1 ]
Huang, T. [1 ]
Skitmore, M. [2 ]
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Kowloon 999077, Hong Kong, Peoples R China
[2] Queensland Univ Technol, Sch Civil Engn & Built Environm, Brisbane, Qld 4027, Australia
关键词
Construction safety; Risk assessment; Quantitative hazard exposure; Proximity warning systems; Real-time location; Labor and personnel issues; PROXIMITY WARNING SYSTEM; SAFETY MANAGEMENT; SURFACE;
D O I
10.1061/(ASCE)CO.1943-7862.0001139
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Traditional risk-assessment methods typically evaluate accident probability, exposure frequency or duration, and consequence severity, respectively, and finally determine a quantitative risk score or a qualitative risk level. The assessment process is prospective and subjective. Changing and complex construction situations impede their practical and efficient application. To assess safety risk with regard to changing site conditions in an objective and efficient way, this study proposes a quantitative model for hazard exposure assessment based on real-time location data of construction workforce and equipment, collected by a location-based proximity warning system. In contrast with traditional risk-assessment methods, the model proposed in this study combines accident probability and hazard exposure duration into a single quantitative concepthazard exposure amount. This concept takes into account the space factor as well as the time factor of construction activities. For ease of understanding, a hazard is analogized as a radiation source and the hazard exposure is then referred to as the radiation quantity received. The longer duration and closer proximity in which a person is exposed to a radiation (hazard), the more radiation the person receives (the higher risk to which the person is exposed). A trial study is described in which a proximity warning system was developed and used to demonstrate and test the model's capability of hazard exposure assessment. This shows that the system can provide safety officers with an ongoing and immediate means of comparing safety risk trends from worker, hazard, and project perspectives.
引用
收藏
页数:11
相关论文
共 39 条
  • [1] A mechatronics security system for the construction site
    Abderrahim, M
    Garcia, E
    Diez, R
    Balaguer, C
    [J]. AUTOMATION IN CONSTRUCTION, 2005, 14 (04) : 460 - 466
  • [2] Comparative injury and fatality risk analysis of building trades
    Baradan, S
    Usmen, MA
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2006, 132 (05): : 533 - 539
  • [3] Ubiquitous location tracking for context-specific information delivery on construction sites
    Behzadan, Amir H.
    Aziz, Zeeshan
    Anumba, Chimay J.
    Kamat, Vineet R.
    [J]. AUTOMATION IN CONSTRUCTION, 2008, 17 (06) : 737 - 748
  • [4] A proactive system for real-time safety management in construction sites
    Carbonari, Alessandro
    Giretti, Alberto
    Naticchia, Berardo
    [J]. AUTOMATION IN CONSTRUCTION, 2011, 20 (06) : 686 - 698
  • [5] Choset H., 2005, Intelligent Robotics and Autonomous Agents series
  • [6] Cvach Maria, 2012, Biomed Instrum Technol, V46, P268, DOI 10.2345/0899-8205-46.4.268
  • [7] Department of Motor Vehicles, 2011, NYS DMV DRIV MAN
  • [8] Real-time safety early warning system for cross passage construction in Yangtze Riverbed Metro Tunnel based on the internet of things
    Ding, L. Y.
    Zhou, C.
    Deng, Q. X.
    Luo, H. B.
    Ye, X. W.
    Ni, Y. Q.
    Guo, P.
    [J]. AUTOMATION IN CONSTRUCTION, 2013, 36 : 25 - 37
  • [9] Developing a Risk Assessment Model for construction safety
    Fung, Ivan W. H.
    Tam, Vivian W. Y.
    Lo, Tommy Y.
    Lu, Lori L. H.
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2010, 28 (06) : 593 - 600
  • [10] Activity-Based Safety Risk Quantification for Concrete Formwork Construction
    Hallowell, Matthew R.
    Gambatese, John A.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2009, 135 (10): : 990 - 998