Identification of Key Safety Risk Factors and Coupling Paths in Mega Construction Projects

被引:8
作者
Xiang, Pengcheng [1 ]
Yang, Yingliu [1 ]
Yan, Kesheng [2 ]
Jin, Lianghai [2 ]
机构
[1] Chongqing Univ, Sch Management Sci & Real Estate, Chongqing 400045, Peoples R China
[2] China Three Gorges Univ, Coll Hydraul & Environm Engn, Yichang 443002, Hubei, Peoples R China
关键词
Mega construction projects (MCPs); Key safety risk factor; Coupling paths; Latent Dirichlet allocation (LDA) topic model; Social network analysis (SNA) and N-K model; MANAGEMENT; REPRESENTATION; IMPACT; MODEL;
D O I
10.1061/JMENEA.MEENG-5926
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Mega construction projects (MCPs) have long periods, complicated environments, a multiplicity of mechanical equipment and personnel, and a large number of safety risk factors on sites. The different safety risk factors of MCPs have coupling effects among them, which can produce new risks and even lead to an accident. These factors present a major challenge for project managers to take on risk management in MCPs. Although previous research has done much work on risk factor identification and control in MCPs, less attention has been given to the coupling effects among risk factors, which affect the identification effect of key safety risk factors and their coupling paths. To compensate for this gap, this research used the latent Dirichlet allocation (LDA) topic model to identify risk factors in mass accident reports, the N-K model to calculate the coupled style, and then coupled the N-K model and the social network analysis (SNA) model to identify the safety risk factors and determine the coupling paths in MCPs. The results reveal the following: (1) six first-level subsystems are identified, and there are 31 second-level safety risk factors included in MCPs; (2) H1 (low safety awareness), H2 (CAT operation), H6 (improper safety protection measures), P4 (improper safety supervisors), P5 (imperfect management system), S3 (owner's mistakes), and M2 (improper maintenance of equipment) are the key safety risk factors in MCPs; and (3) unfavorable environmental factors can easily lead to the emergence of the multirisk coupling of G-S-P-H-M-E, which should be carried out by special management. This research provides a reference for the identification and control of safety risks in MCPs and contributes to the development of complex system risk management and control research.
引用
收藏
页数:17
相关论文
共 58 条
  • [1] Exploratory Study on the Effectiveness of Interface-Management Practices in Dealing with Project Complexity in Large-Scale Engineering and Construction Projects
    Ahn, Seungjun
    Shokri, Samin
    Lee, SangHyun
    Haas, Carl T.
    Haas, Ralph C. G.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2017, 33 (02)
  • [2] Alsumait L., 2010, Text Mining: Applications and Theory, P183
  • [3] Fuzzy cognitive maps in systems risk analysis: a comprehensive review
    Bakhtavar, Ezzeddin
    Valipour, Mahsa
    Yousefi, Samuel
    Sadiq, Rehan
    Hewage, Kasun
    [J]. COMPLEX & INTELLIGENT SYSTEMS, 2021, 7 (02) : 621 - 637
  • [4] Using published data in Mendelian randomization: a blueprint for efficient identification of causal risk factors
    Burgess, Stephen
    Scott, Robert A.
    Timpson, Nicholas J.
    Smith, George Davey
    Thompson, Simon G.
    [J]. EUROPEAN JOURNAL OF EPIDEMIOLOGY, 2015, 30 (07) : 543 - 552
  • [5] Comprehensive rule-based compliance checking and risk management with process mining
    Caron, Filip
    Vanthienen, Jan
    Baesens, Bart
    [J]. DECISION SUPPORT SYSTEMS, 2013, 54 (03) : 1357 - 1369
  • [6] Chapman R.J., 2001, INT J PROJ MANAG, V19, P147, DOI [10.1016/S0263-7863(99)00070-8, DOI 10.1016/S0263-7863(99)00070-8]
  • [7] Rethinking the Construction Schedule Risk of Infrastructure Projects Based on Dialectical Systems and Network Theory
    Chen, Long
    Lu, Qiuchen
    Zhao, Xiaojing
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (05)
  • [8] Knowledge Graph Improved Dynamic Risk Analysis Method for Behavior-Based Safety Management on a Construction Site
    Chen, Qihua
    Long, Danbing
    Yang, Cheng
    Xu, Hu
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2023, 39 (04)
  • [9] Identification of core risk factors and risk diffusion effect of urban underground engineering in China: A social network analysis
    Chen, Wenqiang
    Deng, Jiaojiao
    Niu, Lianchao
    [J]. SAFETY SCIENCE, 2022, 147
  • [10] Accident risk identification and its impact analyses for strategic construction safety management
    Chi, Seokho
    Han, Sangwon
    Kim, Dae Young
    Shin, Yoonjung
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2015, 21 (04) : 524 - 538